ODOT letting results, January 13, 2022
39 contracts let by Ohio DOT on January 13, 2022, $53,388,291 in low bids, a median of 3 bidders per contract. On the 39 with an engineer's estimate, the low bid came in under it 18 times; median low bid +2.0% against the estimate.
- Owner
- Ohio DOT
- Contracts
- 39
- Low bids, total
- $53,388,291
- Data through
- 12 NOV 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 220004 | CRA-US 30-15.80 (FOUR LANE RESURFACING) | CRA | 2 | Shelly & Sands Inc | $6,646,814 | $6,647,356 | 0.0% | -16% | ODOT |
| 220021 | PIC-US 23-00.00 (PART 1 AND PART 2) (FOUR LANE RESURFACING) | PIC | 2 | Shelly Company | $6,306,470 | $6,444,710 | +2.0% | -2.0% | ODOT |
| 220026 | CUY-IR 271X-05.81 (FOUR LANE RESURFACING) | CUY | 3 | Karvo Companies Inc | $5,728,000 | $6,403,183 | +12% | -3.0% | ODOT |
| 210641 | STA-US 30/SR 43-16.46/10.74 (FOUR LANE RESURFACING) | STA | 3 | Northstar Asphalt Inc | $3,541,224 | $3,899,068 | +10% | +7.0% | ODOT |
| 220007 | FAI-SR 37-06.10 (INTERSECTION) | FAI | 1 | Shelly Company | $2,952,090 | +4.0% | ODOT | ||
| 220013 | JAC-US 35-(01.79-02.75) Rest Stop (MINOR WIDENING) | JAC | 3 | Shelly & Sands Inc | $2,569,949 | $2,839,160 | +10% | -1.0% | ODOT |
| 220017 | LOR-SR 83-04.17 (TWO LANE RESURFACING) | LOR | 4 | Shelly Company | $2,526,812 | $2,586,670 | +2.0% | +2.0% | ODOT |
| 220010 | GEA-US 422-01.70/VAR Paint (BRIDGE PAINTING) | GEA | 10 | Industrial Painting & Rigging Inc | $2,165,420 | $2,634,111 | +22% | -30% | ODOT |
| 220008 | GAL-US 35-12.73/13.40 (BRIDGE REPAIR) | GAL | 3 | Complete General Construction Company | $1,723,699 | $1,941,935 | +13% | -18% | ODOT |
| 220030 | D05-PM FY2022 (B) Fast Dry West (PAVEMENT MARKING) | District 5 | 3 | Oglesby Construction Inc | $1,707,434 | $1,841,000 | +8.0% | +10% | ODOT |
| 220014 | LIC-US 62-00.49 (MINOR RECONSTRUCTION) | LIC | 4 | Shelly & Sands Inc | $1,469,950 | $1,510,651 | +3.0% | +14% | ODOT |
| 220015 | LOG-Pave-FY2022 (TWO LANE RESURFACING) | LOG | 1 | Shelly Company | $1,349,420 | +10% | ODOT | ||
| 224002 | WOO-SR 235-06.12/06.42 Bridge Repl. (CULVERT REPLACEMENT) | WOO | 2 | Vernon Nagel Inc | $1,333,402 | $1,363,341 | +2.0% | -6.0% | ODOT |
| 224003 | LOR-SR 83-21.40 (BRIDGE REPLACEMENT (1 BRIDGE)) | LOR | 3 | Great Lakes Demolition Company | $1,112,736 | $1,191,878 | +7.0% | +9.0% | ODOT |
| 220003 | COL-SR 267-01.74 (TWO LANE RESURFACING) | COL | 6 | Shelly & Sands Inc | $1,024,981 | $1,085,631 | +6.0% | 0.0% | ODOT |
| 220032 | D09-BH-FY2022 (B) (BRIDGE PAINTING) | District 9 | 8 | Elite Contractors Inc | $873,293 | $1,006,370 | +15% | -33% | ODOT |
| 220023 | ROS-US 50-00.00 PV (TWO LANE RESURFACING) | ROS | 2 | Shelly Company | $869,813 | $984,670 | +13% | -1.0% | ODOT |
| 223001 | TRU-SR 46-25.07 (BRIDGE REPAIR) | TRU | 5 | Kenmore Construction Co Inc | $861,147 | $893,893 | +4.0% | +10% | ODOT |
