ODOT contract 250601 bid tabulation
WOO-IR 75/IR 475-24.85/00.00 Resurf (PART 1 AND PART 2) (FOUR LANE RESURFACING). Let by Ohio DOT on December 18, 2025, WOO. 3 bids received; low bid $10,954,808 by Gerken Paving Inc, +7.6% against the engineer's estimate of $10,184,000.
- Owner
- Ohio DOT
- Letting
- 18 DEC 2025
- Pay items
- 81
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Gerken Paving Inc | $10,954,808 | Low | +8.0% |
| 2 | Kokosing Construction Company Inc | $11,257,807 | +3.0% | +11% |
| 3 | Shelly Company | $14,861,653 | +36% | +46% |
Engineer's estimate: $10,184,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Gerken Paving Inc | 2. Kokosing Construction Company Inc | 3. Shelly Company |
|---|---|---|---|---|---|---|
| 1 | Anchor assembly removed, type E (202E42010) | EACH | 9 | $160.00 | $350.00 | $160.00 |
| 2 | Linear grading (209E60500) | MI | 25 | $1,800.00 | $2,000.00 | $1,800.00 |
| 3 | Anchor assembly, MGS type E, MASH 2016 (606E26150) | EACH | 9 | $3,525.00 | $2,650.00 | $3,525.00 |
| 4 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 | $1.00 |
| 5 | Pavement repair (253E02000) | CY | 1,100 | $300.00 | $200.00 | $300.00 |
| 6 | Pavement planing, asphalt concrete, 1.75" (254E01000) | SY | 195,159 | $1.60 | $1.80 | $1.60 |
| 7 | Pavement planing, asphalt concrete, 3.5" (254E01000) | SY | 5,275 | $2.30 | $2.30 | $2.30 |
| 8 | Pavement planing, asphalt concrete, 3.75" (254E01000) | SY | 129,178 | $3.25 | $3.50 | $3.30 |
| 9 | Pavement planing, asphalt concrete, 4.25" (254E01000) | SY | 1,301 | $3.35 | $3.75 | $3.40 |
| 10 | Full depth pavement removal and rigid replacement, type 1, class QC RS (255E19000) | SY | 2,240 | $650.00 | $650.00 | $650.00 |
| 11 | Full depth pavement sawing (255E20000) | FT | 10,080 | $9.50 | $9.50 | $9.50 |
| 12 | Tack coat (407E10000) | GAL | 35,695 | $2.50 | $2.50 | $2.85 |
| 13 | Asphalt concrete surface course, 12.5 MM, type A (446) (442E10000) | CY | 5,328 | $223.00 | $245.00 | $300.00 |
| 14 | Asphalt concrete surface course, 12.5 MM, type A (446), as per plan (442E10001) | CY | 9,866 | $251.00 | $260.00 | $350.00 |
| 15 | Asphalt concrete intermediate course, 19 MM, type A (446) (442E10100) | CY | 10,262 | $181.00 | $202.00 | $250.00 |
| 16 | Compacted aggregate (617E10100) | CY | 2,326 | $83.00 | $40.00 | $110.00 |
| 17 | Rumble strips, shoulder (asphalt concrete) (618E40100) | FT | 126,044 | $0.22 | $0.22 | $0.22 |
| 18 | Void reducing asphalt membrane (vram) (872E10000) | FT | 88,971 | $2.60 | $2.15 | $3.09 |
| 19 | RPM (621E00100) | EACH | 1,713 | $37.50 | $37.50 | $37.50 |
| 20 | Raised pavement marker removed (621E54000) | EACH | 1,713 | $8.00 | $5.00 | $8.00 |
| 21 | Barrier reflector, type 5, 1WAY (626E00116) | EACH | 9 | $15.00 | $15.00 | $20.00 |
| 22 | Sign, flat sheet (630E80100) | SF | 69 | $24.00 | $24.00 | $24.00 |
| 23 | Removal of ground mounted sign and disposal (630E84900) | EACH | 2 | $40.00 | $40.00 | $40.00 |
| 24 | Removal of ground mounted post support and disposal (630E86002) | EACH | 2 | $80.00 | $80.00 | $80.00 |
| 25 | Signing, misc.: 6"X8" solid wood post (630E97900) | FT | 66 | $40.00 | $40.00 | $40.00 |
| 26 | Edge line, 6", type 1 (642E00104) | MI | 27 | $750.00 | $750.00 | $750.00 |
| 27 | Lane line, 6", type 1 (642E00204) | MI | 13 | $650.00 | $650.00 | $650.00 |
| 28 | Channelizing line, 12" (644E00404) | FT | 15,141 | $2.00 | $2.00 | $2.00 |
| 29 | Transverse/diagonal line (644E00700) | FT | 443 | $7.00 | $7.00 | $7.00 |
| 30 | Chevron marking (644E00720) | FT | 1,954 | $7.00 | $7.00 | $7.00 |
| 31 | Lane reduction arrow (644E01350) | EACH | 5 | $200.00 | $200.00 | $200.00 |
| 32 | Dotted line, 6" (644E01510) | FT | 8,330 | $1.00 | $1.00 | $1.00 |
| 33 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 250 | $110.00 | $120.00 | $100.00 |
| 34 | Work zone increased penalties sign (614E12484) | EACH | 14 | $200.00 | $200.00 | $200.00 |
| 35 | Replacement sign (614E12500) | EACH | 5 | $192.00 | $192.00 | $192.00 |
| 36 | Replacement drum (614E12600) | EACH | 5 | $45.00 | $75.00 | $45.00 |
| 37 | Portable changeable message sign, as per plan (614E18601) | SNMT | 38 | $900.00 | $750.87 | $925.00 |
| 38 | Work zone lane line, class I, 6", 642 paint (614E20110) | MI | 39 | $650.00 | $650.00 | $650.00 |
