Bluffton Paving Inc: ODOT bid record

Bluffton Paving Inc submitted 22 bids on Ohio DOT contracts in the data, from 27 FEB 2020 to 15 OCT 2026, and was the low bidder on 8 of them (36%). When it was not low, its total sat a median +10% above the low bid.

Owner
Ohio DOT
Low bid volume
$25,385,558
Latest bid
15 OCT 2026
Data through
12 NOV 2026
22Bids
8Low bids
36Win rate, percent
+10%Median gap to the low bid when not low, 14 bids

By year

YearBidsLow bidsWin rate
20206233%
2021300%
20223133%
20233267%
2024100%
20252150%
20264250%
Bluffton Paving Inc, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
ALL6350%
HAN5240%
HAR5120%
PUT4125%
LOG100%
District 111100%
Bluffton Paving Inc, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Non-tracking tack coat407E20000GAL2120 (95%)$2.00$3.25
Erosion control832E30000EACH1717 (100%)$1.00$1.00
Patching planed surface254E01600SY2216 (73%)$4.00$4.00
Work zone center line, class I614E21000MI1816 (89%)$950.00$1,632.50
Aggregate base304E20000CY1616 (100%)$24.50$90.00
Stop line644E00500FT1613 (81%)$8.50$8.29
Work zone marking sign614E12460EACH2012 (60%)$100.00$92.00
Raised pavement marker removed621E54000EACH1812 (67%)$6.00$12.00
RPM621E00100EACH1812 (67%)$36.25$52.92
Center line, type 1642E00300MI1712 (71%)$950.00$5,500.00
Edge line, 6", type 1642E00104MI1711 (65%)$800.00$3,200.00
Wearing course removed202E23500SY1910 (53%)$5.00$10.00
Bluffton Paving Inc, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Shelly Company2213 of 22
Helms and Sons Excavating43 of 4
Kokosing Construction Company Inc31 of 3
M & B Asphalt Co Inc20 of 2
Ward Construction Co21 of 2
Schoen Inc10 of 1
Geddis Paving & Excavating Inc10 of 1
Henry W Bergman Inc10 of 1
Expercon LLC10 of 1
Shelly & Sands Inc10 of 1
Bluffton Paving Inc, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
15 OCT 2026260463HARHAR-SR 81-00.00/03.98 (TWO LANE RESURFACING)2 of 2$1,989,542+4.0%
27 AUG 2026260377District 1D01-PAVE FY27 (TWO LANE RESURFACING)1 of 2$5,024,730Low, 3.0% under the second
21 MAY 2026260273PUTPUT-SR 694-00.00 (PART 1 AND PART 2) (TWO LANE RESURFACING)1 of 2$3,581,814Low, 8.0% under the second
19 FEB 2026260086HARHAR-SR 235-02.39 (TWO LANE RESURFACING)2 of 2$1,571,205+1.0%
13 NOV 2025250515ALLALL-SR 66-02.38 (TWO LANE RESURFACING)1 of 2$1,561,832Low, 20% under the second
23 OCT 2025250498HANHAN-SR 37-06.47 (TWO LANE RESURFACING)2 of 4$2,566,712+3.0%
12 SEP 2024240414ALLALL-SR 65-00.00/03.94 (TWO LANE RESURFACING)2 of 2$1,163,700+6.0%
30 NOV 2023230574PUTPUT-/ALL/HAN-SR 12/SR 115/SR 613-00.00 (TWO LANE RESURFACING)2 of 2$3,965,0280.0%
09 NOV 2023230541HANHAN-/WYA-US 30-12.22/00.00 (FOUR LANE RESURFACING)1 of 3$5,546,935Low, 0.0% under the second
09 FEB 2023230090HARHAR-SR 67-16.13 (TWO LANE RESURFACING)1 of 3$393,403Low, 5.0% under the second
15 DEC 2022220662HANHAN-US 30-02.96 (FOUR LANE RESURFACING)1 of 2$5,948,156Low, 12% under the second
13 OCT 2022220542ALLALL-/HAN/WYA-SR 103/SR 117/SR 53-VAR. (TWO LANE RESURFACING)2 of 3$717,736+6.0%
10 MAR 2022220145HARHAR-SR 31/SR 53/SR 67-10.16/Var (TWO LANE RESURFACING)3 of 3$727,587+23%
01 APR 2021210200HANHAN-/ALL-US 224/SR 103-05.25/01.79 (TWO LANE RESURFACING)2 of 2$1,672,621+21%
25 FEB 2021210137PUTPUT-US 224/SR 15/65/109/189/190 (TWO LANE RESURFACING)2 of 2$1,685,612+17%
14 JAN 2021210041LOGLOG-ODNR Indian Lake State Park (PARKING AREAS)6 of 7$959,442+26%
17 DEC 2020200586ALLALL-SR 66/SR 117-00.00/00.00/17.11 (TWO LANE RESURFACING)1 of 2$3,267,054Low, 3.0% under the second
17 DEC 2020200597HARHAR-SR 37/SR 53-00.00/01.34 (TWO LANE RESURFACING)3 of 4$2,315,336+18%
04 JUN 2020200327PUTPUT-US 224/SR 103-Var. (TWO LANE RESURFACING)2 of 2$2,191,418+3.0%
07 MAY 2020200282HANHAN-ODNR/ODOT-Paving (PARKING AREAS)2 of 8$185,643+14%
23 APR 2020200256ALLALL-D01 ALL 4th St. Paving OP (PARKING AREAS)1 of 2$61,634Low, 41% under the second
27 FEB 2020200044ALLALL-SR 65/81/117 Var. (TWO LANE RESURFACING)2 of 2$2,374,009+16%
Bluffton Paving Inc: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way