ODOT contract 260433 bid tabulation
PUT-SR 115-05.23 AND VARIOUS (CULVERT REPLACEMENT). Let by Ohio DOT on October 1, 2026, PUT. 6 bids received; low bid $2,035,569 by Fenson Contracting LLC, -11% against the engineer's estimate of $2,280,000.
- Owner
- Ohio DOT
- Letting
- 01 OCT 2026
- Pay items
- 89
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Fenson Contracting LLC | $2,035,569 | Low | -11% |
| 2 | Advanced Excavating & Demolition LLC | $2,149,855 | +6.0% | -6.0% |
| 3 | Eclipse Co LLC | $2,161,800 | +6.0% | -5.0% |
| 4 | Miller Contracting Group Inc | $2,221,500 | +9.0% | -3.0% |
| 5 | Ebony Construction Co | $2,237,857 | +10% | -2.0% |
| 6 | Vernon Nagel Inc | $2,362,115 | +16% | +4.0% |
Engineer's estimate: $2,280,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Fenson Contracting LLC | 2. Advanced Excavating & Demolition LLC | 3. Eclipse Co LLC | 4. Miller Contracting Group Inc | 5. Ebony Construction Co | 6. Vernon Nagel Inc |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $10,000 | $20,000 | $3,000.00 | $2,400.00 | $3,500.00 | $20,000 |
| 2 | Pavement removed (202E23000) | SY | 2,169 | $13.00 | $21.00 | $45.11 | $18.00 | $25.00 | $27.00 |
| 3 | Pipe removed, 24" and under (202E35100) | FT | 3,025 | $15.50 | $12.50 | $16.89 | $7.25 | $6.00 | $10.00 |
| 4 | Guardrail removed (202E38000) | FT | 1,476.50 | $2.00 | $2.00 | $2.00 | $5.00 | $5.70 | $4.00 |
| 5 | Anchor assembly removed, type A (202E42000) | EACH | 14 | $325.00 | $350.00 | $325.00 | $213.00 | $228.00 | $200.00 |
| 6 | Catch basin removed (202E58100) | EACH | 8 | $550.00 | $775.00 | $1,112.49 | $470.00 | $500.00 | $300.00 |
| 7 | Excavation (203E10000) | CY | 1,819 | $17.00 | $25.00 | $9.89 | $8.00 | $20.00 | $15.00 |
| 8 | Embankment (203E20000) | CY | 4,959 | $21.55 | $16.00 | $13.63 | $16.00 | $20.00 | $22.00 |
| 9 | Subgrade compaction (204E10000) | SY | 2,551 | $2.00 | $2.50 | $1.94 | $1.30 | $1.50 | $1.00 |
| 10 | Guardrail, type MGS, as per plan (606E15051) | FT | 600 | $26.80 | $27.00 | $26.80 | $28.50 | $30.00 | $27.00 |
| 11 | Guardrail, type MGS, 25' long-span (606E17350) | FT | 200 | $23.60 | $24.00 | $23.60 | $36.75 | $38.00 | $27.00 |
| 12 | Anchor assembly, MGS type E (606E26150) | EACH | 7 | $2,720.00 | $2,750.00 | $2,720.00 | $2,900.00 | $3,000.00 | $2,500.00 |
| 13 | Anchor assembly, MGS type T (606E26550) | EACH | 1 | $1,480.00 | $1,500.00 | $1,480.00 | $1,500.00 | $1,700.00 | $1,300.00 |
| 14 | Monument assembly, type D (623E38550) | EACH | 17 | $2,800.00 | $1,500.00 | $350.42 | $1,350.00 | $1,075.00 | $1,800.00 |
| 15 | Right-of-way monument, type B (623E40520) | EACH | 13 | $635.00 | $1,250.00 | $307.77 | $880.00 | $885.00 | $1,800.00 |
| 16 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $3,250.00 | $4,000.00 | $2,500.00 | $8,000.00 | $8,700.00 | $2,500.00 |
| 17 | Post construction survey monument verification and report (623E51000) | LS | 1 | $3,250.00 | $4,000.00 | $2,500.00 | $8,000.00 | $8,700.00 | $2,500.00 |
| 18 | Special - mailbox support (690E50000) | EACH | 2 | $220.00 | $275.00 | $220.00 | $200.00 | $250.00 | $245.00 |
| 19 | Special - mailbox removed and reset (690E50350) | EACH | 2 | $220.00 | $275.00 | $258.42 | $350.00 | $150.00 | $190.00 |
| 20 | Rock channel protection, type B with filter (601E32100) | CY | 415 | $120.00 | $115.00 | $124.12 | $105.00 | $80.00 | $150.00 |
| 21 | Topsoil (659E00300) | CY | 1,620 | $50.00 | $40.00 | $64.91 | $33.00 | $42.00 | $45.00 |
| 22 | Seeding and mulching (659E10000) | SY | 14,592 | $1.20 | $0.90 | $0.86 | $1.90 | $1.25 | $1.10 |
| 23 | Repair seeding and mulching (659E14000) | SY | 730 | $1.20 | $0.90 | $0.86 | $1.90 | $1.25 | $1.10 |
| 24 | Commercial fertilizer (659E20000) | TON | 1.97 | $900.00 | $700.00 | $700.00 | $930.00 | $950.00 | $850.00 |
| 25 | Lime (659E31000) | ACRE | 3.01 | $35.00 | $0.50 | $0.50 | $35.00 | $40.00 | $35.00 |
| 26 | Water (659E35000) | MGAL | 80 | $1.00 | $0.10 | $0.10 | $1.00 | $1.00 | $1.00 |
| 27 | Storm water pollution prevention plan (832E15000) | LS | 1 | $950.00 | $875.00 | $875.00 | $950.00 | $1,000.00 | $3,600.00 |
| 28 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $9,750.00 | $11,500 | $4,725.00 | $5,150.00 | $6,000.00 | $2,100.00 |
| 29 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $15,300 | $14,500 | $14,250 | $15,000 | $14,500 | $12,000 |
| 30 | Erosion control (832E30000) | EACH | 30,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 31 | Concrete masonry (602E20000) | CY | 5.60 | $2,100.00 | $2,250.00 | $1,251.68 | $1,750.00 | $1,500.00 | $1,800.00 |
| 32 | Aggregate drains (605E31100) | FT | 313 | $25.00 | $31.00 | $25.44 | $31.00 | $18.50 | $20.00 |
| 33 | 6" conduit, type C (611E01100) | FT | 10 | $39.00 | $140.00 | $28.95 | $56.00 | $70.00 | $20.00 |
| 34 | 6" conduit, type F (611E01500) | FT | 10 | $33.00 | $105.00 | $19.75 | $56.00 | $85.00 | $20.00 |
| 35 | 8" conduit, type C (611E02000) | FT | 35 | $45.00 | $135.00 | $67.94 | $70.00 | $90.00 | $23.00 |
| 36 | 8" conduit, type F (611E02600) | FT | 10 | $34.00 | $70.00 | $34.37 | $50.00 | $90.00 | $23.00 |
| 37 | 12" conduit, type C (611E04600) | FT | 2,608 | $51.00 | $62.00 | $68.51 | $34.00 | $50.00 | $95.00 |
| 38 | 15" conduit, type C (611E06100) | FT | 340 | $55.00 | $74.00 | $79.53 | $37.00 | $60.00 | $100.00 |
| 39 | 72" conduit, type A, as per plan, 707.02 with CFP, (611E26001) | FT | 116 | $1,215.00 | $800.00 | $486.48 | $364.00 | $500.00 | $700.00 |
| 40 | Catch basin, no. 2-2B (611E98470) | EACH | 8 | $2,800.00 | $3,500.00 | $4,148.56 | $2,093.00 | $2,000.00 | $2,500.00 |
| 41 | Manhole, no. 3 (611E99574) | EACH | 1 | $4,900.00 | $5,000.00 | $5,786.23 | $3,900.00 | $3,600.00 | $6,000.00 |
| 42 | Low strength mortar backfill (613E41200) | CY | 505 | $191.00 | $200.00 | $240.15 | $200.00 | $170.00 | $200.00 |
