Adena Corporation: ODOT bid record
Adena Corporation submitted 43 bids on Ohio DOT contracts in the data, from 13 FEB 2020 to 12 NOV 2026, and was the low bidder on 15 of them (35%). When it was not low, its total sat a median +16% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $6,823,568
- Latest bid
- 12 NOV 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 9 | 4 | 44% |
| 2021 | 5 | 2 | 40% |
| 2022 | 6 | 3 | 50% |
| 2023 | 8 | 2 | 25% |
| 2024 | 5 | 2 | 40% |
| 2025 | 8 | 1 | 13% |
| 2026 | 2 | 1 | 50% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| HOL | 8 | 4 | 50% |
| RIC | 6 | 2 | 33% |
| MED | 5 | 2 | 40% |
| ASD | 5 | 2 | 40% |
| HUR | 4 | 2 | 50% |
| SAN | 3 | 1 | 33% |
| WAY | 3 | 0 | 0% |
| SEN | 2 | 2 | 100% |
| WYA | 2 | 0 | 0% |
| LOR | 1 | 0 | 0% |
| MAR | 1 | 0 | 0% |
| ERI | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 43 | 43 (100%) | $1.00 | $1.00 |
| Water | 659E35000 | MGAL | 41 | 36 (88%) | $1.00 | $1.00 |
| Repair seeding and mulching | 659E14000 | SY | 33 | 21 (64%) | $1.00 | $1.25 |
| Embankment | 203E20000 | CY | 39 | 16 (41%) | $21.63 | $25.00 |
| Topsoil | 659E00300 | CY | 36 | 14 (39%) | $31.93 | $45.00 |
| Aggregate drains | 605E31100 | FT | 23 | 14 (61%) | $9.26 | $20.00 |
| Excavation | 203E10000 | CY | 40 | 12 (30%) | $19.69 | $27.00 |
| Seeding and mulching | 659E10000 | SY | 38 | 12 (32%) | $2.66 | $2.60 |
| Class QC1 concrete, footing | 511E46510 | CY | 20 | 11 (55%) | $504.04 | $690.00 |
| Class QC1 concrete, headwall | 511E46610 | CY | 18 | 11 (61%) | $812.65 | $1,897.38 |
| Type 2 waterproofing | 512E33000 | SY | 24 | 10 (42%) | $17.66 | $30.00 |
| Soil analysis test | 659E00100 | EACH | 30 | 9 (30%) | $112.50 | $115.50 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Eclipse Co LLC | 33 | 5 of 33 |
| Stanley Miller Construction Company | 18 | 2 of 18 |
| Great Lakes Demolition Company | 14 | 8 of 14 |
| BCC Ohio Inc | 14 | 9 of 14 |
| Lockhart Concrete Co | 12 | 0 of 12 |
| Digioia-Suburban Excavating LLC | 8 | 1 of 8 |
| Crawford Construction Company Inc | 7 | 5 of 7 |
| Shelly & Sands Inc | 6 | 2 of 6 |
| Rietschlin Construction Inc | 6 | 1 of 6 |
| Buds Inc | 6 | 1 of 6 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 NOV 2026 | 260508 | RIC | RIC-SR 13-28.73 (CULVERT REPLACEMENT) | 4 of 8 | $420,437 | +18% |
| 09 APR 2026 | 260188 | ASD | ASD-SR 60-14.97 (CULVERT REPLACEMENT) | 1 of 5 | $389,830 | Low, 5.0% under the second |
| 23 OCT 2025 | 250513 | HUR | HUR-SR 303-02.42 (CULVERT REPLACEMENT) | 4 of 8 | $254,280 | +19% |
| 22 MAY 2025 | 250299 | WAY | WAY-SR 3/SR 301-07.15/01.60 (CULVERT REPLACEMENT) | 2 of 2 | $586,064 | +12% |
| 08 MAY 2025 | 250260 | RIC | RIC-US 42/SR 545-00.41/02.36 (CULVERT REPLACEMENT) | 3 of 3 | $439,207 | +19% |
| 27 MAR 2025 | 258002 | ASD | ASD-US 30-09.32L Bridge Hit (BRIDGE REPAIR) | 3 of 5 | $186,047 | +86% |
| 27 FEB 2025 | 250132 | RIC | RIC-/HUR-SR 39/SR 61-11.15/11.97 (CULVERT REPLACEMENT) | 1 of 3 | $339,000 | Low, 22% under the second |
| 27 FEB 2025 | 250149 | WAY | WAY-SR 95-00.17 (CULVERT REPLACEMENT) | 3 of 6 | $269,744 | +10% |
| 16 JAN 2025 | 250037 | HOL | HOL-SR 515-00.15 (CULVERT REPLACEMENT) | 3 of 5 | $810,492 | +36% |
| 16 JAN 2025 | 250038 | RIC | RIC-SR 314-02.75 (CULVERT REPLACEMENT) | 4 of 8 | $385,691 | +17% |
| 11 JUL 2024 | 240366 | WAY | WAY-SR 57-06.73 (CULVERT REPLACEMENT) | 2 of 6 | $297,347 | +7.0% |
| 18 APR 2024 | 240257 | MED | MED-SR 57/SR 94-09.78/18.84 (CULVERT REPLACEMENT) | 1 of 7 | $554,295 | Low, 2.0% under the second |
| 25 JAN 2024 | 240053 | HUR | HUR-SR 103-02.04 (CULVERT REPLACEMENT) | 3 of 4 | $241,089 | +21% |
| 25 JAN 2024 | 240077 | KNO | KNO-SR 3-32.25 (BRIDGE REPAIR) | 5 of 6 | $214,828 | +10% |
| 11 JAN 2024 | 240040 | RIC | RIC-SR 61/SR 598-12.74/00.71 (CULVERT REPLACEMENT) | 1 of 5 | $321,805 | Low, 7.0% under the second |
| 25 MAY 2023 | 230344 | MED | MED-SR 301-05.48 (CULVERT REPLACEMENT) | 1 of 4 | $318,463 | Low, 3.0% under the second |
| 11 MAY 2023 | 230304 | WYA | WYA-SR 67-24.06 (CULVERT REPLACEMENT) | 3 of 3 | $385,108 | +31% |
| 13 APR 2023 | 230219 | HOL | HOL-US 62-20.66 (CULVERT REPLACEMENT) | 2 of 4 | $127,405 | +18% |
| 13 APR 2023 | 230229 | RIC | RIC-BH FY2023 (CULVERT REPLACEMENT) | 3 of 3 | $531,230 | +22% |
| 26 JAN 2023 | 230064 | WYA | WYA-Toledo Street Bridge (CULVERT REPLACEMENT) | 2 of 2 | $396,815 | +9.0% |
| 26 JAN 2023 | 230072 | SEN | SEN-US 23-04.88 Str Replacmnt (CULVERT REPLACEMENT) | 1 of 5 | $401,455 | Low, 14% under the second |
| 12 JAN 2023 | 230012 | ERI | ERI-SR 4-00.23 (SLIDE REPAIR) | 5 of 5 | $697,141 | +41% |
| 12 JAN 2023 | 230023 | MRW | MRW-SR 229-00.72 (CULVERT REPLACEMENT) | 2 of 6 | $398,658 | +5.0% |
| 15 DEC 2022 | 220663 | HOL | HOL-SR 39/SR 754-11.17/00.16,TUS-SR 93-10.80 (CULVERT REPLACEMENT) | 1 of 8 | $1,583,393 | Low, 5.0% under the second |
| 17 NOV 2022 | 220618 | SAN | SAN-SR 510-01.17 Brdg Repl (CULVERT REPLACEMENT) | 3 of 4 | $348,302 | +3.0% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.