ODOT contract 250149 bid tabulation

WAY-SR 95-00.17 (CULVERT REPLACEMENT). Let by Ohio DOT on February 27, 2025, WAY. 6 bids received; low bid $244,682 by Ed Wilson Services LLC, -6.3% against the engineer's estimate of $261,000.

Owner
Ohio DOT
Letting
27 FEB 2025
Pay items
53
Data through
12 NOV 2026

5 of the 6 bids matched their published totals to within a dollar and are shown; the others are left out.

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Ed Wilson Services LLC$244,682Low-6.0%
3Adena Corporation$269,744+10%+3.0%
4BCC Ohio Inc$270,799+11%+4.0%
5Stanley Miller Construction Company$447,403+83%+71%
6Eclipse Co LLC$468,412+91%+79%
ODOT contract 250149: bids by rank

Engineer's estimate: $261,000.

Bid tabulation

LinePay itemUnitQuantity1. Ed Wilson Services LLC2. Adena Corporation3. BCC Ohio Inc4. Stanley Miller Construction Company5. Eclipse Co LLC
1Clearing and grubbing (201E11000)LS1$3,000.00$9,563.77$1,872.00$7,000.00$10,000
2Headwall removed (202E20010)EACH2$1,000.00$2,020.22$3,813.75$1,500.00$8,361.00
3Pavement removed (202E23000)SY80$50.00$33.34$14.79$30.00$42.00
4Pipe removed, 24" and under (202E35100)FT13$50.00$7.47$21.06$60.00$37.00
5Pipe removed, over 24" diameter (202E35200)FT4$100.00$3,378.56$1,614.38$500.00$4,943.00
6Excavation (203E10000)CY242$25.00$20.05$21.37$70.00$62.00
7Embankment (203E20000)CY161$25.00$19.31$17.55$55.00$44.00
8Subgrade compaction (204E10000)SY89$3.00$8.73$2.34$5.00$5.00
9Guardrail, type MGS (606E15050)FT225$35.00$26.78$22.58$28.50$20.00
10Guardrail, type MGS, long-span (606E17360)FT75$50.00$41.11$34.65$26.50$22.00
11Anchor assembly, type E (606E26100)EACH4$3,500.00$3,301.93$2,782.50$4,500.00$2,540.00
12Monument assembly, type C (623E38500)EACH2$2,000.00$1,992.37$2,133.00$4,500.00$2,851.00
13Preconstruction survey monument verification and report (623E50000)LS1$2,500.00$934.50$2,625.00$2,500.00$3,298.00
14Post construction survey monument verification and report (623E51000)LS1$2,500.00$934.50$2,625.00$2,500.00$3,298.00
15Rock channel protection, type B with filter (601E32100)CY38$175.00$158.17$227.29$250.00$198.00
16Soil analysis test (659E00100)EACH2$150.00$100.00$137.25$150.00$175.00
17Topsoil (659E00300)CY114$50.00$52.20$72.54$50.00$112.00
18Seeding and mulching (659E10000)SY1,030$2.50$3.05$3.41$8.00$4.00
19Repair seeding and mulching (659E14000)SY52$1.00$1.00$3.15$2.00$1.10
20Inter-seeding (659E15000)SY52$1.00$1.00$3.15$1.00$0.10
21Commercial fertilizer (659E20000)TON0.14$800.00$1,112.50$2,250.00$800.00$700.00
22Lime (659E31000)ACRE0.21$150.00$296.67$490.00$150.00$40.00
23Water (659E35000)MGAL5.70$1.00$1.00$10.50$1.00$1.00
24Erosion control (832E30000)EACH5,000$1.00$1.00$1.00$1.00$1.00
257' X 4' conduit, type A, 706.05 (611E94726)FT15$1,800.00$2,370.18$2,077.50$2,750.00$3,873.00
267' X 4' conduit, type A, 706.05, as per plan (611E94727)FT13$1,800.00$1,750.48$2,663.74$2,200.00$3,697.00
27Asphalt concrete base, PG64-22, (449) (301E56000)CY19$500.00$560.70$472.50$647.00$800.00
28Aggregate base (304E20000)CY62$90.00$122.39$150.60$175.00$113.00
29Tack coat (407E10000)GAL13$4.00$24.92$21.00$24.00$2.00
30Prime coat, as per plan (408E10001)GAL84$7.00$22.42$18.90$50.00$12.00
31Asphalt concrete surface course, 9.5 MM, type A (4 (442E22001)CY7$900.00$1,246.01$1,050.00$705.00$2,210.00
32Barrier reflector, type 2 (bidirectional) (626E00110)EACH8$15.00$13.70$13.20$50.00$13.00
33Ground mounted support, no. 3 post, as per plan (630E03101)FT24$17.00$108.41$91.36$70.00$87.00
34Removal of ground mounted sign and reerection (630E85100)EACH2$220.00$303.95$256.14$105.00$244.00
35Removal of ground mounted post support and disposal (630E86002)EACH2$110.00$26.73$22.53$60.00$21.00
36Edge line, 6", type 1 (642E00104)MI0.01$68,000$98,005$82,588$100,000$78,655
37Center line, type 1 (642E00300)MI0.01$90,000$130,296$110,114$130,000$104,870
38Detour signing (614E12420)LS1$4,000.00$7,264.55$6,121.75$12,000$5,830.00
39Cofferdams and excavation bracing (503E11100)LS1$5,000.00$10,700$11,754$30,000$27,284
40Unclassified excavation (503E21300)LS1$10,000$16,770$6,796.35$42,000$10,238
41Epoxy coated steel reinforcement (509E10000)LB2,972$2.00$2.30$1.92$3.00$5.00
42Class QC1 concrete, retaining/wingwall not including footing (511E46010)CY6$1,500.00$1,892.69$2,038.31$1,250.00$3,945.00
43Class QC1 concrete, footing (511E46510)CY20$500.00$653.65$1,148.51$850.00$1,152.00
44Class QC1 concrete, headwall (511E46610)CY1$1,500.00$1,275.91$2,079.08$2,000.00$4,077.00
45Sealing of concrete surfaces (epoxy-urethane) (512E10100)SY24$30.00$94.64$44.55$160.00$106.00
46Type 2 waterproofing (512E33000)SY19$35.00$33.57$42.91$295.00$34.00
47Type 3 waterproofing (512E33010)SY33$35.00$41.98$84.15$365.00$58.00
481" preformed expansion joint filler (516E13600)SF26$15.00$3.83$13.15$57.00$9.00
49Porous backfill with geotextile fabric (518E21230)LS1$125.00$1,634.76$2,508.00$8,000.00$2,139.00
50Premium for contract performance bond and for payment bond (103E05000)LS1$5,000.00$3,115.03$3,343.08$10,000$9,500.00
51Maintaining traffic (614E11000)LS1$8,000.00$2,801.64$1,801.80$12,000$22,438
52Construction layout stakes and surveying (623E10000)LS1$7,500.00$4,884.37$3,795.00$12,000$7,097.00
53Mobilization (624E10000)LS1$25,000$5,081.92$8,148.00$45,000$32,065
ODOT contract 250149: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of February 27, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy