DOT Construction Corp: ODOT bid record

DOT Construction Corp submitted 63 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 13 JUL 2023, and was the low bidder on 9 of them (14%). When it was not low, its total sat a median +31% above the low bid.

Owner
Ohio DOT
Low bid volume
$7,847,623
Latest bid
13 JUL 2023
Data through
12 NOV 2026
63Bids
9Low bids
14Win rate, percent
+31%Median gap to the low bid when not low, 54 bids

By year

YearBidsLow bidsWin rate
202019316%
20213027%
202211327%
20233133%
DOT Construction Corp, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
District 46233%
District 125240%
District 54125%
ROS300%
MUS2150%
CUY200%
District 7200%
District 11200%
LUC200%
ATH200%
LOG2150%
MOE200%
DOT Construction Corp, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH4747 (100%)$1.00$1.00
Ground mounted support, no. 2 post630E02100FT2924 (83%)$14.15$15.00
Removal of ground mounted post support and disposal630E86002EACH2723 (85%)$71.50$23.50
Removal of ground mounted sign and disposal630E84900EACH2523 (92%)$47.75$20.00
Sign, flat sheet630E80100SF2323 (100%)$84.25$31.63
Edge line, 6", type 1642E00104MI3020 (67%)$2,120.00$3,200.00
Water659E35000MGAL2017 (85%)$1.00$1.00
2" deep joint sealer, as per plan516E31011FT1816 (89%)$10.00$24.00
Patching concrete structure, as per plan519E11101SF4615 (33%)$100.00$150.00
Lane line, 6", type 1642E00204MI2215 (68%)$1,765.00$800.00
Tack coat407E10000GAL2213 (59%)$2.00$3.25
Removal of existing pavement marking512E74500FT1312 (92%)$0.55$3.00
DOT Construction Corp, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

DOT Construction Corp, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
13 JUL 2023230391District 12D12-CS FY2024 (CRACK SEALING)2 of 2$978,894+123%
25 MAY 2023230335BELBEL-SR 7-16.29 (BRIDGE REPAIR)6 of 6$379,013+81%
12 JAN 2023230031District 4D04-CS FY2023 (CRACK SEALING)1 of 6$1,070,466Low, 17% under the second
29 SEP 2022220514District 4D04-BH FY2023 (BRIDGE REPAIR)5 of 5$2,322,229+143%
28 JUL 2022220453District 12D12-CS FY2023 (CRACK SEALING)2 of 2$953,335+145%
14 JUL 2022220428District 2D02-CS FY2023 Crack Seal (CRACK SEALING)1 of 2$1,138,195Low, 10% under the second
12 MAY 2022220309BELBEL-IR 70-VARIOUS (BRIDGE REPAIR)4 of 5$371,823+25%
12 MAY 2022220315District 4D04-CS FY2022 (CRACK SEALING)2 of 4$835,0940.0%
17 MAR 2022220165AUGAUG-BH-FY22 (BRIDGE REPAIR)4 of 4$1,794,049+41%
17 MAR 2022220179LOGLOG-SR 287/VAR-00.68/VAR (BRIDGE REPAIR)1 of 2$1,291,159Low, 10% under the second
10 MAR 2022220129CHPCHP-/SHE-VAR/VAR (BRIDGE REPAIR)2 of 3$1,269,271+2.0%
17 FEB 2022220103MERMER-US 127/SR 29-07.57/02.85 (BRIDGE REPAIR)3 of 3$672,047+40%
13 JAN 2022220005District 12D12-BH FY2022 Deck Sealing (BRIDGE REPAIR)1 of 12$490,496Low, 9.0% under the second
13 JAN 2022220022ROSROS-SR 41-05.50 Geotech (SLIDE REPAIR)8 of 10$701,736+61%
16 DEC 2021210658District 7D07-BH-FY22 (B) (BRIDGE REPAIR)2 of 5$247,531+9.0%
16 DEC 2021210661JEFJEF-SR 7-10.37 Ramp B (SLIDE REPAIR)6 of 7$309,037+59%
16 DEC 2021210676District 5D05-CS-FY2022 (CRACK SEALING)5 of 7$463,732+18%
02 DEC 2021210636MOTMOT-SR 49-12.16 (BRIDGE REPAIR)2 of 5$290,998+3.0%
18 NOV 2021210606HASHAS-US 22-05.87 (SLIDE REPAIR)7 of 8$815,527+68%
28 OCT 2021210566CLACLA-SR 72-08.63 (BRIDGE REPAIR)10 of 10$1,370,772+53%
14 OCT 2021210532ATHATH-US 33-05.40 (BRIDGE REPAIR)5 of 5$1,121,736+29%
14 OCT 2021210559GALGAL-SR 218-10.26 (SLIDE REPAIR)9 of 10$844,365+46%
30 SEP 2021210512LUCLUC-IR 75/IR 280/IR 475 Var-Deck Sealing (PART 1 AND PART 2) (BRIDGE REPAIR)3 of 4$2,503,940+21%
16 SEP 2021210490District 4D04-BH FY2022 A (BRIDGE REPAIR)2 of 4$825,729+1.0%
16 SEP 2021210492GUEGUE-US 22-14.57 (SLIDE REPAIR)6 of 11$494,196+29%
DOT Construction Corp: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy