ODOT letting results, October 1, 2026

34 contracts let by Ohio DOT on October 1, 2026, $91,263,752 in low bids, a median of 4 bidders per contract. On the 34 with an engineer's estimate, the low bid came in under it 21 times; median low bid -6.0% against the estimate.

Owner
Ohio DOT
Contracts
34
Low bids, total
$91,263,752
Data through
12 NOV 2026

Contracts let that day

ContractProjectCountyBidsLow bidderLow bidSecond bidGapAgainst estimateSource
260405DEL-US 36-00.00 (MAJOR RECONSTRUCTION)DEL3Shelly & Sands Inc$17,654,157$18,904,071+7.0%+2.0%ODOT
260424FAI-US 33-17.44 (FOUR LANE RESURFACING)FAI2Shelly Company$8,599,508$11,389,593+32%0.0%ODOT
260419BEL-IR 70-19.19 (CULVERT REPLACEMENT)BEL4Marucci & Gaffney Excavating Co$7,494,692$8,791,659+17%+96%ODOT
260440AUG-US 33 Rest Areas TP (PARKING AREAS)AUG5Helms and Sons Excavating$6,473,049$6,610,153+2.0%0.0%ODOT
260428MAH-SR 11-00.00 (FOUR LANE RESURFACING)MAH3Shelly Company$6,394,155$6,657,943+4.0%-5.0%ODOT
260425HAM-IR 71-02.26/02.94/03.44 (BRIDGE REPAIR)HAM5Sunesis Construction Co$5,667,659$5,688,0830.0%+40%ODOT
260434RIC-SR 314/SR 545-00.00/02.111 (TWO LANE RESURFACING)RIC2Kokosing Construction Company Inc$5,013,495$5,046,052+1.0%-8.0%ODOT
260432POR-US 224/VAR-18.67/VAR (TWO LANE RESURFACING)POR4Shelly & Sands Inc$4,318,587$4,367,714+1.0%+7.0%ODOT
260421BEL-SR 9-16.24, HAS-SR 9-00.00 (TWO LANE RESURFACING)BEL2Shelly & Sands Inc$3,411,349$3,820,173+12%-7.0%ODOT
260449HEN-US 6/CR 424 Infields TP (PARKING AREAS)HEN2E S Wagner - Vernon Nagel Joint Venture$3,154,858$3,696,619+17%-2.0%ODOT
260427LAW-SR 93-11.21 Flooding (MINOR RECONSTRUCTION)LAW4Allard Excavation LLC$2,734,290$2,879,195+5.0%+2.0%ODOT
260420BEL-SR 7-19.83 (FOUR LANE RESURFACING)BEL2Shelly & Sands Inc$2,529,916$2,798,750+11%+11%ODOT
260433PUT-SR 115-05.23 AND VARIOUS (CULVERT REPLACEMENT)PUT6Fenson Contracting LLC$2,035,569$2,149,855+6.0%-11%ODOT
260429MED-SR 3-20.63 (INTERSECTION)MED6Fechko Excavating LLC$1,840,224$1,875,553+2.0%-8.0%ODOT
268019NOB-SR 821-02.98 (SLIDE REPAIR)NOB4Shelly & Sands Inc$1,815,599$1,867,203+3.0%-12%ODOT
260423D07-BP FY27 (BRIDGE REPAIR)District 76Apbn Inc$1,747,185$1,926,064+10%+1.0%ODOT
260430MOT-GMR Trail IMP CR22B (BIKEWAYS)MOT8R B Jergens Contractors Inc$1,642,320$1,697,752+3.0%-8.0%ODOT
260446D09-Guardrail Project FY2027 (GUARDRAIL REBUILDING)District 94PDK Construction Inc$956,186$992,225+4.0%+2.0%ODOT
260439WAR-SR 73-01.49 S Main St Resurf (TWO LANE RESURFACING)WAR3Fillmore Construction$891,840$929,890+4.0%+9.0%ODOT
260441D02-CS FY2027 Crack Seal (CRACK SEALING)District 23Scodeller Construction Inc$773,673$876,000+13%-6.0%ODOT
260422D03-BH FY2027 (A) (BRIDGE REPAIR)District 35BCC Ohio Inc$715,231$758,972+6.0%-8.0%ODOT
260438VIN-SR 278-02.79 (CULVERT REPLACEMENT)VIN7Fillmore Construction$646,674$654,706+1.0%+14%ODOT
260418ADA-SR 41-31.36 (SLIDE REPAIR)ADA5Allard Excavation LLC$561,074$635,348+13%-25%ODOT
260445D06-ELEC-FY2027 (LIGHTING)District 64Perram Electric Inc$550,733$657,161+19%-3.0%ODOT
260450SHE-SR 119-03.60 (BRIDGE REPAIR)SHE4Brumbaugh Construction Inc$515,000$533,901+4.0%-10%ODOT
260436SCI-SR 125-00.00 (CHIP SEAL)SCI5Runway Incorporated$503,222$535,844+6.0%-12%ODOT
260437SEN-SR 18-02.76/31.37 Bridge Paint (BRIDGE PAINTING)SEN5Advanced Painting & Contracting LLC$492,907$515,265+5.0%-10%ODOT
260435SAN-US 6-17.51 Med Parapet Repr (BRIDGE REPAIR)SAN3Smith Paving & Excavating Inc$449,017$549,430+22%-2.0%ODOT
268018DEL-US 42-12.63 (CULVERT REPLACEMENT)DEL4Double Z Construction Company$409,910$438,806+7.0%-25%ODOT
260451WYA-Killdeer Plains WLF (PARKING AREAS)WYA8Advanced Excavating & Demolition LLC$327,079$347,930+6.0%-15%ODOT
264025CLI-SR 72-02.18 (CULVERT REPLACEMENT)CLI5KT Holden Construction LLC$296,299$333,725+13%-10%ODOT
260444D05-RPM FY2027 (RAISED PAVEMENT MARKERS)District 54W L Markers Inc$238,059$239,839+1.0%-21%ODOT
260448FRA-LITTER/MOW-FY2027 (MOWING)FRA3Environmental Management Services Inc$233,933$510,969+118%-32%ODOT
260442D03-LG TSG RM FY2027 (LIGHTING)District 31Perram Electric Inc$176,303+2.0%ODOT
ODOT contracts let on October 1, 2026, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy