ODOT letting results, March 10, 2022
37 contracts let by Ohio DOT on March 10, 2022, $110,650,531 in low bids, a median of 3 bidders per contract. On the 37 with an engineer's estimate, the low bid came in under it 12 times; median low bid +4.0% against the estimate.
- Owner
- Ohio DOT
- Contracts
- 37
- Low bids, total
- $110,650,531
- Data through
- 12 NOV 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 220078 | UNI-US 33-24.87 (INTERCHANGE) | UNI | 3 | Complete General Construction Company | $40,335,558 | $38,904,142 | -4.0% | +10% | ODOT |
| 223002 | HAS-SR 151-04.85 (BRIDGE REPLACEMENT (1 BRIDGE)) | HAS | 6 | Ruhlin Company | $6,842,999 | $8,461,696 | +24% | +4.0% | ODOT |
| 220143 | HAM-US 50-28.10/28.25 (BRIDGE REPAIR) | HAM | 3 | Triton Construction Inc | $6,763,425 | $7,631,392 | +13% | -4.0% | ODOT |
| 220150 | SUM-IR 77-15.87 (FOUR LANE RESURFACING) | SUM | 3 | Shelly & Sands Inc | $5,133,168 | $6,138,157 | +20% | +10% | ODOT |
| 220155 | WAR-SR 48-11.54 (PART 1 AND PART 2) (BRIDGE REPAIR) | WAR | 3 | Eagle Bridge Co | $4,601,324 | $5,125,654 | +11% | +8.0% | ODOT |
| 220082 | BUT-US 27-01.85 (INTERSECTION) | BUT | 4 | Barrett Paving Materials Inc | $3,893,290 | $4,307,987 | +11% | +14% | ODOT |
| 220157 | D03-PM-FY2022 (PAVEMENT MARKING) | District 3 | 2 | Oglesby Construction Inc | $3,754,886 | $3,976,000 | +6.0% | +7.0% | ODOT |
| 220147 | MED-SR 57-01.36 (PART 1 AND PART 2) (MINOR RECONSTRUCTION) | MED | 4 | Fechko Excavating LLC | $3,621,774 | $3,668,000 | +1.0% | +5.0% | ODOT |
| 220133 | CUY-West Franklin Boulevard (MINOR RECONSTRUCTION) | CUY | 2 | Perk Company Inc | $3,435,279 | $4,918,787 | +43% | +12% | ODOT |
| 220151 | TRU-SR 5-08.30 (FOUR LANE RESURFACING) | TRU | 4 | Shelly & Sands Inc | $3,269,994 | $3,561,818 | +9.0% | -6.0% | ODOT |
| 220139 | FUL-SR 120-00.00 Resurf (TWO LANE RESURFACING) | FUL | 1 | Gerken Paving Inc | $2,293,149 | +2.0% | ODOT | ||
| 220152 | TUS-SR 258-00.00 (TWO LANE RESURFACING) | TUS | 2 | Shelly & Sands Inc | $2,069,961 | $2,867,725 | +39% | -9.0% | ODOT |
| 220154 | VAN-Grill/Kear/Bonnewitz (MINOR WIDENING) | VAN | 1 | Shelly Company | $1,829,642 | +29% | ODOT | ||
| 220132 | CUY-US 422-13.90/VAR Paint (BRIDGE PAINTING) | CUY | 7 | Industrial Painting & Rigging Inc | $1,774,277 | $1,939,882 | +9.0% | -22% | ODOT |
| 220134 | DAR-US 36/SR 121-08.35/12.65 (INTERSECTION) | DAR | 2 | Brumbaugh Construction Inc | $1,721,705 | $1,867,647 | +8.0% | -2.0% | ODOT |
| 220144 | HAM-US 52-37.99 (SLIDE REPAIR) | HAM | 4 | Kokosing Construction Company Inc | $1,670,213 | $1,970,270 | +18% | +14% | ODOT |
| 220140 | GEA-SR 87-15.93 (FOUR LANE RESURFACING) | GEA | 5 | Chagrin Valley Paving Inc | $1,649,209 | $1,739,644 | +5.0% | -1.0% | ODOT |