| 220029 | D03-RM FY2022 (SPOT PATCHING / PAVEMENT REPAIR) | District 3 | 4 | Kokosing Construction Company Inc | $750,488 | $777,881 | +4.0% | +11% | ODOT |
| 220002 | BUT-SR 177-04.69/05.29 (BRIDGE REPAIR) | BUT | 3 | Complete General Construction Company | $684,903 | $704,519 | +3.0% | +11% | ODOT |
| 220035 | MRG-SR 669-11.25 (SLIDE REPAIR) | MRG | 3 | Shelly & Sands Inc | $669,866 | $792,745 | +18% | +18% | ODOT |
| 224000 | VAN-SR 116-02.16/11.67 (CULVERT REPLACEMENT) | VAN | 3 | Eclipse Co LLC | $636,198 | $647,394 | +2.0% | +15% | ODOT |
| 220025 | WOO-IR 280-04.52 (FOUR LANE RESURFACING) | WOO | 2 | Gerken Paving Inc | $627,313 | $686,751 | +9.0% | +3.0% | ODOT |
| 220031 | D08-Mowing FY2022 (A) (MOWING) | District 8 | 2 | Linkel Company | $618,600 | $651,434 | +5.0% | -5.0% | ODOT |
| 220009 | GEA-SR 87-12.51/VAR (TWO LANE RESURFACING) | GEA | 4 | Ronyak Paving Inc | $611,000 | $654,507 | +7.0% | -6.0% | ODOT |
| 220005 | D12-BH FY2022 Deck Sealing (BRIDGE REPAIR) | District 12 | 12 | DOT Construction Corp | $490,496 | $534,032 | +9.0% | -33% | ODOT |
| 220022 | ROS-SR 41-05.50 Geotech (SLIDE REPAIR) | ROS | 10 | Shelly & Sands Inc | $434,939 | $459,370 | +6.0% | -7.0% | ODOT |
| 220012 | HEN-US 6-16.37 Slide Repair (SLIDE REPAIR) | HEN | 4 | Miller Bros Const Inc | $433,718 | $468,065 | +8.0% | +43% | ODOT |
| 220019 | MEG-CR 163-00.47 (BRIDGE REPLACEMENT (1 BRIDGE)) | MEG | 6 | D G M Inc | $411,855 | $439,540 | +7.0% | +4.0% | ODOT |
| 220011 | HAM-Eastern Corridor VAR TSG (SIGNALIZATION) | HAM | 2 | Miller Cable Company | $336,700 | $394,526 | +17% | +24% | ODOT |
| 220020 | MOT-Brookville SRTS IFS 1 (MISCELLANEOUS) | MOT | 7 | Double Jay Construction Inc | $295,800 | $312,320 | +6.0% | +10% | ODOT |
| 224001 | WAR-SR 122-06.33 (CULVERT REPLACEMENT) | WAR | 4 | Axis Civil Construction LLC | $279,351 | $291,910 | +4.0% | +10% | ODOT |
| 220001 | BUT-SR 129-07.20 (CULVERT REPLACEMENT) | BUT | 5 | W G Stang LLC | $249,837 | $252,690 | +1.0% | +3.0% | ODOT |
| 220027 | D01-CR FY22 (CULVERT REPLACEMENT) | District 1 | 5 | BCC Ohio Inc | $230,113 | $299,997 | +30% | -15% | ODOT |
| 220033 | LIC-SR 16-16.57 (MISCELLANEOUS) | LIC | 6 | Ohio-West Virginia Excavating Co | $209,467 | $221,487 | +6.0% | -28% | ODOT |
| 220028 | D03-LG FY2022(A) (LIGHTING) | District 3 | 4 | Perram Electric Inc | $197,092 | $197,388 | 0.0% | +16% | ODOT |
| 220034 | MAD-LONDON FISH HATCHERY (PARKING AREAS) | MAD | 3 | Cox Paving LLC | $169,454 | $172,883 | +2.0% | -8.0% | ODOT |
| 220018 | MAR-SR 47-02.46 (TWO LANE RESURFACING) | MAR | 3 | Park Enterprise Construction Co Inc | $146,543 | $189,183 | +29% | -20% | ODOT |
| 220024 | TUS-Bodmer Ave Sidewalks (SIDEWALK) | TUS | 9 | Smith Paving & Excavating Inc | $141,905 | $152,685 | +8.0% | -19% | ODOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out.