ODOT contract 260022 bid tabulation
LUC-US 20A-09.77 Roundabout (INTERSECTION). Let by Ohio DOT on January 15, 2026, LUC. 4 bids received; low bid $1,529,372 by Vernon Nagel Inc, -17% against the engineer's estimate of $1,846,000.
- Owner
- Ohio DOT
- Letting
- 15 JAN 2026
- Pay items
- 121
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Vernon Nagel Inc | $1,529,372 | Low | -17% |
| 2 | Advanced Excavating & Demolition LLC | $1,576,377 | +3.0% | -15% |
| 3 | Gerken Paving Inc | $1,635,749 | +7.0% | -11% |
| 4 | Geddis Paving & Excavating Inc | $1,713,490 | +12% | -7.0% |
Engineer's estimate: $1,846,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Vernon Nagel Inc | 2. Advanced Excavating & Demolition LLC | 3. Gerken Paving Inc | 4. Geddis Paving & Excavating Inc |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $2,303.08 | $20,000 | $22,000 | $4,500.00 |
| 2 | Pavement removed (202E23000) | SY | 4,838 | $7.00 | $15.00 | $12.75 | $11.50 |
| 3 | Curb removed (202E32000) | FT | 239 | $3.50 | $15.00 | $4.50 | $7.00 |
| 4 | Pipe removed, 24" and under (202E35100) | FT | 737 | $16.00 | $20.00 | $22.00 | $35.00 |
| 5 | Catch basin removed (202E58100) | EACH | 6 | $200.00 | $850.00 | $1,125.00 | $770.00 |
| 6 | Removal misc.: 4" gas line (202E98200) | FT | 127 | $7.80 | $16.00 | $11.00 | $7.00 |
| 7 | Excavation (203E10000) | CY | 1,246 | $40.00 | $13.00 | $26.00 | $28.00 |
| 8 | Embankment (203E20000) | CY | 1,710 | $8.00 | $22.00 | $26.75 | $19.00 |
| 9 | Subgrade compaction (204E10000) | SY | 83 | $4.00 | $5.00 | $8.25 | $0.50 |
| 10 | Proof rolling (204E45000) | HR | 2 | $280.00 | $300.00 | $160.00 | $150.00 |
| 11 | Cement (206E10500) | TON | 219 | $233.00 | $215.00 | $233.00 | $240.00 |
| 12 | Curing coat (206E11000) | SY | 7,241 | $0.99 | $1.50 | $0.99 | $2.00 |
| 13 | Cement stabilized subgrade, 14 inches deep (206E15020) | SY | 7,241 | $2.39 | $5.75 | $2.39 | $2.50 |
| 14 | 8" concrete walk (608E15000) | SF | 7,703 | $10.00 | $9.00 | $9.50 | $11.50 |
| 15 | Curb ramp (608E52000) | SF | 1,338 | $15.40 | $10.00 | $9.50 | $18.50 |
| 16 | Detectable warning (608E53020) | SF | 226 | $40.00 | $40.00 | $34.00 | $45.00 |
| 17 | Monument assembly, type C (623E38500) | EACH | 5 | $1,150.00 | $875.00 | $1,850.00 | $1,150.00 |
| 18 | Soil analysis test (659E00100) | EACH | 2 | $60.00 | $150.00 | $60.00 | $67.00 |
| 19 | Topsoil (659E00300) | CY | 1,071 | $40.00 | $45.00 | $70.00 | $76.00 |
| 20 | Seeding and mulching (659E10000) | SY | 8,286 | $2.40 | $1.25 | $1.20 | $1.20 |
| 21 | Repair seeding and mulching (659E14000) | SY | 415 | $1.20 | $2.00 | $1.20 | $1.20 |
| 22 | Inter-seeding (659E15000) | SY | 415 | $1.00 | $0.75 | $1.00 | $1.00 |
| 23 | Commercial fertilizer (659E20000) | TON | 1.16 | $850.00 | $900.00 | $850.00 | $950.00 |
| 24 | Lime (659E31000) | ACRE | 1.71 | $35.00 | $5.00 | $35.00 | $40.94 |
| 25 | Water (659E35000) | MGAL | 46 | $1.00 | $0.75 | $1.00 | $1.00 |
| 26 | Ditch erosion protection (670E00700) | SY | 910 | $1.80 | $2.90 | $1.80 | $2.00 |
| 27 | Storm water pollution prevention plan (832E15000) | LS | 1 | $3,100.00 | $925.00 | $925.00 | $1,050.00 |
| 28 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $1,860.00 | $3,500.00 | $3,125.00 | $3,500.00 |
| 29 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $2,195.73 | $15,000 | $13,275 | $14,900 |
| 30 | Erosion control (832E30000) | EACH | 29,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 31 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 2 | $200.00 | $250.00 | $275.00 | $315.00 |
| 32 | 4" unclassified pipe underdrains (605E05200) | FT | 1,005 | $13.00 | $15.00 | $15.00 | $22.50 |
| 33 | 4" base pipe underdrains (605E06000) | FT | 1,993 | $13.00 | $17.00 | $11.75 | $16.00 |
| 34 | Aggregate drains (605E31100) | FT | 100 | $17.50 | $15.00 | $27.00 | $8.50 |
| 35 | 4" conduit, type E (611E00400) | FT | 140 | $22.00 | $40.00 | $28.00 | $73.00 |
| 36 | 4" conduit, type F (611E00406) | FT | 206 | $22.00 | $40.00 | $21.00 | $73.00 |
| 37 | 6" conduit, type B (611E00900) | FT | 100 | $20.00 | $55.00 | $34.00 | $49.00 |
| 38 | 6" conduit, type E (611E01400) | FT | 100 | $17.50 | $50.00 | $17.00 | $8.00 |
| 39 | 6" conduit, type F (611E01500) | FT | 100 | $17.50 | $50.00 | $17.00 | $8.00 |
| 40 | 12" conduit, type B, as per plan (611E04401) | FT | 472 | $84.40 | $95.00 | $80.00 | $105.00 |
| 41 | 12" conduit, type C (611E04600) | FT | 311 | $68.00 | $88.00 | $42.00 | $77.00 |
| 42 | 12" conduit, type D (611E04900) | FT | 93 | $61.00 | $65.00 | $47.00 | $77.00 |
| 43 | 15" conduit, type B, as per plan (611E05901) | FT | 115 | $68.00 | $90.00 | $76.00 | $120.00 |
| 44 | 21" conduit, type B, as per plan (611E08901) | FT | 58 | $225.00 | $110.00 | $155.00 | $170.00 |
| 45 | 24" conduit, type B, as per plan (611E10401) | FT | 40 | $275.00 | $92.00 | $195.00 | $250.00 |
| 46 | 24" conduit, type C (611E10600) | FT | 91 | $106.00 | $95.00 | $130.00 | $140.00 |
| 47 | Catch basin, no. 3A (611E98180) | EACH | 12 | $3,250.00 | $3,000.00 | $3,500.00 | $2,900.00 |
| 48 | Catch basin, no. 2-2B (611E98470) | EACH | 6 | $1,850.00 | $2,500.00 | $2,750.00 | $1,950.00 |
| 49 | Catch basin, no. 2-3 (611E98510) | EACH | 1 | $3,150.00 | $2,650.00 | $4,250.00 | $2,700.00 |
| 50 | Manhole, no. 3 (611E99574) | EACH | 5 | $5,450.00 | $3,700.00 | $5,250.00 | $3,200.00 |
| 51 | Manhole adjusted to grade (611E99654) | EACH | 1 | $520.00 | $750.00 | $860.00 | $810.00 |
| 52 | Manhole reconstructed to grade (611E99660) | EACH | 2 | $2,160.00 | $1,300.00 | $2,250.00 | $2,450.00 |
| 53 | Precast reinforced concrete outlet (611E99710) | EACH | 1 | $500.00 | $500.00 | $335.00 | $725.00 |
| 54 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 856 | $145.00 | $150.00 | $156.00 | $150.00 |
| 55 | Aggregate base (304E20000) | CY | 1,190 | $46.00 | $53.00 | $47.50 | $54.50 |
| 56 | Tack coat (407E10000) | GAL | 613 | $2.00 | $2.00 | $2.50 | $2.00 |
| 57 | Stabilized crushed aggregate (411E10000) | CY | 53 | $45.00 | $80.00 | $69.00 | $110.00 |
| 58 | Asphalt concrete surface course, type 1, (449), PG70-22M (441E70100) | CY | 231 | $205.00 | $210.00 | $225.00 | $210.00 |
| 59 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 347 | $174.00 | $180.00 | $180.00 | $175.00 |
| 60 | Non-reinforced concrete pavement, misc.: 8" concre (452E19200) | SY | 779 | $101.00 | $95.00 | $101.00 | $115.00 |
| 61 | Combination curb and gutter, type 2 (609E12000) | FT | 984 | $27.50 | $25.00 | $26.50 | $27.00 |
| 62 | Combination curb and gutter, type 3 (609E18000) | FT | 140 | $27.50 | $25.00 | $26.75 | $29.00 |
| 63 | Curb, type 6 (609E26000) | FT | 546 | $18.50 | $16.00 | $17.75 | $19.00 |
| 64 | Combination curb and gutter, type 9 (609E31000) | FT | 314 | $23.50 | $20.00 | $20.75 | $24.50 |
| 65 | Curb, type 10 (609E33000) | FT | 899 | $17.00 | $14.00 | $15.50 | $17.50 |
| 66 | 12" water main ductile iron pipe ansi class 53, mechanical joints and fittings (638E02504) | FT | 7 | $1,350.00 | $1,000.00 | $1,500.00 | $2,150.00 |
| 67 | Fire hydrant and gate valve removed and reset (638E10600) | EACH | 1 | $4,400.00 | $5,000.00 | $5,500.00 | $3,950.00 |
| 68 | Water work, misc.:manhole adjusted to grade (638E98000) | EACH | 4 | $400.00 | $1,250.00 | $2,400.00 | $1,200.00 |
| 69 | Water work, misc.:manhole reconstructed to grade (638E98000) | EACH | 2 | $400.00 | $1,250.00 | $2,100.00 | $1,950.00 |
| 70 | Water work, misc.:manhole relocated (638E98000) | EACH | 1 | $3,820.00 | $3,500.00 | $11,450 | $7,200.00 |
| 71 | Manhole reconstructed to grade (611E99660) | EACH | 2 | $2,600.00 | $1,250.00 | $1,250.00 | $2,200.00 |
| 72 | Connection, fused pull apart (625E00450) | EACH | 18 | $201.00 | $201.00 | $201.00 | $140.00 |
| 73 | Connection, unfused permanent (625E00480) | EACH | 12 | $201.00 | $201.00 | $201.00 | $140.00 |
| 74 | Light pole, conventional, AT10B40 (625E10490) | EACH | 3 | $5,528.00 | $5,528.00 | $5,528.00 | $4,100.00 |
| 75 | Light pole, conventional, AT12B40 (625E10490) | EACH | 2 | $5,639.00 | $5,639.00 | $5,639.00 | $4,100.00 |
| 76 | Light pole, conventional, AT15B40 (625E10490) | EACH | 4 | $5,675.00 | $5,676.00 | $5,676.00 | $4,500.00 |
| 77 | Light pole foundation, 24" X 8' deep (625E14100) | EACH | 9 | $2,429.00 | $2,429.00 | $2,429.00 | $2,000.00 |
| 78 | No. 4 AWG 2400 volt distribution cable (625E23200) | FT | 3,681 | $4.90 | $4.90 | $4.90 | $5.20 |
| 79 | No. 10 AWG pole and bracket cable (625E23400) | FT | 948 | $2.00 | $2.00 | $2.00 | $2.50 |
| 80 | Conduit, 2", 725.04 (625E25400) | FT | 892 | $6.80 | $6.80 | $6.80 | $21.00 |
| 81 | Conduit, 3", 725.04 (625E25500) | FT | 175 | $7.90 | $7.90 | $7.90 | $34.00 |
| 82 | Luminaire, conventional, solid state (LED), as per plan (625E26253) | EACH | 9 | $625.00 | $625.00 | $625.00 | $460.00 |
| 83 | Trench (625E29000) | FT | 1,067 | $9.60 | $9.60 | $9.60 | $12.00 |
| 84 | Pull box, 725.08, 18" (625E30700) | EACH | 7 | $1,484.00 | $1,484.00 | $1,484.00 | $1,150.00 |
| 85 | Ground rod (625E32000) | EACH | 9 | $516.00 | $516.00 | $516.00 | $275.00 |
| 86 | Power service, as per plan (625E34001) | EACH | 1 | $8,847.00 | $8,847.00 | $8,847.00 | $8,400.00 |
| 87 | Underground warning marking tape (625E36010) | FT | 1,067 | $2.70 | $2.70 | $2.70 | $2.00 |
| 88 | Temporary lighting (625E39000) | LS | 1 | $111.00 | $111.00 | $111.00 | $8,000.00 |
| 89 | Arc flash calculations and label (PS-A) (625E76000) | EACH | 1 | $1,178.00 | $1,778.00 | $1,778.00 | $3,400.00 |
| 90 | Delineator, misc.: base mounted (620E70000) | EACH | 4 | $185.00 | $350.00 | $350.00 | $200.00 |
| 91 | RPM (621E00100) | EACH | 107 | $82.50 | $86.00 | $82.50 | $95.50 |
| 92 | Ground mounted support, no. 3 post, as per plan (630E03101) | FT | 559 | $15.20 | $14.00 | $14.00 | $17.00 |
| 93 | Sign post reflector, as per plan (630E08601) | EACH | 16 | $45.00 | $40.00 | $40.00 | $50.50 |
| 94 | Sign, flat sheet (630E80100) | SF | 286.20 | $21.00 | $21.00 | $21.00 | $23.50 |
| 95 | Removal of ground mounted sign and disposal (630E84900) | EACH | 10 | $12.00 | $25.00 | $25.00 | $13.50 |
| 96 | Removal of ground mounted post support and disposal (630E86002) | EACH | 7 | $19.00 | $25.00 | $25.00 | $21.50 |
| 97 | Edge line, 6" (644E00104) | MI | 0.50 | $5,500.00 | $8,000.00 | $8,000.00 | $5,500.00 |
| 98 | Center line (644E00300) | MI | 0.23 | $7,500.00 | $10,000 | $10,000 | $7,500.00 |
| 99 | Crosswalk line, 24" (644E00630) | FT | 294 | $7.00 | $7.00 | $7.00 | $7.00 |
| 100 | Transverse/diagonal line (644E00700) | FT | 133 | $7.00 | $7.00 | $7.00 | $7.00 |
| 101 | Lane arrow (644E01300) | EACH | 4 | $125.00 | $100.00 | $100.00 | $125.00 |
| 102 | Dotted line, 6" (644E01510) | FT | 216 | $2.00 | $1.50 | $1.50 | $2.00 |
| 103 | Yield line (644E20800) | FT | 72 | $20.00 | $10.00 | $10.00 | $20.00 |
| 104 | Mulch (661E00500) | CY | 9 | $90.00 | $90.00 | $90.00 | $90.00 |
| 105 | Perennials, schizachyrium scoparium (661E14000) | EACH | 25 | $25.50 | $60.00 | $25.50 | $25.50 |
| 106 | Perennials, sporobolus heteroleps (661E14000) | EACH | 38 | $25.50 | $60.00 | $25.50 | $25.50 |
| 107 | Deciduous shrub, 5' height, viburnum prunifolium (661E20100) | EACH | 3 | $126.00 | $700.00 | $126.00 | $126.00 |
| 108 | Landscape watering (661E31000) | GAL | 301 | $1.00 | $5.00 | $1.00 | $1.00 |
| 109 | Planting, misc.:landscaping fabric under washed ST (661E99930) | SY | 448 | $6.75 | $2.60 | $6.75 | $7.50 |
| 110 | Planting, misc.:washed stone, 2" to 3" (661E99930) | SY | 448 | $25.67 | $35.00 | $25.67 | $29.00 |
| 111 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 80 | $70.00 | $92.00 | $122.00 | $145.00 |
| 112 | Detour signing (614E12420) | LS | 1 | $2,250.00 | $2,500.00 | $2,250.00 | $20,000 |
| 113 | Portable changeable message sign, as per plan (614E18601) | SNMT | 16 | $1,000.00 | $1,000.00 | $1,000.00 | $1,150.00 |
| 114 | Work zone stop line, class I, 642 paint (614E26200) | FT | 36 | $10.00 | $10.00 | $10.00 | $11.00 |
| 115 | Water (616E10000) | MGAL | 10 | $26.00 | $10.00 | $60.00 | $11.50 |
| 116 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $11,930 | $30,000 | $12,250 | $14,700 |
| 117 | CPM progress schedule short duration projects (108E30000) | LS | 1 | $5,000.00 | $10,500 | $7,500.00 | $1,150.00 |
| 118 | Maintaining traffic (614E11000) | LS | 1 | $57,450 | $30,000 | $12,228 | $29,999 |
| 119 | Field office, type B (619E16010) | MNTH | 6 | $1,950.00 | $1,250.00 | $4,500.00 | $1,000.00 |
| 120 | Construction layout stakes and surveying (623E10000) | LS | 1 | $30,000 | $23,000 | $25,760 | $38,800 |
| 121 | Mobilization (624E10000) | LS | 1 | $74,520 | $30,000 | $80,500 | $50,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of January 15, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.