| 43 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 373 | $233.00 | $220.00 | $285.00 | $313.00 | $235.00 | $250.00 |
| 44 | Aggregate base (304E20000) | CY | 619 | $62.00 | $75.00 | $87.83 | $61.00 | $81.00 | $78.00 |
| 45 | Non-tracking tack coat (407E20000) | GAL | 244 | $3.25 | $3.00 | $2.50 | $3.00 | $3.00 | $1.00 |
| 46 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 185 | $290.00 | $275.00 | $435.00 | $478.00 | $320.00 | $325.00 |
| 47 | Asphalt concrete surface course, type 1, (449), (driveways) (441E70500) | CY | 5 | $537.00 | $500.00 | $750.00 | $823.00 | $500.00 | $500.00 |
| 48 | Delineator, post ground mounted (620E00500) | EACH | 7 | $90.00 | $150.00 | $125.00 | $99.00 | $171.00 | $150.00 |
| 49 | Barrier reflector, type 2, bidirectional (626E00110) | EACH | 18 | $14.00 | $14.00 | $14.00 | $14.00 | $15.00 | $13.00 |
| 50 | Ground mounted support, no. 3 post (630E03100) | FT | 14 | $30.00 | $30.00 | $35.00 | $33.00 | $34.00 | $30.00 |
| 51 | Removal of ground mounted sign and reerection (630E85100) | EACH | 7 | $75.00 | $75.00 | $65.00 | $83.00 | $85.00 | $75.00 |
| 52 | Removal of ground mounted post support and disposal (630E86002) | EACH | 6 | $25.00 | $25.00 | $20.00 | $28.00 | $30.00 | $25.00 |
| 53 | Removal of ground mounted post support and reerection (630E86010) | EACH | 5 | $75.00 | $75.00 | $115.00 | $83.00 | $85.00 | $72.00 |
| 54 | Pavement repair (253E02000) | CY | 20 | $602.00 | $650.00 | $593.49 | $615.00 | $550.00 | $500.00 |
| 55 | Non-tracking tack coat (407E20000) | GAL | 20 | $3.25 | $3.00 | $2.50 | $2.50 | $3.00 | $1.00 |
| 56 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 10 | $354.00 | $330.00 | $750.00 | $750.00 | $650.00 | $500.00 |
| 57 | Water (616E10000) | MGAL | 20 | $65.00 | $25.00 | $3.60 | $1.00 | $1.00 | $10.00 |
| 58 | Compacted aggregate (617E10100) | CY | 50 | $105.00 | $125.00 | $62.04 | $116.00 | $125.00 | $90.00 |
| 59 | Structure removed (202E11000) | LS | 1 | $15,000 | $24,000 | $9,639.47 | $7,204.00 | $18,000 | $25,000 |
| 60 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $20,000 | $16,500 | $25,617 | $20,367 | $17,500 | $10,000 |
| 61 | Structure removed (202E11000) | LS | 1 | $24,000 | $35,000 | $9,511.76 | $7,204.00 | $20,000 | $25,000 |
| 62 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $20,000 | $16,500 | $25,617 | $20,367 | $26,000 | $16,000 |
| 63 | Unclassified excavation, including rock (503E21320) | LS | 1 | $12,500 | $15,000 | $8,342.53 | $6,243.00 | $2,000.00 | $50,000 |
| 64 | Epoxy coated steel reinforcement (509E10000) | LB | 9,152 | $1.70 | $3.00 | $2.40 | $2.00 | $2.25 | $2.25 |
| 65 | Class QC1 concrete, retaining/wingwall not including footing (511E46010) | CY | 27 | $1,750.00 | $1,000.00 | $1,366.43 | $914.00 | $2,000.00 | $1,300.00 |
| 66 | Class QC1 concrete, footing (511E46510) | CY | 81 | $370.00 | $525.00 | $479.11 | $628.00 | $1,500.00 | $550.00 |
