Armstrong Steel Erectors Inc: ODOT bid record
Armstrong Steel Erectors Inc submitted 14 bids on Ohio DOT contracts in the data, from 13 FEB 2020 to 04 DEC 2025, and was the low bidder on 4 of them (29%). When it was not low, its total sat a median +10% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $1,447,000
- Latest bid
- 04 DEC 2025
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 6 | 3 | 50% |
| 2021 | 6 | 1 | 17% |
| 2023 | 1 | 0 | 0% |
| 2025 | 1 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| MUS | 2 | 0 | 0% |
| District 7 | 1 | 1 | 100% |
| HEN | 1 | 1 | 100% |
| BUT | 1 | 0 | 0% |
| ERI | 1 | 1 | 100% |
| MER | 1 | 0 | 0% |
| JEF | 1 | 0 | 0% |
| TUS | 1 | 0 | 0% |
| RIC | 1 | 1 | 100% |
| SCI | 1 | 0 | 0% |
| ROS | 1 | 0 | 0% |
| CLA | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Reset bearing, as per plan | 516E46701 | EACH | 20 | 16 (80%) | $1,657.50 | $1,350.00 |
| Erosion control | 832E30000 | EACH | 11 | 11 (100%) | $1.00 | $1.00 |
| Structural steel members, level UF, as per plan | 513E10201 | LB | 10 | 5 (50%) | $28.50 | $15.75 |
| Tack coat | 407E10000 | GAL | 7 | 4 (57%) | $1.85 | $3.25 |
| Field painting of damaged structural steel, as per plan | 514E20001 | SF | 6 | 4 (67%) | $54.00 | $150.00 |
| Portable changeable message sign, as per plan | 614E18601 | SNMT | 6 | 2 (33%) | $1,050.00 | $950.00 |
| Repairing damaged members by grinding | 849E10600 | HR | 7 | 1 (14%) | $315.00 | $250.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Ruhlin Company | 8 | 4 of 8 |
| Evers Steel Construction LLC | 6 | 4 of 6 |
| Complete General Construction Company | 5 | 5 of 5 |
| Suburban Maintenance & Construction Inc | 4 | 1 of 4 |
| Shelly & Sands Inc | 3 | 3 of 3 |
| Double Z Construction Company | 2 | 0 of 2 |
| DOT Construction Corp | 2 | 0 of 2 |
| Advantage Steel & Construction LLC | 2 | 0 of 2 |
| Bridge Specialists Inc | 2 | 2 of 2 |
| BCC Ohio Inc | 2 | 0 of 2 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 04 DEC 2025 | 250567 | MUS | MUS-US 22-11.59 (BRIDGE REPAIR) | 2 of 2 | $256,324 | -14% |
| 10 AUG 2023 | 238007 | LOR | LOR-SR 2-06.49 (BRIDGE REPAIR) | 3 of 3 | $286,619 | +45% |
| 17 JUN 2021 | 210378 | ROS | ROS-US 35-20.42 Bridge Repair (BRIDGE REPAIR) | 4 of 7 | $652,703 | +10% |
| 17 JUN 2021 | 210380 | CLA | CLA-US 68-13.66 (BRIDGE REPAIR) | 4 of 4 | $135,081 | +58% |
| 29 APR 2021 | 210280 | SCI | SCI-SR 139-11.38 (BRIDGE REPLACEMENT (1 BRIDGE)) | 5 of 6 | $2,257,188 | +10% |
| 15 APR 2021 | 210257 | RIC | RIC-US 30-16.42 (BRIDGE REPAIR) | 1 of 3 | $145,006 | Low, 21% under the second |
| 01 APR 2021 | 210215 | TUS | TUS-US 250-20.33 (BRIDGE REPAIR) | 4 of 6 | $1,387,695 | +7.0% |
| 14 JAN 2021 | 217000 | JEF | JEF-US 22-05.90 (BRIDGE REPAIR) | 2 of 5 | $192,426 | +32% |
| 15 OCT 2020 | 200497 | MER | MER-SR 707-16.97 (BRIDGE REPAIR) | 3 of 7 | $240,689 | +8.0% |
| 30 JUL 2020 | 207035 | ERI | ERI-SR 2-10.88 (BRIDGE REPAIR) | 1 of 7 | $174,990 | Low, 27% under the second |
| 21 MAY 2020 | 200301 | BUT | BUT-SR 129-21.39 (BRIDGE REPAIR) | 3 of 3 | $340,614 | +15% |
| 26 MAR 2020 | 200191 | HEN | HEN-US 6-12.47 Heat Straighten (BRIDGE REPAIR) | 1 of 2 | $118,692 | Low, 88% under the second |
| 27 FEB 2020 | 200107 | MUS | MUS-US 22-18.82 (BRIDGE REPLACEMENT (1 BRIDGE)) | 3 of 5 | $730,953 | +5.0% |
| 13 FEB 2020 | 200053 | District 7 | D07-BH FY20 (B) (BRIDGE REPAIR) | 1 of 2 | $1,008,312 | Low, 25% under the second |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.