Evers Steel Construction LLC submitted 29 bids on Ohio DOT contracts in the data, from 26 MAR 2020 to 27 AUG 2026, and was the low bidder on 14 of them (48%). When it was not low, its total sat a median +37% above the low bid.

Owner
Ohio DOT
Low bid volume
$6,371,216
Latest bid
27 AUG 2026
Data through
12 NOV 2026
29Bids
14Low bids
48Win rate, percent
+37%Median gap to the low bid when not low, 14 bids

By year

YearBidsLow bidsWin rate
2020300%
20213267%
2022100%
20234375%
20246350%
20258675%
2026400%
Evers Steel Construction LLC, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
CLA3267%
LUC300%
HAM3133%
SCI22100%
RIC2150%
HEN100%
BUT100%
ERI100%
JEF11100%
District 611100%
LOR100%
GUE100%
Evers Steel Construction LLC, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Repairing damaged members by grinding849E10600HR2315 (65%)$215.00$250.00
Erosion control832E30000EACH1212 (100%)$1.00$1.00
Law enforcement officer with patrol car for assistance614E11110HR1611 (69%)$75.00$80.00
Field painting of damaged structural steel, as per plan514E20001SF2310 (43%)$155.00$150.00
Structural steel members, level UF, as per plan513E10201LB149 (64%)$21.00$15.75
Structural steel, misc.: repair of damaged main ME513E95000FT87 (88%)$1,200.00$1,594.59
Portions of structure removed, as per plan (second202E11501EACH86 (75%)$475.00$800.00
Structural steel, misc.: repair of damaged members513E95030EACH55 (100%)$115.00$392.50
Structural steel, misc.:repair of damaged secondar513E90000LB54 (80%)$25.00$25.00
Structural steel, misc.: repair of damaged seconda513E95000FT54 (80%)$150.00$338.00
Concrete repair by epoxy injection512E10600FT72 (29%)$600.00$125.00
Concrete repair by epoxy injection, as per plan512E10601FT61 (17%)$240.00$100.00
Evers Steel Construction LLC, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Ruhlin Company149 of 14
Armstrong Steel Erectors Inc62 of 6
Suburban Maintenance & Construction Inc63 of 6
Vimas Painting Company Inc62 of 6
Advanced Painting & Contracting LLC31 of 3
Advantage Steel & Construction LLC20 of 2
Mosser Construction Inc10 of 1
Forest City Erectors Inc10 of 1
J & J Bridge Company Inc11 of 1
Axis Civil Construction LLC11 of 1
Evers Steel Construction LLC, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
27 AUG 2026260396OTTOTT-SR 269-01.54 Bridge Repair (BRIDGE REPAIR)3 of 3$413,564+145%
16 JUL 2026260340HAMHAM-IR 275-23.38L (BRIDGE REPAIR)2 of 2$744,567+3.0%
25 JUN 2026260317DARDAR-BH-FY27 (BRIDGE REPAIR)2 of 2$729,945+6.0%
07 MAY 2026260255CLACLA-/MOT BH FY27 (BRIDGE REPAIR)2 of 3$936,710+47%
18 DEC 2025250608FRAFRA-SR 3-16.59 Damage Repair (BRIDGE REPAIR)1 of 3$493,258Low, 12% under the second
18 DEC 2025250609SCISCI-/JAC-52/93-35.72/15.48 (BRIDGE REPAIR)1 of 3$983,011Low, 12% under the second
25 SEP 2025250453BELBEL-SR 7-18.24 (BRIDGE REPAIR)1 of 2$789,515Low, 5.0% under the second
26 JUN 2025250332HAMHAM-US 22-11.41 (BRIDGE REPAIR)1 of 1$364,463Low
12 JUN 2025258013MARMAR-US 23-16.92 Damage Repair (BRIDGE REPAIR)1 of 1$607,582Low
22 MAY 2025258008WASWAS-IR 77-00.31 (BRIDGE REPAIR)1 of 1$798,085Low
10 APR 2025258004LUCLUC-SR 25-08.37 Bridge Repair (BRIDGE REPAIR)2 of 2$330,040+22%
27 FEB 2025250147LUCLUC-SR 2-21.24 Heat Straighten (BRIDGE REPAIR)2 of 2$248,950+58%
19 DEC 2024240592CLECLE-SR 32-06.84 (BRIDGE REPAIR)1 of 2$247,208Low, 19% under the second
22 AUG 2024248011JACJAC-SR 32-11.75 (BRIDGE REPAIR)1 of 1$588,674Low
08 AUG 2024240400RICRIC-US 30-08.79 Bridge Hit (BRIDGE REPAIR)3 of 4$154,460+55%
08 AUG 2024248010VANVAN-US 30-14.02/22.07 Bridge Hit (BRIDGE REPAIR)2 of 2$1,838,911+70%
27 JUN 2024240356GUEGUE-1SP-01.07 (BRIDGE REPAIR)6 of 6$273,975+293%
08 FEB 2024240123RICRIC-SR 309-08.73 (BRIDGE REPAIR)1 of 2$232,126Low, 36% under the second
10 AUG 2023238007LORLOR-SR 2-06.49 (BRIDGE REPAIR)2 of 3$217,669+10%
25 MAY 2023230339District 6D06-FY23 Bridge Repair (BRIDGE PAINTING)1 of 1$469,317Low
13 APR 2023230241SCISCI-US 52-35.72- Bridge Repair (BRIDGE REPAIR)1 of 1$477,236Low
30 MAR 2023230197CLACLA-US 68-11.47 (BRIDGE REPAIR)1 of 1$88,740Low
26 MAY 2022220361HAMHAM-SR 264-16.36R (BRIDGE REPAIR)2 of 2$246,700+15%
16 SEP 2021218018LUCLUC-IR 475-10.32 Bridge Hit (BRIDGE REPAIR)2 of 2$335,900+99%
17 JUN 2021210380CLACLA-US 68-13.66 (BRIDGE REPAIR)1 of 4$85,681Low, 38% under the second
Evers Steel Construction LLC: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way