Becdir Construction Company: ODOT bid record
Becdir Construction Company submitted 41 bids on Ohio DOT contracts in the data, from 13 FEB 2020 to 08 FEB 2024, and was the low bidder on 3 of them (7%). When it was not low, its total sat a median +39% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $4,778,527
- Latest bid
- 08 FEB 2024
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 16 | 1 | 6% |
| 2021 | 10 | 0 | 0% |
| 2022 | 7 | 1 | 14% |
| 2023 | 7 | 1 | 14% |
| 2024 | 1 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| District 7 | 5 | 0 | 0% |
| CUY | 3 | 0 | 0% |
| District 4 | 3 | 0 | 0% |
| BEL | 3 | 0 | 0% |
| MOT | 2 | 0 | 0% |
| HAM | 2 | 0 | 0% |
| District 3 | 2 | 0 | 0% |
| District 11 | 2 | 0 | 0% |
| District 8 | 2 | 2 | 100% |
| PIC | 1 | 0 | 0% |
| GUE | 1 | 0 | 0% |
| MEG | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Ground mounted support, no. 2 post | 630E02100 | FT | 61 | 60 (98%) | $6.50 | $15.00 |
| Sealing of concrete surfaces (epoxy-urethane) | 512E10100 | SY | 58 | 41 (71%) | $40.00 | $34.00 |
| Erosion control | 832E30000 | EACH | 30 | 30 (100%) | $1.00 | $1.00 |
| Removal of ground mounted sign and disposal | 630E84900 | EACH | 63 | 22 (35%) | $12.00 | $20.00 |
| Removal of ground mounted post support and disposal | 630E86002 | EACH | 64 | 21 (33%) | $12.00 | $23.50 |
| Patching concrete bridge deck - type C | 519E12304 | SY | 21 | 16 (76%) | $520.00 | $700.00 |
| Law enforcement officer with patrol car for assistance | 614E11110 | HR | 29 | 15 (52%) | $65.00 | $80.00 |
| Sign, flat sheet | 630E80100 | SF | 53 | 11 (21%) | $19.00 | $24.00 |
| Special - composite fiber wrap system | 519E00100 | SF | 13 | 8 (62%) | $21.00 | $48.00 |
| Patching concrete bridge deck - type B | 519E12300 | SY | 12 | 8 (67%) | $410.00 | $800.00 |
| Field painting of existing structural steel, prime coat | 514E00056 | SF | 12 | 7 (58%) | $3.00 | $2.65 |
| Concrete reinforcement, replacement of existing concrete reinforcement, as per plan | 509E20001 | LB | 8 | 7 (88%) | $2.00 | $3.41 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| BCC Ohio Inc | 14 | 12 of 14 |
| DOT Construction Corp | 11 | 4 of 11 |
| Complete General Construction Company | 11 | 5 of 11 |
| Athos Contracting | 11 | 5 of 11 |
| Eagle Bridge Co | 8 | 4 of 8 |
| Ram Construction Services of Michigan, Inc | 7 | 3 of 7 |
| Sunesis Construction Co | 7 | 4 of 7 |
| Shelly & Sands Inc | 6 | 4 of 6 |
| Vasta Construction Company Inc | 6 | 1 of 6 |
| Marucci & Gaffney Excavating Co | 6 | 5 of 6 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 08 FEB 2024 | 240119 | District 11 | D11-DS-FY2024 (BRIDGE REPAIR) | 2 of 6 | $233,779 | +15% |
| 09 NOV 2023 | 230532 | ASD | ASD-/WAY-IR 71 BH FY2024 (B) (BRIDGE REPAIR) | 3 of 3 | $593,361 | +77% |
| 12 OCT 2023 | 230488 | District 7 | D07-BH-FY24 (B) (BRIDGE REPAIR) | 3 of 3 | $957,913 | +80% |
| 25 MAY 2023 | 230335 | BEL | BEL-SR 7-16.29 (BRIDGE REPAIR) | 3 of 6 | $256,772 | +22% |
| 30 MAR 2023 | 230176 | BUT | BUT-US 27-00.80 (BRIDGE REPAIR) | 4 of 6 | $3,128,918 | +21% |
| 30 MAR 2023 | 230182 | District 8 | D08-Bridge Maintenance FY2023 (BRIDGE REPAIR) | 1 of 3 | $2,341,108 | Low, 7.0% under the second |
| 09 FEB 2023 | 230096 | LAK | LAK-SR 44-06.05/VAR Slope (SLIDE REPAIR) | 3 of 3 | $638,682 | +43% |
| 12 JAN 2023 | 230004 | BEL | BEL-SR 7-14.15 (SPOT PATCHING / PAVEMENT REPAIR) | 3 of 4 | $1,574,487 | +23% |
| 03 NOV 2022 | 220593 | District 3 | D03-BH FY2023 (A) (BRIDGE REPAIR) | 2 of 2 | $634,798 | +80% |
| 29 SEP 2022 | 220514 | District 4 | D04-BH FY2023 (BRIDGE REPAIR) | 4 of 5 | $1,456,267 | +52% |
| 12 MAY 2022 | 220309 | BEL | BEL-IR 70-VARIOUS (BRIDGE REPAIR) | 2 of 5 | $309,284 | +4.0% |
| 10 MAR 2022 | 220153 | TUS | TUS-US 250-12.32 (BRIDGE REPAIR) | 3 of 3 | $1,428,973 | +26% |
| 17 FEB 2022 | 220090 | District 8 | D08-Bridge Maintenance FY2022 (BRIDGE REPAIR) | 1 of 4 | $1,966,171 | Low, 1.0% under the second |
| 13 JAN 2022 | 220005 | District 12 | D12-BH FY2022 Deck Sealing (BRIDGE REPAIR) | 10 of 12 | $733,648 | +50% |
| 13 JAN 2022 | 220033 | LIC | LIC-SR 16-16.57 (MISCELLANEOUS) | 2 of 6 | $221,487 | +6.0% |
| 16 DEC 2021 | 210658 | District 7 | D07-BH-FY22 (B) (BRIDGE REPAIR) | 4 of 5 | $293,208 | +29% |
| 16 DEC 2021 | 210680 | CHP | CHP-ODNR Kiser Lake State Park (CULVERT REPLACEMENT) | 4 of 5 | $67,711 | +51% |
| 15 APR 2021 | 210250 | CUY | CUY-BH FY2021(A) Misc (PART 1 AND PART 2) (BRIDGE REPAIR) | 3 of 3 | $6,118,682 | +41% |
| 15 APR 2021 | 210253 | District 11 | D11-DS-FY2021 (BRIDGE REPAIR) | 3 of 10 | $189,648 | +13% |
| 01 APR 2021 | 210119 | District 1 | D01-BM FY21 (BRIDGE REPAIR) | 2 of 3 | $1,012,291 | +7.0% |
| 01 APR 2021 | 218002 | District 7 | D07-BH-FY21 (BRIDGE REPAIR) | 4 of 4 | $829,358 | +10% |
| 11 MAR 2021 | 210145 | CUY | CUY-IR 480-22.41 Subdeck (BRIDGE REPAIR) | 6 of 13 | $209,377 | +28% |
| 25 FEB 2021 | 210121 | District 3 | D03-BH FY2021 (A) (BRIDGE REPAIR) | 5 of 5 | $643,488 | +67% |
| 28 JAN 2021 | 210058 | HAM | HAM-IR 71-01.34 (MISCELLANEOUS) | 5 of 6 | $829,765 | +95% |
| 14 JAN 2021 | 210015 | District 9 | D09-CR-FY2021 (CULVERT REPLACEMENT) | 8 of 9 | $1,087,596 | +107% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.