ODOT letting results, May 25, 2023
22 contracts let by Ohio DOT on May 25, 2023, $116,310,867 in low bids, a median of 3 bidders per contract. On the 22 with an engineer's estimate, the low bid came in under it 8 times; median low bid +3.0% against the estimate.
- Owner
- Ohio DOT
- Contracts
- 22
- Low bids, total
- $116,310,867
- Data through
- 12 NOV 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 230321 | FRA-SR 161-15.80 (MAJOR WIDENING) | FRA | 1 | Kokosing Construction Company Inc | $65,596,371 | +5.0% | ODOT | ||
| 230331 | OTT-SR 2-23.29 Resurf/Bridge (FOUR LANE RESURFACING) | OTT | 3 | Gerken Paving Inc | $11,463,198 | $11,977,459 | +4.0% | +10% | ODOT |
| 230332 | OTT-SR 53-11.67 Grp B- upgrade (INTERSECTION) | OTT | 1 | Miller Bros Const Inc | $11,019,774 | 0.0% | ODOT | ||
| 230334 | SUM-IR 271/SR 8-08.49/VAR (FOUR LANE RESURFACING) | SUM | 2 | Kenmore Construction Co Inc | $9,878,459 | $10,605,984 | +7.0% | +28% | ODOT |
| 230327 | CUY-IR 71/IR 90 Wrong Way Signs (SIGNING) | CUY | 3 | Perram Electric Inc | $3,213,000 | $3,475,596 | +8.0% | +2.0% | ODOT |
| 230328 | D03-RM FY2023 (SPOT PATCHING / PAVEMENT REPAIR) | District 3 | 3 | Kokosing Construction Company Inc | $2,063,748 | $2,398,000 | +16% | +7.0% | ODOT |
| 230323 | ADA-SR 348-11.20 (SLIDE REPAIR) | ADA | 3 of 4 | Alan Stone Co Inc | $1,895,610 | $1,978,198 | +4.0% | +6.0% | ODOT |
| 230338 | D04-SP FY2023 (West) (SPOT PATCHING / PAVEMENT REPAIR) | District 4 | 2 | Karvo Companies Inc | $1,858,000 | $2,286,300 | +23% | +61% | ODOT |
| 230333 | SEN-/HAN-US 23/SR 12-11.88/27.92 (FOUR LANE RESURFACING) | SEN | 2 | Gerken Paving Inc | $1,450,244 | $2,358,570 | +63% | +4.0% | ODOT |
| 230326 | CRA-CHIP FY2024 (CHIP SEAL) | CRA | 1 | Henry W Bergman Inc | $1,131,401 | -9.0% | ODOT | ||
| 230329 | D04-Culverts FY2023 (East) (CULVERT REPLACEMENT) | District 4 | 5 | Marucci & Gaffney Excavating Co | $1,089,950 | $1,100,855 | +1.0% | +1.0% | ODOT |
| 230336 | CUY-IR 480-00.09 Replace (CULVERT REPLACEMENT) | CUY | 4 | Triad Engineering & Contracting Co | $994,677 | $1,090,000 | +10% | -1.0% | ODOT |
| 230343 | LIC-SR 161/TR 88-00.33/02.74 (INTERCHANGE) | LIC | 3 | Shelly & Sands Inc | $896,988 | $1,070,707 | +19% | +5.0% | ODOT |
| 230345 | POR-/STA Culverts FY2023 (CULVERT REPLACEMENT) | POR | 6 | Eclipse Co LLC | $767,935 | $906,449 | +18% | -6.0% | ODOT |
| 230324 | ADA-SR 247-13.22/21.18 Culvert (CULVERT REPLACEMENT) | ADA | 3 of 4 | D G M Inc | $645,222 | $714,574 | +11% | +10% | ODOT |
| 230339 | D06-FY23 Bridge Repair (BRIDGE PAINTING) | District 6 | 1 | Evers Steel Construction LLC | $469,317 | +47% | ODOT | ||
| 230342 | FRA-IR 71/US 23 Crackseal PPM FY23 (CRACK SEALING) | FRA | 2 | Scodeller Construction Inc | $408,545 | $494,792 | +21% | +4.0% | ODOT |
| 234017 | GAL-SR 218-09.28 (CULVERT REPLACEMENT) | GAL | 4 | Parker Corporation | $375,661 | $407,952 | +9.0% | -2.0% | ODOT |
| 230344 | MED-SR 301-05.48 (CULVERT REPLACEMENT) | MED | 4 | Adena Corporation | $318,463 | $328,356 | +3.0% | -15% | ODOT |
| 230340 | D07-RPM FY23 (RAISED PAVEMENT MARKERS) | District 7 | 2 | W L Markers Inc | $300,085 | $344,800 | +15% | -7.0% | ODOT |
| 230337 | D03-RPM FY2023 (RAISED PAVEMENT MARKERS) | District 3 | 2 | W L Markers Inc | $264,301 | $312,220 | +18% | -6.0% | ODOT |
| 230335 | BEL-SR 7-16.29 (BRIDGE REPAIR) | BEL | 6 | Marucci & Gaffney Excavating Co | $209,917 | $256,343 | +22% | -19% | ODOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out.