| 228001 | MRG-SR 376/SR 555-12.33/15.60 (SLIDE REPAIR) | MRG | 3 | Shelly & Sands Inc | $1,610,556 | $1,629,195 | +1.0% | 0.0% | ODOT |
| 220161 | MOE-SR 26-16.85 (INTERSECTION) | MOE | 3 | Shelly & Sands Inc | $1,436,083 | $1,446,786 | +1.0% | +4.0% | ODOT |
| 220128 | BEL-IR 70-16.60, TUS-IR 77-00.00/20.00 (SIGNING) | BEL | 2 | M P Dory Co | $1,284,075 | $1,412,175 | +10% | +8.0% | ODOT |
| 220129 | CHP-/SHE-VAR/VAR (BRIDGE REPAIR) | CHP | 3 | Complete General Construction Company | $1,241,410 | $1,269,271 | +2.0% | +4.0% | ODOT |
| 220153 | TUS-US 250-12.32 (BRIDGE REPAIR) | TUS | 3 | Shelly & Sands Inc | $1,136,647 | $1,232,618 | +8.0% | +1.0% | ODOT |
| 220127 | BEL-SR 149-23.64 (INTERSECTION) | BEL | 3 | Wolf Creek Contracting Company LLC | $1,042,899 | $1,069,900 | +3.0% | +19% | ODOT |
| 220156 | BRO-SR 763-01.51 (CULVERT REPLACEMENT) | BRO | 4 | D G M Inc | $984,880 | $1,033,341 | +5.0% | -14% | ODOT |
| 220141 | GRE-SR 235-09.29 (FOUR LANE RESURFACING) | GRE | 2 | John R Jurgensen Company | $949,268 | $1,041,174 | +10% | +24% | ODOT |
| 220131 | CUY-SR 91-10.63 (TWO LANE RESURFACING) | CUY | 5 | Karvo Companies Inc | $848,087 | $868,570 | +2.0% | +8.0% | ODOT |
| 220135 | DAR-SR 49-32.03 (TWO LANE RESURFACING) | DAR | 2 | Shelly Company | $833,990 | $938,900 | +13% | +1.0% | ODOT |
| 220159 | D09-SIGN Replacement 2021 (SIGNING) | District 9 | 2 | M P Dory Co | $722,903 | $771,295 | +7.0% | +20% | ODOT |
| 220142 | HAM-Springdale Signal Upgrades (SIGNALIZATION) | HAM | 3 | Perram Electric Inc | $695,600 | $726,500 | +4.0% | -5.0% | ODOT |
| 220137 | FRA-SR 317-16.68 (BRIDGE REPAIR) | FRA | 2 | Shelly & Sands Inc | $618,851 | $784,575 | +27% | -2.0% | ODOT |
| 224011 | STA-SR 21-02.80 (CULVERT REPLACEMENT) | STA | 3 | Eclipse Co LLC | $616,948 | $630,094 | +2.0% | +20% | ODOT |
| 220145 | HAR-SR 31/SR 53/SR 67-10.16/Var (TWO LANE RESURFACING) | HAR | 3 | Helms and Sons Excavating | $591,449 | $649,585 | +10% | -12% | ODOT |
| 220136 | FRA-SR 315-04.15 (BRIDGE REPAIR) | FRA | 2 | Shelly & Sands Inc | $550,339 | $565,832 | +3.0% | +13% | ODOT |
| 220148 | MEG-SR 684-00.19 (CULVERT REPLACEMENT) | MEG | 5 | Parker Corporation | $299,407 | $367,774 | +23% | +1.0% | ODOT |
| 228002 | VAN-US 30-05.81 (BRIDGE REPAIR) | VAN | 1 | Miller Bros Const Inc | $225,971 | +51% | ODOT | ||
| 220158 | D09-RPM FY2022 (RAISED PAVEMENT MARKERS) | District 9 | 3 | Eaton Construction Co Inc | $211,428 | $249,867 | +18% | -16% | ODOT |
| 220160 | FAY-Deer Creek/PIC-Stages Pond (PART 1 AND PART 2) (PARKING AREAS) | FAY | 3 | Fillmore Construction | $89,888 | $89,897 | 0.0% | -2.0% | ODOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out.