Becdir Construction Company: ODOT bid record

Becdir Construction Company submitted 41 bids on Ohio DOT contracts in the data, from 13 FEB 2020 to 08 FEB 2024, and was the low bidder on 3 of them (7%). When it was not low, its total sat a median +39% above the low bid.

Owner
Ohio DOT
Low bid volume
$4,778,527
Latest bid
08 FEB 2024
Data through
12 NOV 2026
41Bids
3Low bids
7Win rate, percent
+39%Median gap to the low bid when not low, 38 bids

By year

YearBidsLow bidsWin rate
20201616%
20211000%
20227114%
20237114%
2024100%
Becdir Construction Company, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
District 7500%
CUY300%
District 4300%
BEL300%
MOT200%
HAM200%
District 3200%
District 11200%
District 822100%
PIC100%
GUE100%
MEG100%
Becdir Construction Company, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Ground mounted support, no. 2 post630E02100FT6160 (98%)$6.50$15.00
Sealing of concrete surfaces (epoxy-urethane)512E10100SY5841 (71%)$40.00$34.00
Erosion control832E30000EACH3030 (100%)$1.00$1.00
Removal of ground mounted sign and disposal630E84900EACH6322 (35%)$12.00$20.00
Removal of ground mounted post support and disposal630E86002EACH6421 (33%)$12.00$23.50
Patching concrete bridge deck - type C519E12304SY2116 (76%)$520.00$700.00
Law enforcement officer with patrol car for assistance614E11110HR2915 (52%)$65.00$80.00
Sign, flat sheet630E80100SF5311 (21%)$19.00$24.00
Special - composite fiber wrap system519E00100SF138 (62%)$21.00$48.00
Patching concrete bridge deck - type B519E12300SY128 (67%)$410.00$800.00
Field painting of existing structural steel, prime coat514E00056SF127 (58%)$3.00$2.65
Concrete reinforcement, replacement of existing concrete reinforcement, as per plan509E20001LB87 (88%)$2.00$3.41
Becdir Construction Company, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Becdir Construction Company, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
08 FEB 2024240119District 11D11-DS-FY2024 (BRIDGE REPAIR)2 of 6$233,779+15%
09 NOV 2023230532ASDASD-/WAY-IR 71 BH FY2024 (B) (BRIDGE REPAIR)3 of 3$593,361+77%
12 OCT 2023230488District 7D07-BH-FY24 (B) (BRIDGE REPAIR)3 of 3$957,913+80%
25 MAY 2023230335BELBEL-SR 7-16.29 (BRIDGE REPAIR)3 of 6$256,772+22%
30 MAR 2023230176BUTBUT-US 27-00.80 (BRIDGE REPAIR)4 of 6$3,128,918+21%
30 MAR 2023230182District 8D08-Bridge Maintenance FY2023 (BRIDGE REPAIR)1 of 3$2,341,108Low, 7.0% under the second
09 FEB 2023230096LAKLAK-SR 44-06.05/VAR Slope (SLIDE REPAIR)3 of 3$638,682+43%
12 JAN 2023230004BELBEL-SR 7-14.15 (SPOT PATCHING / PAVEMENT REPAIR)3 of 4$1,574,487+23%
03 NOV 2022220593District 3D03-BH FY2023 (A) (BRIDGE REPAIR)2 of 2$634,798+80%
29 SEP 2022220514District 4D04-BH FY2023 (BRIDGE REPAIR)4 of 5$1,456,267+52%
12 MAY 2022220309BELBEL-IR 70-VARIOUS (BRIDGE REPAIR)2 of 5$309,284+4.0%
10 MAR 2022220153TUSTUS-US 250-12.32 (BRIDGE REPAIR)3 of 3$1,428,973+26%
17 FEB 2022220090District 8D08-Bridge Maintenance FY2022 (BRIDGE REPAIR)1 of 4$1,966,171Low, 1.0% under the second
13 JAN 2022220005District 12D12-BH FY2022 Deck Sealing (BRIDGE REPAIR)10 of 12$733,648+50%
13 JAN 2022220033LICLIC-SR 16-16.57 (MISCELLANEOUS)2 of 6$221,487+6.0%
16 DEC 2021210658District 7D07-BH-FY22 (B) (BRIDGE REPAIR)4 of 5$293,208+29%
16 DEC 2021210680CHPCHP-ODNR Kiser Lake State Park (CULVERT REPLACEMENT)4 of 5$67,711+51%
15 APR 2021210250CUYCUY-BH FY2021(A) Misc (PART 1 AND PART 2) (BRIDGE REPAIR)3 of 3$6,118,682+41%
15 APR 2021210253District 11D11-DS-FY2021 (BRIDGE REPAIR)3 of 10$189,648+13%
01 APR 2021210119District 1D01-BM FY21 (BRIDGE REPAIR)2 of 3$1,012,291+7.0%
01 APR 2021218002District 7D07-BH-FY21 (BRIDGE REPAIR)4 of 4$829,358+10%
11 MAR 2021210145CUYCUY-IR 480-22.41 Subdeck (BRIDGE REPAIR)6 of 13$209,377+28%
25 FEB 2021210121District 3D03-BH FY2021 (A) (BRIDGE REPAIR)5 of 5$643,488+67%
28 JAN 2021210058HAMHAM-IR 71-01.34 (MISCELLANEOUS)5 of 6$829,765+95%
14 JAN 2021210015District 9D09-CR-FY2021 (CULVERT REPLACEMENT)8 of 9$1,087,596+107%
Becdir Construction Company: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy