ODOT contract 250472 bid tabulation
WOO-/SAN-US 20/US 65-00.00/19.38 Res (FOUR LANE RESURFACING). Let by Ohio DOT on October 9, 2025, WOO. 4 bids received; low bid $4,392,762 by Shelly Company, -13% against the engineer's estimate of $5,035,000.
- Owner
- Ohio DOT
- Letting
- 09 OCT 2025
- Pay items
- 65
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Shelly Company | $4,392,762 | Low | -13% |
| 2 | Gerken Paving Inc | $4,708,181 | +7.0% | -6.0% |
| 3 | Kokosing Construction Company Inc | $4,990,740 | +14% | -1.0% |
| 4 | Henry W Bergman Inc | $5,018,889 | +14% | 0.0% |
Engineer's estimate: $5,035,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Shelly Company | 2. Gerken Paving Inc | 3. Kokosing Construction Company Inc | 4. Henry W Bergman Inc |
|---|---|---|---|---|---|---|---|
| 1 | Guardrail removed (202E38000) | FT | 1,900 | $2.00 | $2.00 | $2.00 | $2.20 |
| 2 | Anchor assembly removed, type E (202E42010) | EACH | 8 | $145.00 | $145.00 | $250.00 | $160.00 |
| 3 | Anchor assembly removed, type T (202E42040) | EACH | 7 | $95.00 | $95.00 | $250.00 | $105.00 |
| 4 | Bridge terminal assembly removed (202E47000) | EACH | 4 | $65.00 | $65.00 | $250.00 | $72.00 |
| 5 | Reshaping under guardrail (209E15000) | STA | 34 | $35.00 | $35.00 | $75.00 | $38.00 |
| 6 | Linear grading (209E60500) | MI | 8 | $3,500.00 | $1,750.00 | $2,400.00 | $1,500.00 |
| 7 | Guardrail, type MGS (606E15050) | FT | 2,113 | $19.00 | $19.00 | $19.00 | $21.00 |
| 8 | Guardrail, type MGS half post spacing (606E15150) | FT | 75 | $27.20 | $27.20 | $23.00 | $30.00 |
| 9 | Guardrail, type MGS quarter post spacing (606E15250) | FT | 63 | $41.40 | $41.40 | $28.00 | $45.00 |
| 10 | Anchor assembly, MGS type E, MASH 2016 (606E26150) | EACH | 9 | $2,420.00 | $2,420.00 | $2,375.00 | $2,620.00 |
| 11 | Anchor assembly, MGS type T (606E26550) | EACH | 6 | $1,340.00 | $1,340.00 | $1,200.00 | $1,500.00 |
| 12 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 4 | $2,550.00 | $2,550.00 | $2,250.00 | $2,800.00 |
| 13 | Monument assembly adjusted to grade (623E39500) | EACH | 3 | $950.00 | $1,125.00 | $665.00 | $1,000.00 |
| 14 | Pull box removed (625E31510) | EACH | 13 | $350.00 | $830.00 | $350.00 | $250.00 |
| 15 | Topsoil (659E00300) | CY | 164 | $100.00 | $46.00 | $100.00 | $85.00 |
| 16 | Seeding and mulching (659E10000) | SY | 1,473 | $3.88 | $3.80 | $2.50 | $2.25 |
| 17 | Repair seeding and mulching (659E14000) | SY | 74 | $1.80 | $1.80 | $10.00 | $16.00 |
| 18 | Inter-seeding (659E15000) | SY | 74 | $0.10 | $0.10 | $10.00 | $8.00 |
| 19 | Commercial fertilizer (659E20000) | TON | 1 | $124.00 | $124.00 | $1,800.00 | $880.00 |
| 20 | Water (659E35000) | MGAL | 8 | $1.00 | $1.00 | $15.00 | $11.00 |
| 21 | Erosion control (832E30000) | EACH | 3,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 22 | Pavement repair (253E02000) | CY | 4,019 | $210.00 | $212.50 | $210.00 | $292.00 |
| 23 | Pavement planing, asphalt concrete, 1 3/4" (254E01000) | SY | 59,253 | $1.55 | $1.80 | $2.00 | $1.65 |
| 24 | Diamond grinding portland cement concrete pavement (257E10000) | SY | 15,115 | $5.75 | $4.54 | $4.54 | $5.50 |
| 25 | Tack coat (407E10000) | GAL | 19,740 | $2.00 | $2.25 | $2.50 | $4.00 |
| 26 | Asphalt concrete surface course, 12.5 MM, type A (446) (442E10000) | CY | 11,429 | $208.00 | $217.50 | $225.00 | $222.00 |
| 27 | Compacted aggregate (617E10100) | CY | 240 | $90.00 | $100.00 | $75.00 | $85.00 |
| 28 | Rumble strips, shoulder (concrete) (618E40200) | FT | 1,547 | $1.09 | $1.09 | $1.09 | $2.00 |
| 29 | Rumble strips, shoulder (asphalt concrete) (618E40600) | MI | 8 | $875.00 | $875.00 | $875.00 | $1,000.00 |
| 30 | Void reducing asphalt membrane (vram) (872E10000) | FT | 37,566 | $2.25 | $2.50 | $3.50 | $3.30 |
| 31 | Longitudinal joint adhesive (875E10000) | LB | 5,548 | $1.00 | $2.00 | $0.78 | $2.00 |
| 32 | Pavement planing, asphalt concrete, class A, as per plan (897E01011) | SY | 175,839 | $1.62 | $1.62 | $1.50 | $1.40 |
| 33 | RPM (621E00100) | EACH | 1,233 | $34.50 | $34.50 | $33.75 | $38.00 |
| 34 | Raised pavement marker removed (621E54000) | EACH | 1,233 | $5.30 | $5.30 | $2.30 | $6.00 |
| 35 | Barrier reflector, type 5, bidirectional (626E00116) | EACH | 52 | $13.65 | $13.65 | $13.00 | $15.00 |
| 36 | Edge line, 6", type 1 (642E00104) | MI | 15 | $850.00 | $825.00 | $850.00 | $930.00 |
| 37 | Lane line, 6", type 1 (642E00204) | MI | 8 | $550.00 | $625.00 | $550.00 | $600.00 |
| 38 | Center line, type 1 (642E00300) | MI | 11 | $850.00 | $925.00 | $850.00 | $930.00 |
| 39 | Channelizing line, 8" (644E00400) | FT | 1,861 | $2.00 | $2.00 | $2.00 | $2.20 |
| 40 | Stop line (644E00500) | FT | 371 | $7.00 | $8.00 | $7.00 | $7.70 |
| 41 | Transverse/diagonal line (644E00700) | FT | 24 | $7.00 | $10.00 | $7.00 | $7.70 |
| 42 | Lane arrow (644E01300) | EACH | 78 | $95.00 | $110.00 | $95.00 | $105.00 |
| 43 | Dotted line, 6" (644E01510) | FT | 926 | $1.50 | $2.00 | $1.50 | $2.00 |
| 44 | Removal of miscellaneous traffic signal item: loop (632E90020) | EACH | 1 | $2,500.00 | $2,500.00 | $2,500.00 | $2,700.00 |
| 45 | Signalization, misc.: unlash and relash messenger (632E90500) | FT | 515 | $3.00 | $3.00 | $3.00 | $3.30 |
| 46 | Stop line radar detection (809E69100) | EACH | 4 | $9,050.00 | $9,050.00 | $9,050.00 | $10,000 |
| 47 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 50 | $65.00 | $98.00 | $130.00 | $85.00 |
| 48 | Work zone marking sign (614E12460) | EACH | 30 | $85.00 | $120.00 | $105.30 | $95.00 |
| 49 | Work zone increased penalties sign (614E12484) | EACH | 6 | $200.00 | $130.00 | $250.15 | $220.00 |
| 50 | Replacement sign (614E12500) | EACH | 5 | $133.00 | $130.00 | $239.36 | $150.00 |
| 51 | Replacement drum (614E12600) | EACH | 5 | $45.00 | $55.00 | $55.00 | $50.00 |
| 52 | Portable changeable message sign, as per plan (614E18601) | SNMT | 6 | $1,000.00 | $1,400.00 | $1,350.00 | $1,100.00 |
| 53 | Work zone lane line, class I, 4" (614E20000) | MI | 16 | $550.00 | $530.00 | $450.00 | $600.00 |
| 54 | Work zone center line, class I, 642 paint (614E21100) | MI | 22 | $850.00 | $925.00 | $750.00 | $930.00 |
| 55 | Work zone edge line, class I, 6", 642 paint (614E22110) | MI | 29 | $850.00 | $825.00 | $750.00 | $930.00 |
| 56 | Work zone channelizing line, class I, 8" (614E23000) | FT | 1,861 | $0.50 | $1.00 | $0.35 | $0.60 |
| 57 | Work zone channelizing line, class III, 8", 642 paint (614E23680) | FT | 1,861 | $0.50 | $1.00 | $0.35 | $0.60 |
| 58 | Work zone stop line, class I (614E26000) | FT | 371 | $3.00 | $3.00 | $2.00 | $3.30 |
| 59 | Work zone stop line, class III, 642 paint (614E26610) | FT | 371 | $3.00 | $3.00 | $2.00 | $3.30 |
| 60 | Work zone arrow, class I (614E30000) | EACH | 156 | $35.00 | $60.00 | $30.00 | $38.00 |
| 61 | Digital speed limit (DSL) sign assembly (808E18700) | SNMT | 20 | $850.00 | $1,500.00 | $900.00 | $950.00 |
| 62 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $10,000 | $22,000 | $20,000 | $30,000 |
| 63 | Maintaining traffic (614E11000) | LS | 1 | $70,000 | $170,000 | $273,350 | $100,000 |
| 64 | Construction layout stakes and surveying (623E10000) | LS | 1 | $11,010 | $11,010 | $5,800.00 | $15,000 |
| 65 | Mobilization (624E10000) | LS | 1 | $80,000 | $135,000 | $250,000 | $100,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of October 9, 2025. Compiled by Mirage Metrics.