Wolf Creek Contracting Company LLC: ODOT bid record

Wolf Creek Contracting Company LLC submitted 42 bids on Ohio DOT contracts in the data, from 28 JAN 2021 to 08 JUN 2023, and was the low bidder on 1 of them (2%). When it was not low, its total sat a median +22% above the low bid.

Owner
Ohio DOT
Low bid volume
$1,042,899
Latest bid
08 JUN 2023
Data through
12 NOV 2026
42Bids
1Low bids
2Win rate, percent
+22%Median gap to the low bid when not low, 41 bids

By year

YearBidsLow bidsWin rate
20211300%
20222215%
2023700%
Wolf Creek Contracting Company LLC, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
WAS700%
FAI300%
GUE300%
BEL3133%
MOE300%
NOB300%
ATH200%
MEG200%
LIC200%
MRG200%
MUS200%
SCI100%
Wolf Creek Contracting Company LLC, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH3838 (100%)$1.00$1.00
Subgrade compaction204E10000SY3111 (35%)$2.37$3.00
Excavation203E10000CY3410 (29%)$26.92$27.00
Water616E10000MGAL1510 (67%)$6.27$20.00
Pipe removed, 24" and under202E35100FT157 (47%)$12.61$20.00
12" conduit, type B611E04400FT87 (88%)$39.40$98.00
Aggregate base304E20000CY366 (17%)$105.86$90.00
Concrete masonry602E20000CY186 (33%)$1,706.58$2,300.00
Compacted aggregate617E10100CY116 (55%)$93.50$100.00
Commercial fertilizer659E20000TON365 (14%)$950.00$850.00
Water659E35000MGAL345 (15%)$1.15$1.00
Pavement removed202E23000SY205 (25%)$17.14$17.00
Wolf Creek Contracting Company LLC, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Wolf Creek Contracting Company LLC, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
08 JUN 2023230361MOEMOE-SR 78-06.78 (CULVERT REPLACEMENT)2 of 4$369,692+16%
11 MAY 2023230318MOEMOE-SR 78-08.63 (MISCELLANEOUS)4 of 4$581,535+16%
30 MAR 2023230204WASWAS-SR 530-05.04 (CULVERT REPLACEMENT)2 of 5$340,493+17%
09 MAR 2023230173NOBNOB-Appalachian Hills WLA (PARKING AREAS)2 of 7$1,125,442+6.0%
23 FEB 2023230128NOBNOB-SR 821-18.71 (CULVERT REPLACEMENT)6 of 8$289,692+48%
09 FEB 2023230089GUEGUE-SR 265-05.68 (SLIDE REPAIR)6 of 9$166,929+35%
26 JAN 2023230056MUSMUS-TR 49-00.56 (Multiuse Path) (BIKEWAYS)2 of 6$668,278+5.0%
29 SEP 2022220539MRGMRG-Burr Oak SP Lodge Road (PARKING AREAS)3 of 3$978,408+14%
25 AUG 2022220484District 10D10-CR FY2023 (CULVERT REPLACEMENT)4 of 7$194,162+83%
25 AUG 2022227001GALGAL-SR 553-00.61 (SLIDE REPAIR)5 of 5$341,881+74%
11 AUG 2022220466KNOKNO-SR 229-14.80 (MISCELLANEOUS)4 of 6$1,586,637+46%
11 AUG 2022220468MUSMUS-IR 70-25.90 (SLIDE REPAIR)7 of 10$788,282+23%
28 JUL 2022220445MOEMOE-TR 384A-00.30 (BRIDGE REPAIR)2 of 2$1,123,788-11%
28 JUL 2022220446NOBNOB-/WAS-IR 77/SR 339-12.91/06.66 (CULVERT REPLACEMENT)3 of 3$228,297+22%
12 MAY 2022220305WASWAS-Start Westward Phase 1 (LIGHTING)2 of 2$1,324,339+2.0%
12 MAY 2022220326MEGMEG-SR 681-04.78 (SLIDE REPAIR)5 of 10$725,905+22%
28 APR 2022220270FAIFAI-US 22-09.42 (INTERSECTION)4 of 5$3,934,362+16%
14 APR 2022220229ATHATH-Elm Street (MINOR RECONSTRUCTION)2 of 5$710,2440.0%
14 APR 2022220241LAWLAW-US 52-22.09 Geotech (SLIDE REPAIR)2 of 5$1,159,911+14%
14 APR 2022220251SENSEN-US 224-03.64 Roundabout Grp B (INTERSECTION)4 of 4$2,024,125+35%
14 APR 2022220253WASWAS-SR 7-28.97 (CULVERT REPLACEMENT)4 of 4$443,503+43%
31 MAR 2022220207FAIFAI-CR 9/TR 222-01.60/00.00 (SIDEWALK)4 of 6$407,965+20%
31 MAR 2022220208LICLIC-SR 13-09.54 (INTERSECTION)4 of 6$1,556,161+7.0%
31 MAR 2022220209LOGLOG-SR 47/SR 235-05.23/08.18 (INTERSECTION)2 of 3$2,922,862+11%
17 MAR 2022220166BELBEL-IR 70-15.72 (FOUR LANE RESURFACING)3 of 3$8,012,656+29%
Wolf Creek Contracting Company LLC: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy