| 1 | Pavement removed (202E23000) | SY | 576 | $19.00 | $27.00 |
| 2 | Pavement removed, as per plan (202E23001) | SY | 37.60 | $110.00 | $115.00 |
| 3 | Guardrail removed (202E38000) | FT | 725 | $2.60 | $2.00 |
| 4 | Anchor assembly removed, type A (202E42000) | EACH | 4 | $325.00 | $200.00 |
| 5 | Anchor assembly removed, type E (202E42010) | EACH | 1 | $175.00 | $200.00 |
| 6 | Anchor assembly removed, type T (202E42040) | EACH | 1 | $100.00 | $200.00 |
| 7 | Anchor assembly removed, type B (202E42050) | EACH | 2 | $135.00 | $200.00 |
| 8 | Bridge terminal assembly removed (202E47000) | EACH | 4 | $85.00 | $200.00 |
| 9 | Embankment (203E20000) | CY | 76.40 | $75.00 | $150.00 |
| 10 | Subgrade compaction (204E10000) | SY | 576 | $2.00 | $4.00 |
| 11 | Excavation of subgrade (204E13000) | CY | 192 | $42.75 | $77.50 |
| 12 | Granular material, type C (204E30020) | CY | 192 | $61.25 | $90.00 |
| 13 | Geotextile fabric (204E50000) | SY | 576 | $2.50 | $1.15 |
| 14 | Reshaping under guardrail (209E15000) | STA | 11 | $65.00 | $200.00 |
| 15 | Linear grading (209E60500) | MI | 19 | $1,268.00 | $1,500.00 |
| 16 | Preparing subgrade for shoulder paving (209E72050) | MI | 17.94 | $1,650.00 | $1,250.00 |
| 17 | Guardrail, type MGS (606E15050) | FT | 175 | $23.60 | $21.00 |
| 18 | Guardrail, type MGS with long posts (606E15100) | FT | 387.50 | $28.40 | $23.50 |
| 19 | Guardrail, type MGS, long-span (606E17360) | FT | 50 | $27.20 | $24.00 |
| 20 | Anchor assembly, MGS type E (606E26150) | EACH | 7 | $2,650.00 | $2,450.00 |
| 21 | Anchor assembly, MGS type T (606E26550) | EACH | 5 | $1,420.00 | $1,400.00 |
| 22 | Bridge terminal assembly, type 4 (606E35140) | EACH | 4 | $1,050.00 | $1,100.00 |
| 23 | Monument assembly adjusted to grade (623E39500) | EACH | 1 | $950.00 | $1,500.00 |
| 24 | Crushed aggregate slope protection (601E20010) | CY | 25.50 | $170.00 | $325.00 |
| 25 | Seeding and mulching (659E10000) | SY | 636.70 | $2.50 | $3.50 |
| 26 | Commercial fertilizer (659E20000) | TON | 0.09 | $600.00 | $850.00 |
| 27 | Water (659E35000) | MGAL | 4 | $0.10 | $4.00 |
| 28 | Erosion control (832E30000) | EACH | 300 | $1.00 | $1.00 |
| 29 | Pavement repair (253E02000) | CY | 1,567 | $215.00 | $220.00 |
| 30 | Pavement planing, asphalt concrete, 1 1/2" (254E01000) | SY | 93,662 | $1.40 | $1.31 |
| 31 | Pavement planing, asphalt concrete, 1 3/4" (254E01000) | SY | 48,769 | $1.60 | $1.55 |
| 32 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 64 | $208.00 | $250.00 |
| 33 | Asphalt concrete base, (449), as per plan, PG64-22 (301E56001) | CY | 16.70 | $750.00 | $415.00 |
| 34 | Aggregate base (304E20000) | CY | 17 | $220.00 | $105.00 |
| 35 | Tack coat (407E10000) | GAL | 7,915 | $2.40 | $2.50 |
| 36 | Asphalt concrete surface course, 12.5 MM, type A (446) (442E10000) | CY | 503 | $225.00 | $240.00 |
| 37 | Asphalt concrete surface course, 12.5 MM, type A (446), as per plan (442E10001) | CY | 5,886 | $218.50 | $215.00 |
| 38 | Special - sawing and sealing bituminous concrete joints (516E31200) | FT | 69 | $21.50 | $32.00 |
| 39 | Compacted aggregate (617E10100) | CY | 1,779 | $65.00 | $70.00 |
| 40 | Rumble stripes, center line (asphalt concrete) (618E43000) | MI | 7 | $975.00 | $975.00 |
| 41 | Void reducing asphalt membrane (vram) (872E10000) | FT | 5,646 | $5.00 | $4.25 |
| 42 | RPM (621E00100) | EACH | 674 | $39.50 | $43.00 |
| 43 | Raised pavement marker removed (621E54000) | EACH | 674 | $6.00 | $18.00 |
| 44 | Barrier reflector, type 5, 50FT spacing, BI-direct (626E00116) | EACH | 23 | $15.00 | $50.00 |
| 45 | Edge line, 6", type 1 (642E00104) | MI | 18.70 | $1,000.00 | $1,000.00 |
| 46 | Center line, type 1 (642E00300) | MI | 9.70 | $1,000.00 | $1,000.00 |
| 47 | Dotted line, 4", type 1 (642E01500) | FT | 215 | $1.00 | $1.00 |
| 48 | Channelizing line, 12" (644E00404) | FT | 557 | $3.00 | $3.00 |
| 49 | Stop line (644E00500) | FT | 47 | $8.00 | $8.00 |
| 50 | Crosswalk line, 24" (644E00630) | FT | 87 | $8.00 | $8.00 |
| 51 | Transverse/diagonal line (644E00700) | FT | 243 | $8.00 | $8.00 |
| 52 | Island marking (644E00900) | SF | 128 | $8.00 | $8.00 |
| 53 | Lane arrow (644E01300) | EACH | 6 | $120.00 | $120.00 |
| 54 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 10 | $110.00 | $110.00 |
| 55 | Work zone marking sign (614E12460) | EACH | 30 | $90.00 | $110.00 |
| 56 | Replacement drum (614E12600) | EACH | 5 | $55.00 | $55.00 |
| 57 | Portable changeable message sign, as per plan (614E18601) | SNMT | 5 | $1,000.00 | $1,255.00 |
| 58 | Work zone center line, class I (614E21000) | MI | 19.40 | $1,000.00 | $1,000.00 |
| 60 | Work zone channelizing line, class I, 12" (614E23010) | FT | 557 | $1.00 | $1.00 |
| 61 | Work zone channelizing line, class II, 12" (614E23656) | FT | 1,114 | $1.00 | $1.00 |
| 62 | Work zone stop line, class I (614E26000) | FT | 46 | $5.00 | $5.00 |
| 63 | Work zone stop line, class III, 642 paint (614E26610) | FT | 92 | $5.00 | $5.00 |
| 64 | Special - structures; surface smoothness (530E00200) | LS | 1 | $26,000 | $10,500 |
| 65 | Correcting elevation of concrete approach slabs with high density polyurethane (842E10000) | LB | 4,914 | $6.70 | $6.20 |
| 66 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $7,000.00 | $12,500 |
| 67 | Maintaining traffic (614E11000) | LS | 1 | $85,000 | $75,500 |
| 68 | Construction layout stakes and surveying (623E10000) | LS | 1 | $10,740 | $12,700 |
| 69 | Mobilization (624E10000) | LS | 1 | $40,000 | $105,000 |