ODOT contract 260418 bid tabulation
ADA-SR 41-31.36 (SLIDE REPAIR). Let by Ohio DOT on October 1, 2026, ADA. 5 bids received; low bid $561,074 by Allard Excavation LLC, -25% against the engineer's estimate of $753,000.
- Owner
- Ohio DOT
- Letting
- 01 OCT 2026
- Pay items
- 53
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Allard Excavation LLC | $561,074 | Low | -25% |
| 2 | Alan Stone Co Inc | $635,348 | +13% | -16% |
| 3 | Sunesis Construction Co | $677,788 | +21% | -10% |
| 4 | Ohio-West Virginia Excavating Co | $754,022 | +34% | 0.0% |
| 5 | Complete General Construction Company | $833,484 | +49% | +11% |
Engineer's estimate: $753,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Allard Excavation LLC | 2. Alan Stone Co Inc | 3. Sunesis Construction Co | 4. Ohio-West Virginia Excavating Co | 5. Complete General Construction Company |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $2,628.00 | $19,000 | $8,782.22 | $6,500.00 | $14,000 |
| 2 | Pavement removed, as per plan (202E23001) | SY | 555 | $27.00 | $25.00 | $33.45 | $27.00 | $50.00 |
| 3 | Guardrail removed (202E38000) | FT | 450 | $3.00 | $4.50 | $10.00 | $12.00 | $2.50 |
| 4 | Excavation (203E10000) | CY | 107 | $26.00 | $85.00 | $43.67 | $53.00 | $25.00 |
| 5 | Embankment (203E20000) | CY | 252 | $19.00 | $40.00 | $59.53 | $67.00 | $40.00 |
| 6 | Subgrade compaction (204E10000) | SY | 75 | $2.00 | $15.00 | $10.06 | $24.00 | $9.00 |
| 7 | Guardrail, type MGS half post spacing, as per plan (606E15151) | FT | 450 | $54.00 | $55.00 | $48.50 | $60.00 | $42.80 |
| 8 | Topsoil (659E00300) | CY | 127 | $33.00 | $30.00 | $34.69 | $126.00 | $40.00 |
| 9 | Seeding and mulching (659E10000) | SY | 1,144 | $4.00 | $4.00 | $3.22 | $4.00 | $3.26 |
| 10 | Commercial fertilizer (659E20000) | TON | 0.15 | $1,463.00 | $630.00 | $345.60 | $1,500.00 | $1,250.00 |
| 11 | Lime (659E31000) | ACRE | 0.24 | $176.00 | $910.00 | $51.88 | $185.00 | $150.00 |
| 12 | Water (659E35000) | MGAL | 7 | $1.00 | $110.00 | $1.39 | $1.00 | $1.00 |
| 13 | Erosion control (832E30000) | EACH | 19,050 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 14 | Seeding and erosion control with turf reinforcing mat, type 2 (836E10020) | SY | 173 | $8.00 | $10.00 | $8.06 | $8.00 | $1.00 |
| 15 | Pavement planing, asphalt concrete (1.5") (254E01000) | SY | 661 | $12.61 | $20.00 | $10.00 | $14.00 | $12.75 |
| 16 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 63 | $493.29 | $390.00 | $250.00 | $350.00 | $295.00 |
| 17 | Aggregate base (304E20000) | CY | 13 | $150.00 | $150.00 | $303.64 | $195.00 | $125.00 |
| 18 | Tack coat (407E10000) | GAL | 209 | $1.00 | $5.00 | $6.58 | $3.00 | $2.50 |
| 19 | Stabilized crushed aggregate (411E10000) | CY | 23 | $95.00 | $140.00 | $280.67 | $146.00 | $85.00 |
| 20 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 74 | $662.50 | $360.00 | $350.00 | $470.00 | $380.00 |
| 21 | RPM (621E00100) | EACH | 13 | $230.00 | $260.00 | $230.00 | $300.00 | $230.00 |
| 22 | Raised pavement marker removed (621E54000) | EACH | 13 | $8.00 | $15.00 | $6.51 | $30.00 | $50.00 |
| 23 | Barrier reflector, type 3 (BI-directional) (626E00112) | EACH | 10 | $12.00 | $15.00 | $10.00 | $30.00 | $14.50 |
| 24 | Ground mounted support, no. 3 post (630E03100) | FT | 64 | $15.00 | $15.00 | $22.00 | $30.00 | $30.00 |
| 25 | Removal of ground mounted post support and disposal (630E86002) | EACH | 4 | $12.00 | $10.00 | $35.00 | $300.00 | $25.00 |
| 26 | Removal of structure mounted sign and reerection (630E86320) | EACH | 4 | $59.00 | $55.00 | $75.00 | $300.00 | $125.00 |
| 27 | Edge line, 6", type 1 (642E00104) | MI | 0.18 | $4,800.00 | $5,400.00 | $9,180.00 | $6,500.00 | $4,800.00 |
| 28 | Center line, type 1 (642E00300) | MI | 0.09 | $4,800.00 | $5,400.00 | $18,363 | $12,000 | $4,800.00 |
| 29 | Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384) | EACH | 2 | $1,950.00 | $2,800.00 | $1,965.06 | $3,250.00 | $1,965.00 |
| 30 | Barrier reflector, type 1 (BI-directional) (614E13310) | EACH | 14 | $15.00 | $75.00 | $11.04 | $40.00 | $11.00 |
| 31 | Object marker, two way (614E13360) | EACH | 26 | $15.00 | $55.00 | $20.64 | $44.00 | $21.00 |
| 32 | Work zone edge line, class I, 4" (614E22000) | MI | 0.32 | $14,000 | $3,400.00 | $8,250.00 | $12,750 | $14,000 |
| 33 | Work zone stop line, class I (614E26000) | FT | 28 | $10.00 | $15.00 | $14.00 | $32.00 | $10.00 |
| 34 | Water (616E10000) | MGAL | 9 | $1.00 | $110.00 | $18.43 | $1.00 | $100.00 |
| 35 | Portable barrier, unanchored (622E41100) | FT | 660 | $28.50 | $35.00 | $31.54 | $55.00 | $28.50 |
| 36 | Unclassified excavation, as per plan (503E21301) | LS | 1 | $3,943.00 | $8,400.00 | $26,585 | $17,000 | $43,000 |
| 37 | Steel piles HP12X53, furnished, as per plan (507E00201) | FT | 1,165 | $64.00 | $65.00 | $70.82 | $70.00 | $60.00 |
| 38 | Concrete, misc.:class QC1, leveling pad (511E71100) | CY | 26 | $458.00 | $530.00 | $940.85 | $603.00 | $1,495.00 |
| 39 | Concrete, misc.:precast reinforced concrete laggin (511E71200) | SF | 1,656 | $21.00 | $30.00 | $47.42 | $34.00 | $85.00 |
| 40 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 667 | $53.00 | $40.00 | $39.58 | $52.00 | $25.00 |
| 41 | Porous backfill with geotextile fabric (518E21200) | CY | 90 | $105.00 | $150.00 | $127.63 | $112.00 | $125.00 |
| 42 | 6" perforated corrugated plastic pipe (518E40000) | FT | 342 | $3.00 | $4.00 | $6.44 | $18.00 | $15.00 |
| 43 | 6" non-perforated corrugated plastic pipe, including specials, as per plan (518E40011) | FT | 20 | $3.00 | $4.00 | $11.91 | $55.00 | $20.00 |
| 44 | Drilled shafts, 24" diameter, above bedrock, as per plan (524E94503) | FT | 122 | $88.00 | $130.00 | $109.42 | $115.00 | $125.00 |
| 45 | Drilled shafts, 24" diameter, into bedrock, as per plan (524E94505) | FT | 580 | $108.00 | $110.00 | $156.54 | $73.00 | $142.00 |
| 46 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 2 | $221.00 | $350.00 | $404.18 | $950.00 | $500.00 |
| 47 | Precast reinforced concrete outlet, as per plan (611E99711) | EACH | 1 | $273.00 | $420.00 | $580.15 | $1,700.00 | $500.00 |
| 48 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $4,798.00 | $5,000.00 | $4,496.06 | $9,500.00 | $6,500.00 |
| 49 | Maintaining traffic (614E11000) | LS | 1 | $34,326 | $44,000 | $33,184 | $67,000 | $50,000 |
| 50 | Roads for maintaining traffic, as per plan (615E10001) | LS | 1 | $9,483.00 | $23,000 | $14,830 | $5,500.00 | $70,000 |
| 51 | Pavement for maintaining traffic, class B, as per plan (615E25001) | SY | 261 | $112.00 | $130.00 | $135.58 | $179.00 | $125.00 |
| 52 | Construction layout stakes and surveying (623E10000) | LS | 1 | $7,610.00 | $8,500.00 | $6,500.00 | $12,500 | $8,000.00 |
| 53 | Mobilization (624E10000) | LS | 1 | $23,393 | $30,000 | $25,743 | $77,500 | $41,500 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of October 1, 2026. Compiled by Mirage Metrics.