Gerken Paving Inc: ODOT bid record
Gerken Paving Inc submitted 124 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 12 NOV 2026, and was the low bidder on 48 of them (39%). When it was not low, its total sat a median +8.0% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $194,819,683
- Latest bid
- 12 NOV 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 22 | 11 | 50% |
| 2021 | 22 | 7 | 32% |
| 2022 | 16 | 5 | 31% |
| 2023 | 17 | 7 | 41% |
| 2024 | 13 | 4 | 31% |
| 2025 | 21 | 8 | 38% |
| 2026 | 13 | 6 | 46% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| WOO | 19 | 8 | 42% |
| OTT | 12 | 4 | 33% |
| ERI | 12 | 3 | 25% |
| HUR | 12 | 5 | 42% |
| SEN | 11 | 2 | 18% |
| SAN | 10 | 1 | 10% |
| HEN | 8 | 5 | 63% |
| WIL | 8 | 7 | 88% |
| LUC | 8 | 1 | 13% |
| FUL | 6 | 5 | 83% |
| PAU | 5 | 1 | 20% |
| DEF | 4 | 4 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 108 | 108 (100%) | $1.00 | $1.00 |
| RPM | 621E00100 | EACH | 90 | 72 (80%) | $33.50 | $52.92 |
| Center line, type 1 | 642E00300 | MI | 79 | 63 (80%) | $900.00 | $5,500.00 |
| Stop line | 644E00500 | FT | 81 | 61 (75%) | $8.00 | $8.29 |
| Edge line, 6", type 1 | 642E00104 | MI | 80 | 60 (75%) | $800.00 | $3,200.00 |
| Non-tracking tack coat | 407E20000 | GAL | 74 | 58 (78%) | $2.00 | $3.25 |
| Guardrail removed | 202E38000 | FT | 57 | 54 (95%) | $2.00 | $2.50 |
| Replacement sign | 614E12500 | EACH | 62 | 48 (77%) | $120.00 | $192.00 |
| Guardrail, type MGS | 606E15050 | FT | 47 | 45 (96%) | $19.60 | $22.73 |
| Water | 659E35000 | MGAL | 56 | 44 (79%) | $1.00 | $1.00 |
| Seeding and mulching | 659E10000 | SY | 62 | 43 (69%) | $2.70 | $2.60 |
| Joint sealer | 516E31000 | FT | 48 | 43 (90%) | $17.00 | $20.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Erie Blacktop Inc | 48 | 28 of 48 |
| Shelly Company | 45 | 23 of 45 |
| Kokosing Construction Company Inc | 43 | 21 of 43 |
| M & B Asphalt Co Inc | 19 | 13 of 19 |
| Miller Bros Const Inc | 5 | 4 of 5 |
| Vernon Nagel Inc | 5 | 4 of 5 |
| Geddis Paving & Excavating Inc | 5 | 3 of 5 |
| Shelly & Sands Inc | 5 | 2 of 5 |
| Crestline Paving & Excavating Co Inc | 3 | 2 of 3 |
| Karvo Companies Inc | 3 | 0 of 3 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 NOV 2026 | 260506 | LUC | LUC-SR 295-02.48 Resurfacing (TWO LANE RESURFACING) | 2 of 2 | $2,666,366 | +3.0% |
| 12 NOV 2026 | 260507 | PAU | PAU-SR 111-16.373 (MINOR WIDENING) | 1 of 3 | $3,026,783 | Low, 2.0% under the second |
| 15 OCT 2026 | 260464 | WOO | WOO-/HEN-SR 18/SR 64/SR 582-00.00/09.18/05.35 (TWO LANE RESURFACING) | 1 of 2 | $4,217,030 | Low, 7.0% under the second |
