Ebony Construction Co: ODOT bid record
Ebony Construction Co submitted 10 bids on Ohio DOT contracts in the data, from 16 JUL 2020 to 12 NOV 2026, and was the low bidder on 2 of them (20%). When it was not low, its total sat a median +10% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $941,823
- Latest bid
- 12 NOV 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 1 | 1 | 100% |
| 2025 | 2 | 0 | 0% |
| 2026 | 7 | 1 | 14% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| WOO | 2 | 1 | 50% |
| HEN | 1 | 1 | 100% |
| DEF | 1 | 0 | 0% |
| OTT | 1 | 0 | 0% |
| FUL | 1 | 0 | 0% |
| ALL | 1 | 0 | 0% |
| WIL | 1 | 0 | 0% |
| PUT | 1 | 0 | 0% |
| PAU | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 10 | 10 (100%) | $1.00 | $1.00 |
| Pipe removed, 24" and under | 202E35100 | FT | 6 | 4 (67%) | $21.50 | $25.00 |
| Pavement removed | 202E23000 | SY | 6 | 3 (50%) | $23.10 | $17.00 |
| Asphalt concrete base, PG64-22, (449) | 301E56000 | CY | 5 | 3 (60%) | $250.00 | $300.00 |
| Water | 659E35000 | MGAL | 8 | 2 (25%) | $1.07 | $1.00 |
| Aggregate base | 304E20000 | CY | 8 | 2 (25%) | $84.50 | $90.00 |
| Asphalt concrete surface course, type 1, (449), PG64-22 | 441E70000 | CY | 6 | 2 (33%) | $435.00 | $395.00 |
| Commercial fertilizer | 659E20000 | TON | 8 | 1 (13%) | $947.50 | $850.00 |
| Excavation | 203E10000 | CY | 8 | 1 (13%) | $31.75 | $27.00 |
| Embankment | 203E20000 | CY | 6 | 1 (17%) | $26.50 | $25.00 |
| Tack coat | 407E10000 | GAL | 6 | 1 (17%) | $3.50 | $3.25 |
| Subgrade compaction | 204E10000 | SY | 5 | 1 (20%) | $1.80 | $3.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Gerken Paving Inc | 3 | 2 of 3 |
| Advanced Excavating & Demolition LLC | 3 | 3 of 3 |
| Eclipse Co LLC | 3 | 2 of 3 |
| Fenson Contracting LLC | 3 | 3 of 3 |
| Geddis Paving & Excavating Inc | 2 | 2 of 2 |
| Great Lakes Demolition Company | 2 | 2 of 2 |
| Madex Construction Co | 2 | 0 of 2 |
| Vernon Nagel Inc | 2 | 0 of 2 |
| Shoreline Contractors | 1 | 1 of 1 |
| Mason Dixon Energy Services LLC | 1 | 1 of 1 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 NOV 2026 | 260507 | PAU | PAU-SR 111-16.373 (MINOR WIDENING) | 2 of 3 | $3,079,715 | +2.0% |
| 01 OCT 2026 | 260433 | PUT | PUT-SR 115-05.23 AND VARIOUS (CULVERT REPLACEMENT) | 5 of 6 | $2,237,857 | +10% |
| 17 SEP 2026 | 260416 | WIL | WIL-US 127-15.09 Culvert (CULVERT REPLACEMENT) | 3 of 3 | $471,087 | +16% |
| 27 AUG 2026 | 260358 | WOO | WOO-IR 75-06.94 Slide Repair (SLIDE REPAIR) | 1 of 4 | $374,697 | Low, 17% under the second |
| 30 JUL 2026 | 260341 | ALL | ALL-Delphos S. Main St. Trail (SIDEWALK) | 2 of 5 | $466,905 | 0.0% |
| 11 JUN 2026 | 260286 | FUL | FUL-US 20-15.07 Culvert Repl (CULVERT REPLACEMENT) | 3 of 3 | $505,555 | +7.0% |
| 12 MAR 2026 | 260131 | OTT | OTT-SR 357-02.30 Repair (MISCELLANEOUS) | 5 of 6 | $729,127 | +126% |
| 04 DEC 2025 | 250554 | DEF | DEF-SR 18-28.93 (TWO LANE RESURFACING) | 2 of 2 | $2,175,006 | +21% |
| 13 FEB 2025 | 250112 | WOO | WOO-IR 75-08.58 Weigh Station (PARKING AREAS) | 4 of 4 | $769,385 | +11% |
| 16 JUL 2020 | 200395 | HEN | HEN-/LUC-US 24/SR 2-Various (SPOT PATCHING / PAVEMENT REPAIR) | 1 of 2 | $567,127 | Low, 4.0% under the second |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.