Evers Steel Construction LLC: ODOT bid record
Evers Steel Construction LLC submitted 29 bids on Ohio DOT contracts in the data, from 26 MAR 2020 to 27 AUG 2026, and was the low bidder on 14 of them (48%). When it was not low, its total sat a median +37% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $6,371,216
- Latest bid
- 27 AUG 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 3 | 0 | 0% |
| 2021 | 3 | 2 | 67% |
| 2022 | 1 | 0 | 0% |
| 2023 | 4 | 3 | 75% |
| 2024 | 6 | 3 | 50% |
| 2025 | 8 | 6 | 75% |
| 2026 | 4 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| CLA | 3 | 2 | 67% |
| LUC | 3 | 0 | 0% |
| HAM | 3 | 1 | 33% |
| SCI | 2 | 2 | 100% |
| RIC | 2 | 1 | 50% |
| HEN | 1 | 0 | 0% |
| BUT | 1 | 0 | 0% |
| ERI | 1 | 0 | 0% |
| JEF | 1 | 1 | 100% |
| District 6 | 1 | 1 | 100% |
| LOR | 1 | 0 | 0% |
| GUE | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Repairing damaged members by grinding | 849E10600 | HR | 23 | 15 (65%) | $215.00 | $250.00 |
| Erosion control | 832E30000 | EACH | 12 | 12 (100%) | $1.00 | $1.00 |
| Law enforcement officer with patrol car for assistance | 614E11110 | HR | 16 | 11 (69%) | $75.00 | $80.00 |
| Field painting of damaged structural steel, as per plan | 514E20001 | SF | 23 | 10 (43%) | $155.00 | $150.00 |
| Structural steel members, level UF, as per plan | 513E10201 | LB | 14 | 9 (64%) | $21.00 | $15.75 |
| Structural steel, misc.: repair of damaged main ME | 513E95000 | FT | 8 | 7 (88%) | $1,200.00 | $1,594.59 |
| Portions of structure removed, as per plan (second | 202E11501 | EACH | 8 | 6 (75%) | $475.00 | $800.00 |
| Structural steel, misc.: repair of damaged members | 513E95030 | EACH | 5 | 5 (100%) | $115.00 | $392.50 |
| Structural steel, misc.:repair of damaged secondar | 513E90000 | LB | 5 | 4 (80%) | $25.00 | $25.00 |
| Structural steel, misc.: repair of damaged seconda | 513E95000 | FT | 5 | 4 (80%) | $150.00 | $338.00 |
| Concrete repair by epoxy injection | 512E10600 | FT | 7 | 2 (29%) | $600.00 | $125.00 |
| Concrete repair by epoxy injection, as per plan | 512E10601 | FT | 6 | 1 (17%) | $240.00 | $100.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Ruhlin Company | 14 | 9 of 14 |
| Armstrong Steel Erectors Inc | 6 | 2 of 6 |
| Suburban Maintenance & Construction Inc | 6 | 3 of 6 |
| Vimas Painting Company Inc | 6 | 2 of 6 |
| Advanced Painting & Contracting LLC | 3 | 1 of 3 |
| Advantage Steel & Construction LLC | 2 | 0 of 2 |
| Mosser Construction Inc | 1 | 0 of 1 |
| Forest City Erectors Inc | 1 | 0 of 1 |
| J & J Bridge Company Inc | 1 | 1 of 1 |
| Axis Civil Construction LLC | 1 | 1 of 1 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 27 AUG 2026 | 260396 | OTT | OTT-SR 269-01.54 Bridge Repair (BRIDGE REPAIR) | 3 of 3 | $413,564 | +145% |
| 16 JUL 2026 | 260340 | HAM | HAM-IR 275-23.38L (BRIDGE REPAIR) | 2 of 2 | $744,567 | +3.0% |
| 25 JUN 2026 | 260317 | DAR | DAR-BH-FY27 (BRIDGE REPAIR) | 2 of 2 | $729,945 | +6.0% |
| 07 MAY 2026 | 260255 | CLA | CLA-/MOT BH FY27 (BRIDGE REPAIR) | 2 of 3 | $936,710 | +47% |
| 18 DEC 2025 | 250608 | FRA | FRA-SR 3-16.59 Damage Repair (BRIDGE REPAIR) | 1 of 3 | $493,258 | Low, 12% under the second |
| 18 DEC 2025 | 250609 | SCI | SCI-/JAC-52/93-35.72/15.48 (BRIDGE REPAIR) | 1 of 3 | $983,011 | Low, 12% under the second |
| 25 SEP 2025 | 250453 | BEL | BEL-SR 7-18.24 (BRIDGE REPAIR) | 1 of 2 | $789,515 | Low, 5.0% under the second |
| 26 JUN 2025 | 250332 | HAM | HAM-US 22-11.41 (BRIDGE REPAIR) | 1 of 1 | $364,463 | Low |
| 12 JUN 2025 | 258013 | MAR | MAR-US 23-16.92 Damage Repair (BRIDGE REPAIR) | 1 of 1 | $607,582 | Low |
| 22 MAY 2025 | 258008 | WAS | WAS-IR 77-00.31 (BRIDGE REPAIR) | 1 of 1 | $798,085 | Low |
| 10 APR 2025 | 258004 | LUC | LUC-SR 25-08.37 Bridge Repair (BRIDGE REPAIR) | 2 of 2 | $330,040 | +22% |
| 27 FEB 2025 | 250147 | LUC | LUC-SR 2-21.24 Heat Straighten (BRIDGE REPAIR) | 2 of 2 | $248,950 | +58% |
| 19 DEC 2024 | 240592 | CLE | CLE-SR 32-06.84 (BRIDGE REPAIR) | 1 of 2 | $247,208 | Low, 19% under the second |
| 22 AUG 2024 | 248011 | JAC | JAC-SR 32-11.75 (BRIDGE REPAIR) | 1 of 1 | $588,674 | Low |
| 08 AUG 2024 | 240400 | RIC | RIC-US 30-08.79 Bridge Hit (BRIDGE REPAIR) | 3 of 4 | $154,460 | +55% |
| 08 AUG 2024 | 248010 | VAN | VAN-US 30-14.02/22.07 Bridge Hit (BRIDGE REPAIR) | 2 of 2 | $1,838,911 | +70% |
| 27 JUN 2024 | 240356 | GUE | GUE-1SP-01.07 (BRIDGE REPAIR) | 6 of 6 | $273,975 | +293% |
| 08 FEB 2024 | 240123 | RIC | RIC-SR 309-08.73 (BRIDGE REPAIR) | 1 of 2 | $232,126 | Low, 36% under the second |
| 10 AUG 2023 | 238007 | LOR | LOR-SR 2-06.49 (BRIDGE REPAIR) | 2 of 3 | $217,669 | +10% |
| 25 MAY 2023 | 230339 | District 6 | D06-FY23 Bridge Repair (BRIDGE PAINTING) | 1 of 1 | $469,317 | Low |
| 13 APR 2023 | 230241 | SCI | SCI-US 52-35.72- Bridge Repair (BRIDGE REPAIR) | 1 of 1 | $477,236 | Low |
| 30 MAR 2023 | 230197 | CLA | CLA-US 68-11.47 (BRIDGE REPAIR) | 1 of 1 | $88,740 | Low |
| 26 MAY 2022 | 220361 | HAM | HAM-SR 264-16.36R (BRIDGE REPAIR) | 2 of 2 | $246,700 | +15% |
| 16 SEP 2021 | 218018 | LUC | LUC-IR 475-10.32 Bridge Hit (BRIDGE REPAIR) | 2 of 2 | $335,900 | +99% |
| 17 JUN 2021 | 210380 | CLA | CLA-US 68-13.66 (BRIDGE REPAIR) | 1 of 4 | $85,681 | Low, 38% under the second |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.