| 13 AUG 2026 | 260370 | SEN | SEN-US 224-00.00 Resurfacing (TWO LANE RESURFACING) | 2 of 5 | $4,106,707 | +11% |
| 13 AUG 2026 | 260373 | WIL | WIL-SR 49-09.29/16.27 Resurfacing (TWO LANE RESURFACING) | 1 of 1 | $3,899,993 | Low |
| 21 MAY 2026 | 260266 | HUR | HUR-/ERI-SR 113/SR 99-06.689/14.951 (TWO LANE RESURFACING) | 1 of 2 | $1,731,157 | Low, 3.0% under the second |
| 07 MAY 2026 | 260254 | WIL | WIL-SR 34-00.00 Resurfacing (TWO LANE RESURFACING) | 1 of 1 | $2,887,358 | Low |
| 23 APR 2026 | 260197 | ERI | ERI-SR 2/SR 4-07.72/08.24 (FOUR LANE RESURFACING) | 2 of 2 | $13,329,269 | +13% |
| 23 APR 2026 | 260214 | SAN | SAN-US 20-28.02 Resurfacing (FOUR LANE RESURFACING) | 2 of 3 | $4,565,802 | +4.0% |
| 09 APR 2026 | 260178 | LUC | LUC-/OTT-SR 2-34.05/00.00 Resurf (TWO LANE RESURFACING) | 3 of 3 | $3,979,364 | +17% |
| 26 MAR 2026 | 260158 | WOO | WOO-SR 25-06.64 Resurface Portage (FOUR LANE RESURFACING) | 1 of 2 | $1,171,249 | Low, 5.0% under the second |
| 15 JAN 2026 | 260022 | LUC | LUC-US 20A-09.77 Roundabout (INTERSECTION) | 3 of 4 | $1,635,749 | +7.0% |
| 15 JAN 2026 | 260024 | PAU | PAU-SR 49/SR 500/SR 613-Varies (TWO LANE RESURFACING) | 2 of 2 | $2,096,697 | +31% |
| 18 DEC 2025 | 250601 | WOO | WOO-IR 75/IR 475-24.85/00.00 Resurf (PART 1 AND PART 2) (FOUR LANE RESURFACING) | 1 of 3 | $10,954,808 | Low, 3.0% under the second |
| 04 DEC 2025 | 250554 | DEF | DEF-SR 18-28.93 (TWO LANE RESURFACING) | 1 of 2 | $1,797,217 | Low, 21% under the second |
| 04 DEC 2025 | 250573 | CRA | CRA-RM FY2026 (SPOT PATCHING / PAVEMENT REPAIR) | 2 of 3 | $1,867,855 | +25% |
| 13 NOV 2025 | 250534 | SAN | SAN-/SEN-SR 18-00.00/30.47 (TWO LANE RESURFACING) | 4 of 4 | $2,433,541 | +10% |
| 23 OCT 2025 | 250496 | ERI | ERI-SR 2-24.50 (FOUR LANE RESURFACING) | 1 of 3 | $12,841,483 | Low, 0.0% under the second |
| 09 OCT 2025 | 250472 | WOO | WOO-/SAN-US 20/US 65-00.00/19.38 Res (FOUR LANE RESURFACING) | 2 of 4 | $4,708,181 | +7.0% |
| 09 OCT 2025 | 250475 | VAN | VAN-/PAU-US 127-12.34/00.00 (PART 1 AND PART 2) (TWO LANE RESURFACING) | 2 of 2 | $4,806,279 | +18% |
| 25 SEP 2025 | 250451 | ERI | ERI-Sheldon Marsh SNP FY2026 (PARKING AREAS) | 2 of 2 | $471,182 | +67% |
| 11 SEP 2025 | 250417 | SEN | SEN-SR 19/SR 228/SR 590-06.07/00.00/00.00 (TWO LANE RESURFACING) | 3 of 4 | $2,494,741 | +9.0% |
| 31 JUL 2025 | 250367 | WIL | WIL-US 20-00.00 Resurfacing (TWO LANE RESURFACING) | 1 of 1 | $3,795,093 | Low |
| 12 JUN 2025 | 250302 | ERI | ERI-SR 101-02.72 (TWO LANE RESURFACING) | 2 of 2 | $1,949,935 | +9.0% |
| 22 MAY 2025 | 250274 | ERI | ERI-SR 2-15.89 (MINOR RECONSTRUCTION) | 1 of 4 | $6,104,814 | Low, 3.0% under the second |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.