ODOT contract 260178 bid tabulation
LUC-/OTT-SR 2-34.05/00.00 Resurf (TWO LANE RESURFACING). Let by Ohio DOT on April 9, 2026, LUC. 3 bids received; low bid $3,388,866 by Kokosing Construction Company Inc, -10% against the engineer's estimate of $3,770,000.
- Owner
- Ohio DOT
- Letting
- 09 APR 2026
- Pay items
- 36
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Kokosing Construction Company Inc | $3,388,866 | Low | -10% |
| 2 | Erie Blacktop Inc | $3,781,213 | +12% | 0.0% |
| 3 | Gerken Paving Inc | $3,979,364 | +17% | +6.0% |
Engineer's estimate: $3,770,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Kokosing Construction Company Inc | 2. Erie Blacktop Inc | 3. Gerken Paving Inc |
|---|---|---|---|---|---|---|
| 1 | Linear grading (209E60500) | MI | 22 | $1,650.00 | $1,850.00 | $2,200.00 |
| 2 | Monument assembly adjusted to grade (623E39500) | EACH | 33 | $499.95 | $500.00 | $499.95 |
| 3 | Erosion control (832E30000) | EACH | 5,000 | $1.00 | $1.00 | $1.00 |
| 4 | Manhole adjusted to grade (611E99654) | EACH | 1 | $1,224.95 | $1,200.00 | $1,224.95 |
| 5 | Pavement repair (253E02000) | CY | 711 | $263.00 | $250.00 | $240.00 |
| 6 | Pavement planing, asphalt concrete, 1.5" (254E01000) | SY | 257,599 | $1.30 | $0.75 | $2.02 |
| 7 | Tack coat (407E10000) | GAL | 21,897 | $2.20 | $2.50 | $2.50 |
| 8 | Asphalt concrete surface course, 12.5 MM, type A (446) (442E10000) | CY | 10,696 | $204.00 | $245.00 | $230.00 |
| 9 | Compacted aggregate (617E10100) | CY | 1,380 | $40.00 | $65.00 | $76.50 |
| 10 | Rumble stripes, center line (asphalt concrete) (618E43000) | MI | 13.12 | $535.00 | $1,050.00 | $535.00 |
| 11 | Longitudinal joint preparation (874E20000) | FT | 55,917 | $0.42 | $0.60 | $2.25 |
| 12 | RPM (621E00100) | EACH | 1,225 | $34.50 | $40.00 | $36.00 |
| 13 | Raised pavement marker removed (621E54000) | EACH | 1,225 | $4.00 | $5.00 | $6.00 |
| 14 | Edge line, 6", type 1 (642E00104) | MI | 20.99 | $800.00 | $840.00 | $800.00 |
| 15 | Center line, type 1 (642E00300) | MI | 13.12 | $900.00 | $945.00 | $900.00 |
| 16 | Channelizing line, 8" (644E00400) | FT | 8,619 | $1.50 | $1.55 | $1.50 |
| 17 | Stop line (644E00500) | FT | 340 | $8.00 | $8.40 | $8.00 |
| 18 | Transverse/diagonal line (644E00700) | FT | 4,442 | $7.00 | $7.35 | $7.00 |
| 19 | Island marking (644E00900) | SF | 557 | $8.00 | $8.40 | $8.00 |
| 20 | Railroad symbol marking (644E01000) | EACH | 2 | $600.00 | $630.00 | $600.00 |
| 21 | Lane arrow (644E01300) | EACH | 99 | $95.00 | $99.75 | $95.00 |
| 22 | Dotted line, 6" (644E01510) | FT | 5,433 | $1.50 | $1.55 | $1.50 |
| 23 | Speed measurement marking (644E40000) | EACH | 10 | $150.00 | $157.50 | $150.00 |
| 24 | Work zone marking sign (614E12460) | EACH | 52 | $95.00 | $99.75 | $120.00 |
| 25 | Replacement sign (614E12500) | EACH | 5 | $150.00 | $157.50 | $120.00 |
| 26 | Replacement drum (614E12600) | EACH | 5 | $35.00 | $36.75 | $55.00 |
| 27 | Work zone center line, class I, 642 paint (614E21100) | MI | 26.24 | $900.00 | $945.00 | $900.00 |
| 28 | Work zone edge line, class I, 6", 642 paint (614E22110) | MI | 41.98 | $700.00 | $840.00 | $800.00 |
| 29 | Work zone channelizing line, class I, 8" (614E23000) | FT | 8,619 | $0.90 | $1.05 | $1.00 |
| 30 | Work zone channelizing line, class III, 8", 642 paint (614E23680) | FT | 8,619 | $0.90 | $1.05 | $1.00 |
| 31 | Work zone stop line, class I (614E26000) | FT | 340 | $2.00 | $2.10 | $2.00 |
| 32 | Work zone stop line, class III, 642 paint (614E26610) | FT | 340 | $2.00 | $2.10 | $2.00 |
| 33 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $13,550 | $15,000 | $16,000 |
| 34 | Maintaining traffic (614E11000) | LS | 1 | $82,863 | $84,000 | $99,250 |
| 35 | Construction layout stakes and surveying (623E10000) | LS | 1 | $3,300.00 | $10,000 | $34,360 |
| 36 | Mobilization (624E10000) | LS | 1 | $169,440 | $180,000 | $80,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of April 9, 2026. Compiled by Mirage Metrics.