ODOT contract 250593 bid tabulation

MOE-TR 1004-02.27 (BRIDGE REPLACEMENT (1 BRIDGE)). Let by Ohio DOT on December 18, 2025, MOE. 6 bids received; low bid $1,206,919 by Alan Stone Co Inc, -17% against the engineer's estimate of $1,460,000.

Owner
Ohio DOT
Letting
18 DEC 2025
Pay items
60
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Alan Stone Co Inc$1,206,919Low-17%
2Black Horse Bridge Construction Inc$1,315,052+9.0%-10%
3Shelly & Sands Inc$1,440,529+19%-1.0%
4Complete General Construction Company$1,565,806+30%+7.0%
5J & J Bridge Company Inc$1,788,062+48%+22%
6Ohio-West Virginia Excavating Co$2,343,324+94%+61%
ODOT contract 250593: bids by rank

Engineer's estimate: $1,460,000.

Bid tabulation

LinePay itemUnitQuantity1. Alan Stone Co Inc2. Black Horse Bridge Construction Inc3. Shelly & Sands Inc4. Complete General Construction Company5. J & J Bridge Company Inc6. Ohio-West Virginia Excavating Co
1Clearing and grubbing (201E11000)LS1$20,000$11,400$19,800$45,000$25,000$30,000
2Pipe removed (202E34900)FT25$35.00$30.00$12.00$50.00$30.00$50.00
3Excavation (203E10000)CY670$30.00$34.00$29.00$35.00$40.00$52.00
4Embankment (203E20000)CY626$15.00$32.00$18.00$22.00$35.00$80.00
5Subgrade compaction (204E10000)SY649$4.50$9.00$7.00$8.50$6.00$6.00
6Proof rolling (204E45000)HR1$270.00$200.00$220.00$300.00$350.00$3.00
7Guardrail, type MGS, as per plan (606E15051)FT50$55.00$50.00$25.00$49.98$100.00$30.00
8Anchor assembly, MGS type A (606E25550)EACH4$1,700.00$1,550.00$1,700.00$1,550.00$3,500.00$2,000.00
9MGS bridge terminal assembly, type 1 (606E35002)EACH4$2,500.00$2,300.00$2,700.00$2,300.00$2,500.00$4,000.00
10Rock channel protection, type C with filter (601E32200)CY10$340.00$200.00$220.00$350.00$180.00$700.00
11Rock channel protection, type C with geotextile fabric (601E32204)CY2$1,500.00$575.00$650.00$350.00$300.00$630.00
12Soil analysis test (659E00100)EACH2$170.00$135.00$150.00$150.00$50.00$130.00
13Topsoil (659E00300)CY147$35.00$70.00$39.00$35.00$20.00$90.00
14Seeding and mulching (659E10000)SY1,326$3.00$4.00$2.35$2.35$2.00$3.00
15Repair seeding and mulching (659E14000)SY66$25.00$1.00$2.35$2.35$2.00$3.00
16Commercial fertilizer (659E20000)TON0.18$620.00$927.78$1,250.00$1,250.00$1,000.00$1,800.00
17Lime (659E31000)ACRE0.27$890.00$162.96$150.00$150.00$1,000.00$200.00
18Water (659E35000)MGAL7$110.00$1.00$1.00$1.00$5.00$1.00
19Erosion control (832E30000)EACH2,500$1.00$1.00$1.00$1.00$1.00$1.00
20Concrete masonry (602E20000)CY1$4,500.00$3,700.00$4,200.00$7,000.00$2,200.00$4,500.00
216" conduit, type E (611E01400)FT50$40.00$20.00$18.00$6.00$6.00$110.00
226" conduit, type F (611E01500)FT50$55.00$20.00$10.00$6.00$7.00$110.00
238" conduit, type B (611E01800)FT50$45.00$24.00$12.00$8.00$10.00$165.00
2415" conduit, type A (611E05700)FT51$260.00$160.00$220.00$450.00$150.00$230.00
25Stabilized crushed aggregate (411E10000)CY145$140.00$150.00$135.00$125.00$160.00$210.00
26Barrier reflector, type 2, BI-directional (626E00110)EACH8$15.00$15.00$12.00$15.00$30.00$14.00
27Ground mounted support, no. 3 post (630E03100)FT70.50$15.00$14.00$15.00$14.00$30.00$30.00
28Street name sign support, no. 3 post (630E08520)FT10$35.00$30.00$45.00$30.00$50.00$70.00
29Street name sign support, no. 4 post (630E08530)FT13$40.00$35.00$50.00$35.00$50.00$60.00
30Sign, flat sheet (630E80100)SF52.60$35.00$30.00$25.00$30.00$35.00$45.00
31Removal of ground mounted sign and disposal (630E84900)EACH9$15.00$15.00$25.00$15.00$20.00$100.00
32Removal of ground mounted post support and disposal (630E86002)EACH6$15.00$15.00$25.00$15.00$20.00$100.00
33Structure removed (202E11000)LS1$30,000$35,000$49,000$70,000$75,000$85,000
34Cofferdams and excavation bracing (503E11100)LS1$10,500$29,400$79,000$70,000$50,000$50,000
35Unclassified excavation (503E21300)LS1$20,000$69,500$64,500$75,000$50,000$85,000
36Epoxy coated steel reinforcement (509E10000)LB34,078$1.50$1.50$1.63$1.75$3.00$4.00
37Class QC2 concrete, bridge deck (511E34444)CY88$1,400.00$1,400.00$1,800.00$1,500.00$1,200.00$3,380.00
38Class QC1 concrete with QC/QA, substructure (511E50212)CY159$750.00$600.00$1,010.00$750.00$830.00$2,260.00
39Sealing of concrete surfaces (512E10000)SY192$9.50$33.00$20.00$20.00$25.00$58.00
40Structural steel members, level 1, as per plan (513E10221)LB109,100$2.85$3.50$3.23$3.00$6.00$5.20
41Welded stud shear connectors (513E20000)EACH1,392$5.50$6.00$5.10$5.10$5.00$14.00
422" preformed expansion joint filler (516E13900)SF68$6.00$14.00$7.00$21.46$5.00$24.00
43Nylon reinforced neoprene sheeting (516E25000)SF218$30.00$24.00$28.00$28.00$20.00$35.00
44Elastomeric bearing with internal laminates and load plate (516E44200)EACH8$2,600.00$1,900.00$1,868.00$2,500.00$2,500.00$3,800.00
45Railing (twin steel tube) (517E70000)FT252$280.00$250.00$248.00$275.00$245.00$365.00
46Porous backfill with geotextile fabric (518E21200)CY89$100.00$190.00$165.00$195.00$200.00$300.00
47Special - steel drip strip (518E22300)FT293$30.00$24.00$16.00$16.00$20.00$25.00
486" perforated corrugated plastic pipe (518E40000)FT86$15.00$16.00$3.50$14.00$12.00$19.00
496" non-perforated corrugated plastic pipe, including specials (518E40010)FT111$15.00$14.00$3.50$14.00$12.00$45.00
50Drilled shafts, 30" diameter, into bedrock (524E94604)FT24$1,900.00$725.00$584.00$1,250.00$665.00$545.00
51Drilled shafts, 36" diameter, above bedrock (524E94702)FT114$120.00$460.00$425.00$725.00$665.00$275.00
52Drilled shafts, 36" diameter, into bedrock (524E94704)FT48$960.00$675.00$597.00$1,250.00$745.00$510.00
53Drilled shafts, 42" diameter, above bedrock (524E94802)FT116$150.00$600.00$514.00$725.00$745.00$250.00
54Rock channel protection, type B with geotextile fabric (601E32104)CY86$140.00$135.00$98.00$150.00$175.00$200.00
55Rock channel protection, type B with aggregate filter (601E32110)CY69$130.00$135.00$135.00$250.00$175.00$200.00
56Precast reinforced concrete outlet (611E99710)EACH4$450.00$675.00$500.00$750.00$400.00$800.00
57Premium for contract performance bond and for payment bond (103E05000)LS1$15,000$10,000$8,013.00$12,500$60,000$50,000
58Maintaining traffic (614E11000)LS1$7,500.00$5,000.00$3,400.00$9,000.00$5,000.00$15,000
59Construction layout stakes and surveying (623E10000)LS1$17,000$12,000$20,900$15,000$3,000.00$25,000
60Mobilization (624E10000)LS1$85,000$40,000$72,349$78,000$25,000$90,000
ODOT contract 250593: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of December 18, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy