Adena Corporation: ODOT bid record

Adena Corporation submitted 43 bids on Ohio DOT contracts in the data, from 13 FEB 2020 to 12 NOV 2026, and was the low bidder on 15 of them (35%). When it was not low, its total sat a median +16% above the low bid.

Owner
Ohio DOT
Low bid volume
$6,823,568
Latest bid
12 NOV 2026
Data through
12 NOV 2026
43Bids
15Low bids
35Win rate, percent
+16%Median gap to the low bid when not low, 28 bids

By year

YearBidsLow bidsWin rate
20209444%
20215240%
20226350%
20238225%
20245240%
20258113%
20262150%
Adena Corporation, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
HOL8450%
RIC6233%
MED5240%
ASD5240%
HUR4250%
SAN3133%
WAY300%
SEN22100%
WYA200%
LOR100%
MAR100%
ERI100%
Adena Corporation, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH4343 (100%)$1.00$1.00
Water659E35000MGAL4136 (88%)$1.00$1.00
Repair seeding and mulching659E14000SY3321 (64%)$1.00$1.25
Embankment203E20000CY3916 (41%)$21.63$25.00
Topsoil659E00300CY3614 (39%)$31.93$45.00
Aggregate drains605E31100FT2314 (61%)$9.26$20.00
Excavation203E10000CY4012 (30%)$19.69$27.00
Seeding and mulching659E10000SY3812 (32%)$2.66$2.60
Class QC1 concrete, footing511E46510CY2011 (55%)$504.04$690.00
Class QC1 concrete, headwall511E46610CY1811 (61%)$812.65$1,897.38
Type 2 waterproofing512E33000SY2410 (42%)$17.66$30.00
Soil analysis test659E00100EACH309 (30%)$112.50$115.50
Adena Corporation, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Adena Corporation, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
12 NOV 2026260508RICRIC-SR 13-28.73 (CULVERT REPLACEMENT)4 of 8$420,437+18%
09 APR 2026260188ASDASD-SR 60-14.97 (CULVERT REPLACEMENT)1 of 5$389,830Low, 5.0% under the second
23 OCT 2025250513HURHUR-SR 303-02.42 (CULVERT REPLACEMENT)4 of 8$254,280+19%
22 MAY 2025250299WAYWAY-SR 3/SR 301-07.15/01.60 (CULVERT REPLACEMENT)2 of 2$586,064+12%
08 MAY 2025250260RICRIC-US 42/SR 545-00.41/02.36 (CULVERT REPLACEMENT)3 of 3$439,207+19%
27 MAR 2025258002ASDASD-US 30-09.32L Bridge Hit (BRIDGE REPAIR)3 of 5$186,047+86%
27 FEB 2025250132RICRIC-/HUR-SR 39/SR 61-11.15/11.97 (CULVERT REPLACEMENT)1 of 3$339,000Low, 22% under the second
27 FEB 2025250149WAYWAY-SR 95-00.17 (CULVERT REPLACEMENT)3 of 6$269,744+10%
16 JAN 2025250037HOLHOL-SR 515-00.15 (CULVERT REPLACEMENT)3 of 5$810,492+36%
16 JAN 2025250038RICRIC-SR 314-02.75 (CULVERT REPLACEMENT)4 of 8$385,691+17%
11 JUL 2024240366WAYWAY-SR 57-06.73 (CULVERT REPLACEMENT)2 of 6$297,347+7.0%
18 APR 2024240257MEDMED-SR 57/SR 94-09.78/18.84 (CULVERT REPLACEMENT)1 of 7$554,295Low, 2.0% under the second
25 JAN 2024240053HURHUR-SR 103-02.04 (CULVERT REPLACEMENT)3 of 4$241,089+21%
25 JAN 2024240077KNOKNO-SR 3-32.25 (BRIDGE REPAIR)5 of 6$214,828+10%
11 JAN 2024240040RICRIC-SR 61/SR 598-12.74/00.71 (CULVERT REPLACEMENT)1 of 5$321,805Low, 7.0% under the second
25 MAY 2023230344MEDMED-SR 301-05.48 (CULVERT REPLACEMENT)1 of 4$318,463Low, 3.0% under the second
11 MAY 2023230304WYAWYA-SR 67-24.06 (CULVERT REPLACEMENT)3 of 3$385,108+31%
13 APR 2023230219HOLHOL-US 62-20.66 (CULVERT REPLACEMENT)2 of 4$127,405+18%
13 APR 2023230229RICRIC-BH FY2023 (CULVERT REPLACEMENT)3 of 3$531,230+22%
26 JAN 2023230064WYAWYA-Toledo Street Bridge (CULVERT REPLACEMENT)2 of 2$396,815+9.0%
26 JAN 2023230072SENSEN-US 23-04.88 Str Replacmnt (CULVERT REPLACEMENT)1 of 5$401,455Low, 14% under the second
12 JAN 2023230012ERIERI-SR 4-00.23 (SLIDE REPAIR)5 of 5$697,141+41%
12 JAN 2023230023MRWMRW-SR 229-00.72 (CULVERT REPLACEMENT)2 of 6$398,658+5.0%
15 DEC 2022220663HOLHOL-SR 39/SR 754-11.17/00.16,TUS-SR 93-10.80 (CULVERT REPLACEMENT)1 of 8$1,583,393Low, 5.0% under the second
17 NOV 2022220618SANSAN-SR 510-01.17 Brdg Repl (CULVERT REPLACEMENT)3 of 4$348,302+3.0%
Adena Corporation: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy