Ebony Construction Co: ODOT bid record

Ebony Construction Co submitted 10 bids on Ohio DOT contracts in the data, from 16 JUL 2020 to 12 NOV 2026, and was the low bidder on 2 of them (20%). When it was not low, its total sat a median +10% above the low bid.

Owner
Ohio DOT
Low bid volume
$941,823
Latest bid
12 NOV 2026
Data through
12 NOV 2026
10Bids
2Low bids
20Win rate, percent
+10%Median gap to the low bid when not low, 8 bids

By year

YearBidsLow bidsWin rate
202011100%
2025200%
20267114%
Ebony Construction Co, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
WOO2150%
HEN11100%
DEF100%
OTT100%
FUL100%
ALL100%
WIL100%
PUT100%
PAU100%
Ebony Construction Co, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH1010 (100%)$1.00$1.00
Pipe removed, 24" and under202E35100FT64 (67%)$21.50$25.00
Pavement removed202E23000SY63 (50%)$23.10$17.00
Asphalt concrete base, PG64-22, (449)301E56000CY53 (60%)$250.00$300.00
Water659E35000MGAL82 (25%)$1.07$1.00
Aggregate base304E20000CY82 (25%)$84.50$90.00
Asphalt concrete surface course, type 1, (449), PG64-22441E70000CY62 (33%)$435.00$395.00
Commercial fertilizer659E20000TON81 (13%)$947.50$850.00
Excavation203E10000CY81 (13%)$31.75$27.00
Embankment203E20000CY61 (17%)$26.50$25.00
Tack coat407E10000GAL61 (17%)$3.50$3.25
Subgrade compaction204E10000SY51 (20%)$1.80$3.00
Ebony Construction Co, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Ebony Construction Co, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
12 NOV 2026260507PAUPAU-SR 111-16.373 (MINOR WIDENING)2 of 3$3,079,715+2.0%
01 OCT 2026260433PUTPUT-SR 115-05.23 AND VARIOUS (CULVERT REPLACEMENT)5 of 6$2,237,857+10%
17 SEP 2026260416WILWIL-US 127-15.09 Culvert (CULVERT REPLACEMENT)3 of 3$471,087+16%
27 AUG 2026260358WOOWOO-IR 75-06.94 Slide Repair (SLIDE REPAIR)1 of 4$374,697Low, 17% under the second
30 JUL 2026260341ALLALL-Delphos S. Main St. Trail (SIDEWALK)2 of 5$466,9050.0%
11 JUN 2026260286FULFUL-US 20-15.07 Culvert Repl (CULVERT REPLACEMENT)3 of 3$505,555+7.0%
12 MAR 2026260131OTTOTT-SR 357-02.30 Repair (MISCELLANEOUS)5 of 6$729,127+126%
04 DEC 2025250554DEFDEF-SR 18-28.93 (TWO LANE RESURFACING)2 of 2$2,175,006+21%
13 FEB 2025250112WOOWOO-IR 75-08.58 Weigh Station (PARKING AREAS)4 of 4$769,385+11%
16 JUL 2020200395HENHEN-/LUC-US 24/SR 2-Various (SPOT PATCHING / PAVEMENT REPAIR)1 of 2$567,127Low, 4.0% under the second
Ebony Construction Co: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way