M & B Asphalt Co Inc: ODOT bid record
M & B Asphalt Co Inc submitted 25 bids on Ohio DOT contracts in the data, from 13 FEB 2020 to 13 AUG 2026, and was the low bidder on 8 of them (32%). When it was not low, its total sat a median +8.0% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $22,324,342
- Latest bid
- 13 AUG 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 3 | 1 | 33% |
| 2021 | 2 | 2 | 100% |
| 2022 | 4 | 0 | 0% |
| 2023 | 5 | 2 | 40% |
| 2024 | 2 | 0 | 0% |
| 2025 | 8 | 2 | 25% |
| 2026 | 1 | 1 | 100% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| SEN | 10 | 6 | 60% |
| SAN | 9 | 1 | 11% |
| WYA | 2 | 1 | 50% |
| HAN | 2 | 0 | 0% |
| OTT | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 23 | 23 (100%) | $1.00 | $1.00 |
| Linear grading | 209E60500 | MI | 20 | 19 (95%) | $725.00 | $1,800.00 |
| Stop line | 644E00500 | FT | 20 | 16 (80%) | $8.00 | $8.29 |
| Replacement sign | 614E12500 | EACH | 19 | 14 (74%) | $100.00 | $192.00 |
| Center line, type 1 | 642E00300 | MI | 18 | 14 (78%) | $825.00 | $5,500.00 |
| Edge line, 6", type 1 | 642E00104 | MI | 19 | 12 (63%) | $850.00 | $3,200.00 |
| Work zone center line, class I | 614E21000 | MI | 14 | 11 (79%) | $825.00 | $1,632.50 |
| Lane arrow | 644E01300 | EACH | 13 | 11 (85%) | $100.00 | $110.00 |
| Guardrail removed | 202E38000 | FT | 11 | 11 (100%) | $1.80 | $2.50 |
| Guardrail, type MGS | 606E15050 | FT | 12 | 10 (83%) | $18.80 | $22.73 |
| Raised pavement marker removed | 621E54000 | EACH | 21 | 9 (43%) | $6.00 | $12.00 |
| Longitudinal joint adhesive | 875E10000 | LB | 17 | 9 (53%) | $0.75 | $2.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Gerken Paving Inc | 19 | 6 of 19 |
| Kokosing Construction Company Inc | 17 | 12 of 17 |
| Erie Blacktop Inc | 14 | 4 of 14 |
| Shelly Company | 11 | 4 of 11 |
| Henry W Bergman Inc | 3 | 1 of 3 |
| Bluffton Paving Inc | 2 | 2 of 2 |
| Geddis Paving & Excavating Inc | 2 | 2 of 2 |
| Schoen Inc | 1 | 1 of 1 |
| Expercon LLC | 1 | 0 of 1 |
| Ward Construction Co | 1 | 0 of 1 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 13 AUG 2026 | 260370 | SEN | SEN-US 224-00.00 Resurfacing (TWO LANE RESURFACING) | 1 of 5 | $3,705,852 | Low, 11% under the second |
| 13 NOV 2025 | 250534 | SAN | SAN-/SEN-SR 18-00.00/30.47 (TWO LANE RESURFACING) | 2 of 4 | $2,235,110 | +1.0% |
| 23 OCT 2025 | 250498 | HAN | HAN-SR 37-06.47 (TWO LANE RESURFACING) | 3 of 4 | $2,592,903 | +4.0% |
| 09 OCT 2025 | 250477 | WYA | WYA-SR 53-15.36 (TWO LANE RESURFACING) | 2 of 3 | $1,670,670 | +14% |
| 11 SEP 2025 | 250417 | SEN | SEN-SR 19/SR 228/SR 590-06.07/00.00/00.00 (TWO LANE RESURFACING) | 1 of 4 | $2,296,034 | Low, 8.0% under the second |
| 22 MAY 2025 | 250285 | SEN | SEN-SR 4/SR 18-07.52/15.39 Resurf (TWO LANE RESURFACING) | 2 of 4 | $3,811,122 | +2.0% |
| 24 APR 2025 | 250225 | SAN | SAN-SR-SR 53-10.45 Resurf & UrbPav (FOUR LANE RESURFACING) | 3 of 3 | $1,993,253 | +8.0% |
| 27 FEB 2025 | 250133 | SEN | SEN-US 23/SR 12-09.98/04.18 Resurf (TWO LANE RESURFACING) | 1 of 3 | $4,127,737 | Low, 1.0% under the second |
| 16 JAN 2025 | 250021 | SAN | SAN-SR 412/SR 590-08.86/06.56 Resurf (TWO LANE RESURFACING) | 4 of 4 | $4,111,792 | +13% |
| 23 MAY 2024 | 240319 | OTT | OTT-ODNR Portage River Access (PARKING AREAS) | 4 of 5 | $263,526 | +25% |
| 22 FEB 2024 | 240150 | SAN | SAN-US 6-00.00 Resurf (TWO LANE RESURFACING) | 2 of 3 | $4,040,575 | +1.0% |
| 09 NOV 2023 | 230549 | SEN | SEN-SR 18-02.45/08.94 Resurf (TWO LANE RESURFACING) | 1 of 4 | $4,132,802 | Low, 11% under the second |
| 09 MAR 2023 | 230137 | SAN | SAN-Hayes Center Paving (SPOT PATCHING / PAVEMENT REPAIR) | 1 of 3 | $471,719 | Low, 2.0% under the second |
| 09 MAR 2023 | 230157 | OTT | OTT-SR 19/SR 163-03.29/10.00 Resurf (TWO LANE RESURFACING) | 2 of 5 | $2,593,260 | +4.0% |
| 12 JAN 2023 | 230026 | SAN | SAN-SR 53-12.84 Resurfacing (TWO LANE RESURFACING) | 2 of 4 | $2,822,723 | +3.0% |
| 12 JAN 2023 | 230027 | SEN | SEN-SR 4-00.00 Resurfacing (TWO LANE RESURFACING) | 4 of 4 | $3,406,284 | +12% |
| 03 NOV 2022 | 220588 | SAN | SAN-SR 19-10.84 Resurfacing (TWO LANE RESURFACING) | 2 of 4 | $3,354,309 | +4.0% |
| 03 NOV 2022 | 220589 | SAN | SAN-US 20-03.75 (TWO LANE RESURFACING) | 3 of 4 | $5,324,860 | +9.0% |
| 29 SEP 2022 | 220531 | SEN | SEN-SR 224-19.85 Resurfacing (TWO LANE RESURFACING) | 4 of 5 | $3,905,320 | +20% |
| 28 JUL 2022 | 220448 | SEN | SEN-SR 231-00.00 Resurfacing (TWO LANE RESURFACING) | 2 of 3 | $3,017,778 | +1.0% |
| 29 APR 2021 | 210281 | SEN | SEN-SR 53/SR 100-08.36/00.00 Resurf (TWO LANE RESURFACING) | 1 of 2 | $3,354,225 | Low, 16% under the second |
| 25 FEB 2021 | 210139 | SEN | SEN-US 23-00.00 Resurf (TWO LANE RESURFACING) | 1 of 2 | $4,140,122 | Low, 4.0% under the second |
| 07 MAY 2020 | 200282 | HAN | HAN-ODNR/ODOT-Paving (PARKING AREAS) | 5 of 8 | $192,292 | +18% |
| 23 APR 2020 | 200257 | WYA | WYA-D01 WYA Garage Paving FS (PARKING AREAS) | 1 of 3 | $95,852 | Low, 4.0% under the second |
| 13 FEB 2020 | 200074 | SAN | SAN-US 20-19.32 Resurfacing (FOUR LANE RESURFACING) | 4 of 4 | $6,442,370 | +12% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.