ODOT letting results, November 17, 2022

24 contracts let by Ohio DOT on November 17, 2022, $50,185,001 in low bids, a median of 3 bidders per contract. On the 24 with an engineer's estimate, the low bid came in under it 13 times; median low bid -1.0% against the estimate.

Owner
Ohio DOT
Contracts
24
Low bids, total
$50,185,001
Data through
12 NOV 2026

Contracts let that day

ContractProjectCountyBidsLow bidderLow bidSecond bidGapAgainst estimateSource
220600CUY-IR 480-07.14 WB Safety (INTERCHANGE)CUY2Kokosing Construction Company Inc$12,009,866$12,674,978+6.0%+21%ODOT
220584LUC-SR 120-11.32 (BRIDGE REPLACEMENT (1 BRIDGE))LUC3Vernon Nagel Inc$6,619,021$6,851,405+4.0%+45%ODOT
220616PIC-/FAI/FRA-SR 674-00.00/00.00/00.00 (TWO LANE RESURFACING)PIC2Shelly Company$4,341,130$4,643,004+7.0%-6.0%ODOT
220606HAM-IR 71-14.40/18.58 (BRIDGE REPAIR)HAM3Eagle Bridge Co$3,511,048$3,808,289+8.0%+29%ODOT
220605FAI-SR 37-19.14 (TWO LANE RESURFACING)FAI1Shelly Company$3,388,105+2.0%ODOT
220611LIC-US 62-00.00 (TWO LANE RESURFACING)LIC2Shelly Company$3,069,386$3,255,484+6.0%+7.0%ODOT
220597BUT-SR 126-07.66 (TWO LANE RESURFACING)BUT2John R Jurgensen Company$2,493,187$2,751,835+10%+5.0%ODOT
220609JAC-SR 140/SR 279-00.00/11.86 PV (TWO LANE RESURFACING)JAC2Shelly & Sands Inc$2,192,596$2,267,904+3.0%-8.0%ODOT
220612LOR-US 20-19.83 (TWO LANE RESURFACING)LOR3Karvo Companies Inc$1,704,544$1,893,496+11%+5.0%ODOT
220602D07-CHIP FY23 (A) (CHIP SEAL)District 74 of 5Ward Construction Co$1,574,751-1.0%ODOT
220613MAR-SR 95-22.64 (BRIDGE REPAIR)MAR5Shelly & Sands Inc$1,494,525$1,726,029+15%+15%ODOT
220601D03-BH FY2023 (B) (BRIDGE REPAIR)District 31BCC Ohio Inc$1,291,669+2.0%ODOT
220620STA-SR 297/SR 627-00.66/00.37 (FOUR LANE RESURFACING)STA5Superior Paving & Materials Inc$1,090,745$1,269,080+16%-14%ODOT
220610LAW-SR 141-16.37 PV (MICROSURFACING)LAW2Strawser Construction Inc$980,945$1,036,305+6.0%+31%ODOT
220614MOE-CR 28-00.54 (BRIDGE REPLACEMENT (1 BRIDGE))MOE7Shelly & Sands Inc$751,861$753,9290.0%-8.0%ODOT
220608HIG-TR 239-00.88 (BRIDGE REPLACEMENT (1 BRIDGE))HIG9Coopers Excavating LLC$734,821$738,531+1.0%-13%ODOT
220624D11-PM-FY2023(A) (PAVEMENT MARKING)District 113Dura Mark Inc$541,000$711,324+31%-27%ODOT
220607HEN-US 6-11.80 Bridge Paint (BRIDGE PAINTING)HEN6Legend Painting Inc$429,521$439,163+2.0%-2.0%ODOT
220619SAN-SR 600-03.02 (CULVERT REPLACEMENT)SAN5Adena Corporation$387,265$392,057+1.0%-12%ODOT
220599COL-SR 14-05.71 (CULVERT REPLACEMENT)COL7Marucci & Gaffney Excavating Co$377,107$441,395+17%-33%ODOT
220603D08-Culvert Repair FY2023 (MISCELLANEOUS)District 81Eagle Bridge Co$374,218-25%ODOT
220618SAN-SR 510-01.17 Brdg Repl (CULVERT REPLACEMENT)SAN4Great Lakes Demolition Company$337,986$341,154+1.0%-12%ODOT
220615MOE-CR VAR-GR FY2023 (GUARDRAIL REBUILDING)MOE3Lake Erie Construction Company$272,875$276,655+1.0%-21%ODOT
220623D09-HS FY2023 (HERBICIDAL SPRAYING)District 91Allen Chase Enterprises, Inc$216,830+54%ODOT
ODOT contracts let on November 17, 2022, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy