Vasta Construction Company Inc: ODOT bid record
Vasta Construction Company Inc submitted 13 bids on Ohio DOT contracts in the data, from 09 APR 2020 to 16 JUL 2026, and was the low bidder on 0 of them (0%). When it was not low, its total sat a median +62% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $0
- Latest bid
- 16 JUL 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 8 | 0 | 0% |
| 2021 | 2 | 0 | 0% |
| 2022 | 1 | 0 | 0% |
| 2023 | 1 | 0 | 0% |
| 2026 | 1 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| District 12 | 4 | 0 | 0% |
| HAM | 2 | 0 | 0% |
| District 5 | 1 | 0 | 0% |
| District 4 | 1 | 0 | 0% |
| ROS | 1 | 0 | 0% |
| LUC | 1 | 0 | 0% |
| District 11 | 1 | 0 | 0% |
| District 7 | 1 | 0 | 0% |
| District 8 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 11 | 11 (100%) | $1.00 | $1.00 |
| Patching concrete structure, as per plan | 519E11101 | SF | 43 | 4 (9%) | $190.00 | $150.00 |
| Sealing of concrete surfaces (epoxy-urethane) | 512E10100 | SY | 33 | 2 (6%) | $150.00 | $34.00 |
| Law enforcement officer with patrol car for assistance | 614E11110 | HR | 11 | 1 (9%) | $76.00 | $80.00 |
| Portable changeable message sign, as per plan | 614E18601 | SNMT | 7 | 1 (14%) | $1,200.00 | $950.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| DOT Construction Corp | 7 | 6 of 7 |
| Athos Contracting | 7 | 5 of 7 |
| Becdir Construction Company | 6 | 5 of 6 |
| A & A Painting LLC | 5 | 5 of 5 |
| BCC Ohio Inc | 5 | 5 of 5 |
| Aad Contracting Inc | 4 | 4 of 4 |
| Perk Company Inc | 4 | 4 of 4 |
| Ohio Concrete Paving LLC | 3 | 2 of 3 |
| Ram Construction Services of Michigan, Inc | 3 | 3 of 3 |
| Schirmer Construction LLC | 2 | 1 of 2 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 16 JUL 2026 | 260329 | District 8 | D08-PM Bridge FY27 (BRIDGE REPAIR) | 7 of 7 | $5,385,941 | +176% |
| 30 NOV 2023 | 230584 | HAM | HAM-IR 71-00.91 (BRIDGE REPAIR) | 4 of 4 | $198,500 | +98% |
| 13 JAN 2022 | 220005 | District 12 | D12-BH FY2022 Deck Sealing (BRIDGE REPAIR) | 11 of 12 | $765,432 | +56% |
| 16 DEC 2021 | 210658 | District 7 | D07-BH-FY22 (B) (BRIDGE REPAIR) | 5 of 5 | $311,960 | +38% |
| 15 APR 2021 | 210253 | District 11 | D11-DS-FY2021 (BRIDGE REPAIR) | 10 of 10 | $299,684 | +78% |
| 17 DEC 2020 | 200600 | LUC | LUC-IR 475-Deck Sealing FY21 (BRIDGE REPAIR) | 8 of 8 | $990,487 | +62% |
| 19 NOV 2020 | 200540 | District 4 | D04-BH FY2021 (East) (BRIDGE REPAIR) | 2 of 6 | $1,216,825 | +18% |
| 19 NOV 2020 | 200552 | ROS | ROS-US 23/US 35-VAR/VAR (BRIDGE REPAIR) | 10 of 10 | $657,726 | +104% |
| 17 SEP 2020 | 200463 | District 12 | D12-MNT FY2021 Tree Removal (PRUNING/OR TREE/BRUSH REMOVAL) | 4 of 4 | $655,155 | +65% |
| 17 SEP 2020 | 204019 | HAM | HAM-SR 125-03.78 (BRIDGE REPAIR) | 3 of 3 | $369,885 | +116% |
| 27 AUG 2020 | 200437 | District 5 | D05-BC FY 2021 (BRIDGE CLEANING) | 5 of 7 | $523,445 | +11% |
| 23 APR 2020 | 200233 | District 12 | D12-BH FY2020 Deck Sealing (BRIDGE REPAIR) | 5 of 8 | $1,169,066 | +19% |
| 09 APR 2020 | 200219 | District 12 | D12-BC FY2020 (BRIDGE CLEANING) | 5 of 5 | $1,850,100 | +54% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.