| 39 | Work zone edge line, class I, 6", 642 paint (614E22110) | MI | 81 | $900.00 | $900.00 | $900.00 |
| 40 | Work zone channelizing line, class I, 12", 642 paint (614E23210) | FT | 29,088 | $0.50 | $0.50 | $0.50 |
| 41 | Work zone channelizing line, class III, 12", 642 paint (614E23690) | FT | 14,544 | $0.50 | $0.50 | $0.50 |
| 42 | Work zone dotted line, class I, 6", 642 paint (614E24202) | FT | 11,458 | $0.50 | $0.50 | $0.50 |
| 43 | Work zone dotted line, class III, 6", 642 paint (614E24612) | FT | 5,729 | $0.50 | $0.50 | $0.50 |
| 44 | Digital speed limit (DSL) sign assembly (808E18700) | SNMT | 40 | $700.00 | $740.09 | $820.00 |
| 45 | Pavement removed (202E23000) | SY | 225 | $39.50 | $100.00 | $72.00 |
| 46 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 | $1.00 |
| 47 | Catch basin adjusted to grade, as per plan (611E98631) | EACH | 4 | $1,600.00 | $1,000.00 | $2,500.00 |
| 48 | Pavement planing, asphalt concrete, as per plan, V (254E01001) | SY | 4,637 | $6.75 | $6.75 | $6.75 |
| 49 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 56 | $340.00 | $400.00 | $550.00 |
| 50 | Aggregate base, as per plan (304E20001) | CY | 19 | $290.00 | $175.00 | $180.00 |
| 51 | Tack coat (407E10000) | GAL | 696 | $2.50 | $2.50 | $2.85 |
| 52 | Asphalt concrete surface course, 12.5 MM, type A (449) (442E22100) | CY | 193 | $300.00 | $400.00 | $575.00 |
| 53 | Asphalt concrete intermediate course, 12.5 MM, type A (449) (442E22300) | CY | 226 | $260.00 | $340.00 | $575.00 |
| 54 | Edge line, 4", as per plan (646E10001) | MI | 0.30 | $3,500.00 | $3,500.00 | $3,500.00 |
| 55 | Lane line, 4", as per plan (646E10101) | MI | 0.60 | $2,000.00 | $2,000.00 | $2,000.00 |
| 56 | Center line, as per plan (646E10201) | MI | 0.30 | $6,000.00 | $6,000.00 | $6,000.00 |
| 57 | Channelizing line, 8", as per plan (646E10301) | FT | 1,890 | $2.50 | $2.50 | $2.50 |
| 58 | Transverse/diagonal line, as per plan (646E10601) | FT | 148 | $12.00 | $12.00 | $12.00 |
| 59 | Chevron marking, as per plan (646E10621) | FT | 185 | $12.00 | $12.00 | $12.00 |
| 60 | Special - structures: surface smoothness (530E00200) | LS | 1 | $9,850.00 | $10,000 | $27,900 |
| 61 | Correcting elevation of concrete approach slabs with high density polyurethane (842E10000) | LB | 18,200 | $6.00 | $6.00 | $6.00 |
| 62 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 40 | $110.00 | $120.00 | $100.00 |
| 63 | Replacement sign (614E12500) | EACH | 2 | $192.00 | $192.00 | $192.00 |
| 64 | Replacement drum (614E12600) | EACH | 5 | $45.00 | $75.00 | $45.00 |
| 65 | Portable changeable message sign, as per plan (614E18601) | SNMT | 6 | $900.00 | $1,872.26 | $1,600.00 |
| 66 | Work zone lane line, class I, 4" (614E20000) | MI | 0.60 | $650.00 | $650.00 | $650.00 |
| 67 | Work zone lane line, class III, 4", 642 paint (614E20550) | MI | 0.60 | $650.00 | $650.00 | $650.00 |
| 68 | Work zone center line, class I (614E21000) | MI | 0.30 | $1,500.00 | $1,500.00 | $1,500.00 |
| 69 | Work zone center line, class III, 642 paint (614E21550) | MI | 0.30 | $1,500.00 | $1,500.00 | $1,500.00 |
| 70 | Work zone edge line, class I, 4" (614E22000) | MI | 0.30 | $900.00 | $900.00 | $900.00 |
| 71 | Work zone edge line, class III, 4", 642 paint (614E22350) | MI | 0.30 | $900.00 | $900.00 | $900.00 |
| 72 | Work zone channelizing line, class I, 8" (614E23000) | FT | 1,890 | $0.50 | $0.50 | $0.50 |
| 73 | Work zone channelizing line, class III, 8", 642 paint (614E23680) | FT | 1,890 | $0.50 | $0.50 | $0.50 |
| 74 | Raised pavement marker removed (621E54000) | EACH | 16 | $8.00 | $5.00 | $8.00 |
| 75 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $43,500 | $45,000 | $40,000 |
| 76 | CPM progress schedule short duration projects (108E30000) | LS | 1 | $7,500.00 | $2,500.00 | $10,000 |
| 77 | Maintaining traffic (614E11000) | LS | 1 | $1,045,000 | $830,000 | $1,400,000 |
| 78 | Construction layout stakes and surveying (623E10000) | LS | 1 | $13,440 | $12,250 | $13,440 |
| 79 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $3,645.00 | $12,250 | $3,645.00 |
| 80 | Mobilization (624E10000) | LS | 1 | $340,000 | $560,000 | $1,500,000 |
| 100 | Pavement planing, asphalt CONCRETE1.5? (254E01000) | SY | 1,181 | $1.60 | $3.50 | $3.40 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of December 18, 2025. Compiled by Mirage Metrics.