ODOT contract 254005 bid tabulation
SEN-US 224-00.13/00.65/06.94/08.48 (CULVERT REPLACEMENT). Let by Ohio DOT on January 30, 2025, SEN. 3 bids received; low bid $643,252 by Great Lakes Demolition Company, -28% against the engineer's estimate of $898,000.
- Owner
- Ohio DOT
- Letting
- 30 JAN 2025
- Pay items
- 70
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Great Lakes Demolition Company | $643,252 | Low | -28% |
| 2 | Advanced Excavating & Demolition LLC | $722,282 | +12% | -20% |
| 3 | Crawford Construction Company Inc | $870,654 | +35% | -3.0% |
Engineer's estimate: $898,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Great Lakes Demolition Company | 2. Advanced Excavating & Demolition LLC | 3. Crawford Construction Company Inc |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $1,500.00 | $6,000.00 | $2,200.00 |
| 2 | Pavement removed (202E23000) | SY | 1,138 | $12.00 | $8.00 | $18.00 |
| 3 | Pipe removed, 24" and under (202E35100) | FT | 240 | $20.00 | $15.00 | $19.00 |
| 4 | Guardrail removed (202E38000) | FT | 213 | $2.00 | $2.00 | $10.00 |
| 5 | Anchor assembly removed, type E (202E42010) | EACH | 2 | $150.00 | $150.00 | $184.00 |
| 6 | Anchor assembly removed, type T (202E42040) | EACH | 2 | $100.00 | $110.00 | $184.00 |
| 7 | Catch basin removed (202E58100) | EACH | 1 | $400.00 | $550.00 | $739.00 |
| 8 | Removal misc.:riprap debris (202E98000) | LS | 1 | $3,500.00 | $2,650.00 | $370.00 |
| 9 | Removal misc.:timber deck bridge (202E98000) | LS | 1 | $5,000.00 | $400.00 | $800.00 |
| 10 | Excavation (203E10000) | CY | 294 | $20.00 | $30.00 | $45.00 |
| 11 | Embankment (203E20000) | CY | 444 | $25.00 | $20.00 | $36.00 |
| 12 | Granular material, type C (203E35120) | CY | 41 | $70.00 | $70.00 | $178.00 |
| 13 | Subgrade compaction (204E10000) | SY | 1,065 | $1.00 | $2.00 | $2.00 |
| 14 | Guardrail, type MGS (606E15050) | FT | 213 | $25.00 | $23.00 | $28.00 |
| 15 | Anchor assembly, MGS type E, MASH 2016 (606E26150) | EACH | 2 | $2,450.00 | $2,550.00 | $2,750.00 |
| 16 | Anchor assembly, MGS type T (606E26550) | EACH | 2 | $1,050.00 | $1,425.00 | $1,500.00 |
| 17 | Monument assembly, type D (623E38550) | EACH | 9 | $1,420.00 | $750.00 | $2,150.00 |
| 18 | Rock channel protection, type C with filter (601E32200) | CY | 45 | $110.00 | $120.00 | $174.00 |
| 19 | Commercial fertilizer (654E11000) | TON | 0.19 | $1,000.00 | $850.00 | $400.00 |
| 20 | Topsoil (659E00300) | CY | 155 | $50.00 | $56.00 | $42.00 |
| 21 | Seeding and mulching (659E10000) | SY | 1,388 | $3.00 | $2.32 | $4.50 |
| 22 | Repair seeding and mulching (659E14000) | SY | 70 | $1.00 | $2.32 | $1.12 |
| 23 | Inter-seeding (659E15000) | SY | 70 | $1.00 | $1.60 | $1.12 |
| 24 | Lime (659E31000) | ACRE | 0.29 | $800.00 | $35.00 | $22.41 |
| 25 | Water (659E35000) | MGAL | 1 | $1.00 | $1.00 | $1.00 |
| 26 | Erosion control (832E30000) | EACH | 5,000 | $1.00 | $1.00 | $1.00 |
| 27 | Concrete masonry (602E20000) | CY | 25 | $1,250.00 | $1,350.00 | $1,500.00 |
| 28 | 4" conduit, type F (611E00406) | FT | 8 | $10.00 | $65.00 | $24.00 |
| 29 | 6" conduit, type F (611E01500) | FT | 16 | $10.00 | $55.00 | $25.00 |
| 30 | 8" conduit, type C (611E02000) | FT | 8 | $15.00 | $90.00 | $25.00 |
| 31 | 8" conduit, type F (611E02600) | FT | 8 | $15.00 | $90.00 | $25.00 |
| 32 | 10" conduit, type F (611E03700) | FT | 8 | $35.00 | $90.00 | $40.00 |
| 33 | 12" conduit, type D (611E04900) | FT | 45 | $80.00 | $95.00 | $89.00 |
| 34 | 12" conduit, type F (611E05200) | FT | 24 | $45.00 | $61.00 | $49.00 |
| 36 | 18" conduit, type B (611E07400) | FT | 197 | $75.00 | $120.00 | $90.00 |
| 37 | 18" conduit, type F (611E08200) | FT | 8 | $65.00 | $120.00 | $177.00 |
| 38 | 24" X 38" conduit, type A, 706.04, as per plan (611E52501) | FT | 56 | $140.00 | $375.00 | $600.00 |
| 39 | 48" X 76" conduit, type A, 706.04, as per plan (611E53201) | FT | 188 | $360.00 | $520.00 | $740.00 |
| 40 | 6' X 4' conduit, type A, 706.05, as per plan (611E94701) | FT | 84 | $580.00 | $880.00 | $1,070.00 |
| 41 | Catch basin, no. 2-2B (611E98470) | EACH | 2 | $1,850.00 | $2,600.00 | $2,800.00 |
| 42 | Manhole, no. 3 (611E99574) | EACH | 3 | $3,290.00 | $3,500.00 | $4,400.00 |
| 43 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 297 | $275.00 | $290.00 | $407.00 |
| 44 | Aggregate base (304E20000) | CY | 227 | $60.00 | $70.00 | $159.00 |
| 45 | Tack coat (407E10000) | GAL | 194 | $4.00 | $4.00 | $5.60 |
| 46 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 96 | $350.00 | $362.00 | $505.00 |
| 47 | Compacted aggregate (617E10100) | CY | 29 | $70.00 | $120.00 | $459.00 |
| 48 | Raised pavement marker removed (621E54000) | EACH | 4 | $100.00 | $50.00 | $60.00 |
| 49 | Barrier reflector, type 5, bidirectional (626E00116) | EACH | 6 | $11.00 | $12.50 | $12.00 |
| 50 | Removal of ground mounted sign and reerection (630E85100) | EACH | 2 | $100.00 | $110.00 | $112.00 |
| 51 | Removal of ground mounted post support and reerection (630E86010) | EACH | 1 | $100.00 | $295.00 | $112.00 |
| 52 | Pavement removed (202E23000) | SY | 194 | $20.00 | $30.00 | $12.00 |
| 53 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 33 | $275.00 | $300.00 | $250.00 |
| 54 | Tack coat (407E10000) | GAL | 22 | $4.00 | $4.00 | $4.50 |
| 55 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 17 | $350.00 | $475.00 | $450.00 |
| 56 | Portable changeable message sign, as per plan (614E18601) | SNMT | 6 | $1,000.00 | $1,000.00 | $1,064.00 |
| 57 | Structure removed (202E11000) | LS | 1 | $18,500 | $30,000 | $10,800 |
| 58 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $8,500.00 | $17,500 | $9,400.00 |
| 59 | Unclassified excavation (503E21300) | LS | 1 | $11,500 | $23,000 | $9,200.00 |
| 60 | Epoxy coated steel reinforcement (509E10000) | LB | 2,946 | $3.00 | $3.50 | $2.50 |
| 61 | Class QC1 concrete, retaining/wingwall not including footing (511E46010) | CY | 9 | $800.00 | $1,150.00 | $1,500.00 |
| 62 | Class QC1 concrete, footing (511E46510) | CY | 18 | $650.00 | $750.00 | $1,100.00 |
| 63 | Class QC1 concrete, headwall (511E46610) | CY | 2 | $1,200.00 | $1,950.00 | $1,900.00 |
| 64 | Sealing of concrete surfaces (512E10000) | SY | 47 | $20.00 | $30.00 | $44.00 |
| 65 | Type 2 waterproofing (512E33000) | SY | 119 | $30.00 | $35.00 | $29.00 |
| 66 | 1" preformed expansion joint filler (516E13600) | SF | 31 | $20.00 | $20.00 | $26.00 |
| 67 | Porous backfill with geotextile fabric (518E21230) | LS | 1 | $10,500 | $11,500 | $3,655.00 |
| 68 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $6,500.00 | $16,000 | $7,800.00 |
| 69 | Maintaining traffic (614E11000) | LS | 1 | $12,500 | $18,000 | $9,460.00 |
| 70 | Construction layout stakes and surveying (623E10000) | LS | 1 | $14,500 | $11,000 | $11,800 |
| 71 | Mobilization (624E10000) | LS | 1 | $80,000 | $15,000 | $37,700 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of January 30, 2025. Compiled by Mirage Metrics.