| 67 | Class QC1 concrete, headwall (511E46610) | CY | 3 | $1,565.00 | $1,275.00 | $1,634.22 | $1,597.00 | $2,750.00 | $1,500.00 |
| 68 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 81 | $56.00 | $60.00 | $28.09 | $30.00 | $52.00 | $38.00 |
| 69 | Type 2 waterproofing (512E33000) | SY | 349 | $27.00 | $30.00 | $22.98 | $21.00 | $92.00 | $22.00 |
| 70 | 1" preformed expansion joint filler (516E13600) | SF | 58 | $13.00 | $25.00 | $5.71 | $205.00 | $67.00 | $14.00 |
| 71 | Porous backfill with geotextile fabric (518E21230) | LS | 1 | $5,300.00 | $7,500.00 | $4,131.05 | $4,300.00 | $2,500.00 | $5,000.00 |
| 72 | 16' X 8' conduit, type A, 706.05, design cover < 2 (611E96450) | FT | 80 | $1,751.00 | $2,100.00 | $2,542.22 | $2,076.00 | $2,600.00 | $2,700.00 |
| 73 | Structure removed (202E11000) | LS | 1 | $24,000 | $31,000 | $9,639.47 | $7,204.00 | $16,000 | $30,000 |
| 74 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $20,000 | $16,500 | $25,617 | $20,367 | $26,000 | $16,000 |
| 75 | Unclassified excavation (503E21300) | LS | 1 | $8,500.00 | $8,500.00 | $6,041.39 | $1,253.00 | $2,400.00 | $45,000 |
| 76 | Epoxy coated steel reinforcement (509E10000) | LB | 12,284 | $1.70 | $3.00 | $2.35 | $2.00 | $2.25 | $2.25 |
| 77 | Class QC1 concrete, retaining/wingwall not including footing (511E46010) | CY | 34 | $1,750.00 | $900.00 | $1,372.48 | $895.00 | $2,000.00 | $1,300.00 |
| 78 | Class QC1 concrete, footing (511E46510) | CY | 91 | $370.00 | $500.00 | $479.17 | $628.00 | $1,300.00 | $550.00 |
| 79 | Class QC1 concrete, headwall (511E46610) | CY | 3 | $1,565.00 | $1,300.00 | $1,634.22 | $1,649.00 | $2,600.00 | $1,500.00 |
| 80 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 96 | $56.00 | $60.00 | $26.59 | $30.00 | $49.00 | $38.00 |
| 81 | Type 2 waterproofing (512E33000) | SY | 297 | $27.00 | $30.00 | $22.23 | $21.00 | $49.00 | $22.00 |
| 82 | 1" preformed expansion joint filler (516E13600) | SF | 68 | $13.00 | $25.00 | $6.01 | $205.00 | $20.00 | $14.00 |
| 83 | Porous backfill with geotextile fabric (518E21230) | LS | 1 | $5,300.00 | $7,500.00 | $5,434.50 | $4,500.00 | $1,400.00 | $6,500.00 |
| 84 | 16' X 10' conduit, type A, 706.05, design cover 3- (611E96456) | FT | 62 | $1,976.00 | $2,500.00 | $2,882.38 | $2,290.00 | $2,900.00 | $3,000.00 |
| 85 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $15,500 | $45,000 | $21,658 | $35,900 | $13,000 | $25,000 |
| 86 | Maintaining traffic (614E11000) | LS | 1 | $37,500 | $50,000 | $11,763 | $25,400 | $21,000 | $18,000 |
| 87 | Field office, type B (619E16010) | MNTH | 3 | $1,500.00 | $1,650.00 | $3,053.87 | $2,200.00 | $4,000.00 | $1,500.00 |
| 88 | Construction layout stakes and surveying (623E10000) | LS | 1 | $18,500 | $30,000 | $10,596 | $27,600 | $58,000 | $25,000 |
| 89 | Mobilization (624E10000) | LS | 1 | $100,000 | $90,000 | $101,520 | $442,058 | $65,000 | $110,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of October 1, 2026. Compiled by Mirage Metrics.