ODOT letting results, April 28, 2022
28 contracts let by Ohio DOT on April 28, 2022, $53,738,912 in low bids, a median of 2.5 bidders per contract. On the 28 with an engineer's estimate, the low bid came in under it 14 times; median low bid 0.0% against the estimate.
- Owner
- Ohio DOT
- Contracts
- 28
- Low bids, total
- $53,738,912
- Data through
- 12 NOV 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 220277 | MAR-SR 4/SR 4D-11.63/00.74 (BRIDGE REPAIR) | MAR | 2 | Complete General Construction Company | $7,941,500 | $8,555,668 | +8.0% | +26% | ODOT |
| 220259 | ATB-SR 84/VAR-21.80/VAR (TWO LANE RESURFACING) | ATB | 3 | Koski Construction Co | $4,960,336 | $5,588,800 | +13% | -1.0% | ODOT |
| 220266 | CUY-US 422-13.87 (FOUR LANE RESURFACING) | CUY | 3 | Karvo Companies Inc | $4,439,172 | $4,778,129 | +8.0% | +7.0% | ODOT |
| 220275 | HIG-US 50-14.98 (MINOR RECONSTRUCTION) | HIG | 3 | Shelly Company | $4,318,914 | $4,378,399 | +1.0% | +11% | ODOT |
| 220282 | WAR-Clear Crk Bikepath Connector (BIKEWAYS) | WAR | 4 | Brumbaugh Construction Inc | $3,418,712 | $3,579,771 | +5.0% | -5.0% | ODOT |
| 220270 | FAI-US 22-09.42 (INTERSECTION) | FAI | 5 | Shelly & Sands Inc | $3,403,858 | $3,649,758 | +7.0% | +5.0% | ODOT |
| 220267 | D04-PM R-WR FY2022 (PAVEMENT MARKING) | District 4 | 3 | A & A Safety Inc | $2,920,001 | $3,033,400 | +4.0% | +1.0% | ODOT |
| 220283 | D04-PM FY2022 (West) (PAVEMENT MARKING) | District 4 | 2 | Oglesby Construction Inc | $2,884,488 | $3,010,000 | +4.0% | +6.0% | ODOT |
| 220264 | CLE-SIGNS FY2022 (SIGNING) | CLE | 3 | Lake Erie Construction Company | $2,625,245 | $3,471,053 | +32% | -2.0% | ODOT |
| 220285 | FRA-IR 270/VAR-SP FY22P (SPOT PATCHING / PAVEMENT REPAIR) | FRA | 1 | Kokosing Construction Company Inc | $2,062,252 | +35% | ODOT | ||
| 220276 | LAK-SR 2-11.41 Deck (BRIDGE REPAIR) | LAK | 3 | Beaver Excavating Company | $1,649,375 | $1,684,000 | +2.0% | -3.0% | ODOT |
| 220271 | FRA-US 270-12.50 (at Cemetery Rd) (INTERSECTION) | FRA | 2 | Shelly & Sands Inc | $1,459,555 | $1,460,357 | 0.0% | +47% | ODOT |
| 220286 | HAS-SR 151-24.96 (SLIDE REPAIR) | HAS | 6 | Ohio-West Virginia Excavating Co | $1,243,304 | $1,288,276 | +4.0% | -31% | ODOT |
| 220280 | POR-/SUM-MCRO FY2022 (MICROSURFACING) | POR | 2 | American Pavements Inc | $1,227,615 | $1,447,390 | +18% | -2.0% | ODOT |
| 223004 | D08-CLE/HAM ITS Interconnect (SIGNALIZATION) | District 8 | 3 | Bansal Construction Inc | $1,149,457 | $1,152,500 | 0.0% | -7.0% | ODOT |
| 220284 | D07-PPM FY22 (PAVEMENT MARKING) | District 7 | 2 | The Aero-Mark Company LLC | $1,037,000 | $1,226,845 | +18% | +17% | ODOT |
| 220239 | JAC-SR 93-14.29 Signal Upgrade (SIGNALIZATION) | JAC | 2 | Complete General Construction Company | $997,805 | $1,189,000 | +19% | -7.0% | ODOT |
| 220272 | FRA-SR 665-14.00 (BRIDGE REPAIR) | FRA | 2 | Complete General Construction Company | $997,638 | $1,269,411 | +27% | -5.0% | ODOT |
| 220279 | MER-SR 274/SR 716-03.79/05.44 (TWO LANE RESURFACING) | MER | 1 | Shelly Company | $919,499 | +20% | ODOT | ||
| 220278 | MAR-SR 47/VAR-08.34/VAR (TWO LANE RESURFACING) | MAR | 2 | Kokosing Construction Company Inc | $870,273 | $1,213,662 | +39% | -16% | ODOT |
| 220273 | GAL-SR 7-29.99 (SLIDE REPAIR) | GAL | 4 | Ohio-West Virginia Excavating Co | $644,480 | $711,119 | +10% | -22% | ODOT |
| 220262 | BEL-CR 56-33.21/34.26 (SLIDE REPAIR) | BEL | 7 | Ohio-West Virginia Excavating Co | $429,462 | $471,400 | +10% | -16% | ODOT |
| 220274 | GUE-IR 70-08.80 (MINOR WIDENING) | GUE | 2 | Shelly & Sands Inc | $422,051 | $443,549 | +5.0% | +15% | ODOT |
| 228003 | HOL-SR 520-09.83 (CULVERT REPLACEMENT) | HOL | 5 | Adena Corporation | $406,061 | $423,728 | +4.0% | -8.0% | ODOT |
| 220288 | WAY-SR 21-01.86 (CULVERT REPLACEMENT) | WAY | 1 | Black Horse Bridge Construction Inc | $394,047 | +30% | ODOT | ||
| 220265 | CUY-Mayfield Hts TLCI (SIDEWALK) | CUY | 2 | Cook Paving & Construction Co Inc | $383,424 | $519,276 | +35% | +10% | ODOT |
| 220281 | PRE-Geeding St Bridge Replacemnt (CULVERT REPLACEMENT) | PRE | 3 | Brumbaugh Construction Inc | $349,543 | $390,269 | +12% | +30% | ODOT |
| 220269 | D08-Culvert Repair FY2022 (CULVERT REPLACEMENT) | District 8 | 2 | Municipal and Contractors Sealing Products, Inc | $183,845 | $476,723 | +159% | -83% | ODOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out.