Advanced Excavating & Demolition LLC: ODOT bid record
Advanced Excavating & Demolition LLC submitted 32 bids on Ohio DOT contracts in the data, from 15 DEC 2021 to 12 NOV 2026, and was the low bidder on 13 of them (41%). When it was not low, its total sat a median +7.0% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $6,524,058
- Latest bid
- 12 NOV 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 1 | 1 | 100% |
| 2022 | 1 | 1 | 100% |
| 2023 | 1 | 0 | 0% |
| 2024 | 6 | 3 | 50% |
| 2025 | 11 | 5 | 45% |
| 2026 | 12 | 3 | 25% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| HAN | 5 | 4 | 80% |
| PUT | 3 | 1 | 33% |
| LUC | 2 | 1 | 50% |
| WOO | 2 | 1 | 50% |
| DEF | 2 | 1 | 50% |
| WIL | 2 | 0 | 0% |
| WYA | 2 | 1 | 50% |
| GEA | 1 | 1 | 100% |
| HUR | 1 | 0 | 0% |
| MIA | 1 | 0 | 0% |
| RIC | 1 | 0 | 0% |
| SEN | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 29 | 29 (100%) | $1.00 | $1.00 |
| Water | 659E35000 | MGAL | 29 | 23 (79%) | $1.00 | $1.00 |
| Seeding and mulching | 659E10000 | SY | 26 | 14 (54%) | $2.55 | $2.60 |
| Guardrail removed | 202E38000 | FT | 16 | 12 (75%) | $2.40 | $2.50 |
| Lime | 659E31000 | ACRE | 16 | 11 (69%) | $35.00 | $150.00 |
| Inter-seeding | 659E15000 | SY | 15 | 11 (73%) | $0.75 | $1.00 |
| Pavement removed | 202E23000 | SY | 27 | 10 (37%) | $20.00 | $17.00 |
| Asphalt concrete surface course, type 1, (449), PG64-22 | 441E70000 | CY | 22 | 9 (41%) | $450.00 | $395.00 |
| Non-tracking tack coat | 407E20000 | GAL | 17 | 9 (53%) | $3.00 | $3.25 |
| Removal of ground mounted sign and reerection | 630E85100 | EACH | 14 | 9 (64%) | $80.00 | $75.00 |
| Sign, flat sheet | 630E80100 | SF | 11 | 9 (82%) | $23.00 | $24.00 |
| Commercial fertilizer | 659E20000 | TON | 26 | 8 (31%) | $810.00 | $850.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Crawford Construction Company Inc | 9 | 4 of 9 |
| Eclipse Co LLC | 7 | 1 of 7 |
| Fenson Contracting LLC | 7 | 3 of 7 |
| Vernon Nagel Inc | 7 | 5 of 7 |
| Great Lakes Demolition Company | 6 | 4 of 6 |
| BCC Ohio Inc | 6 | 6 of 6 |
| Kokosing Construction Company Inc | 4 | 1 of 4 |
| Geddis Paving & Excavating Inc | 4 | 3 of 4 |
| Eagle Bridge Co | 4 | 2 of 4 |
| Alan Stone Co Inc | 3 | 0 of 3 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 NOV 2026 | 260459 | FUL | FUL-US 20A-19.20 Slide Repair (SLIDE REPAIR) | 4 of 5 | $1,446,052 | +14% |
| 29 OCT 2026 | 264028 | HAN | HAN-SR 103-12.43 (BRIDGE REPAIR) | 4 of 4 | $692,761 | +19% |
| 01 OCT 2026 | 260433 | PUT | PUT-SR 115-05.23 AND VARIOUS (CULVERT REPLACEMENT) | 2 of 6 | $2,149,855 | +6.0% |
| 01 OCT 2026 | 260451 | WYA | WYA-Killdeer Plains WLF (PARKING AREAS) | 1 of 8 | $327,079 | Low, 6.0% under the second |
| 17 SEP 2026 | 260416 | WIL | WIL-US 127-15.09 Culvert (CULVERT REPLACEMENT) | 2 of 3 | $426,132 | +5.0% |
| 25 JUN 2026 | 264016 | HAN | HAN-SR 15-23.33 (INTERSECTION) | 1 of 2 | $249,186 | Low, 20% under the second |
| 11 JUN 2026 | 260302 | MER | MER-/LOG-SR 49/SR 559-23.45/03.53 (MINOR RECONSTRUCTION) | 2 of 2 | $427,465 | +1.0% |
| 21 MAY 2026 | 260265 | DEF | DEF-SR 66-04.24 (SLIDE REPAIR) | 3 of 6 | $1,597,339 | +2.0% |
| 23 APR 2026 | 260202 | HAN | HAN-McComb Ped Improvements (BIKEWAYS) | 1 of 2 | $206,097 | Low, 11% under the second |
| 12 MAR 2026 | 268001 | WYA | WYA-US 30 Rest Areas TP (PARKING AREAS) | 5 of 10 | $3,565,591 | +5.0% |
| 15 JAN 2026 | 260022 | LUC | LUC-US 20A-09.77 Roundabout (INTERSECTION) | 2 of 4 | $1,576,377 | +3.0% |
| 15 JAN 2026 | 264002 | HOL | HOL-SR 39-00.25 (CULVERT REPLACEMENT) | 5 of 7 | $530,708 | +49% |
| 13 NOV 2025 | 250538 | AUG | AUG-GLSM East Bank CR (CULVERT REPLACEMENT) | 1 of 4 | $115,201 | Low, 1.0% under the second |
| 25 SEP 2025 | 250437 | LOG | LOG-US 33-20.86 (SLIDE REPAIR) | 4 of 4 | $652,551 | +9.0% |
| 11 SEP 2025 | 254023 | ASD | ASD-SR 39-05.20 (CULVERT REPLACEMENT) | 1 of 4 | $442,608 | Low, 2.0% under the second |
| 31 JUL 2025 | 250358 | HAS | HAS-SR 149-01.17 (CULVERT REPLACEMENT) | 2 of 5 | $712,356 | 0.0% |
| 31 JUL 2025 | 250372 | HAN | HAN-SR 15-20.26 (INTERSECTION) | 1 of 3 | $221,810 | Low, 19% under the second |
| 08 MAY 2025 | 250258 | PAU | PAU-SR 637-12.27 (SLIDE REPAIR) | 5 of 6 | $1,056,440 | +42% |
| 13 FEB 2025 | 250101 | PUT | PUT-SR 108-02.65 (SLIDE REPAIR) | 1 of 3 | $1,355,230 | Low, 3.0% under the second |
| 13 FEB 2025 | 250112 | WOO | WOO-IR 75-08.58 Weigh Station (PARKING AREAS) | 3 of 4 | $742,651 | +7.0% |
| 13 FEB 2025 | 254006 | ALL | ALL-SR 117-03.47/04.64 (CULVERT REPLACEMENT) | 1 of 4 | $876,165 | Low, 5.0% under the second |
| 30 JAN 2025 | 254005 | SEN | SEN-US 224-00.13/00.65/06.94/08.48 (CULVERT REPLACEMENT) | 2 of 3 | $722,282 | +12% |
| 16 JAN 2025 | 250038 | RIC | RIC-SR 314-02.75 (CULVERT REPLACEMENT) | 6 of 8 | $430,209 | +31% |
| 14 NOV 2024 | 244025 | WIL | WIL-US 6-11.07 Bridge Repl. (CULVERT REPLACEMENT) | 5 of 5 | $731,163 | +7.0% |
| 31 OCT 2024 | 240494 | HAN | HAN-SR 37-03.32 (SPOT SAFETY) | 1 of 1 | $1,099,154 | Low |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.