Industrial Painting & Rigging Inc: ODOT bid record

Industrial Painting & Rigging Inc submitted 12 bids on Ohio DOT contracts in the data, from 13 FEB 2020 to 23 MAY 2024, and was the low bidder on 6 of them (50%). When it was not low, its total sat a median +11% above the low bid.

Owner
Ohio DOT
Low bid volume
$13,687,671
Latest bid
23 MAY 2024
Data through
12 NOV 2026
12Bids
6Low bids
50Win rate, percent
+11%Median gap to the low bid when not low, 6 bids

By year

YearBidsLow bidsWin rate
20204250%
20212150%
20223267%
2023100%
20242150%
Industrial Painting & Rigging Inc, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
CUY5360%
LAK2150%
RIC100%
ATH100%
MOT11100%
GEA11100%
CLE100%
Industrial Painting & Rigging Inc, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Field painting structural steel, intermediate coat514E00060SF7257 (79%)$1.00$3.00
Field painting structural steel, finish coat514E00066SF5135 (69%)$1.00$2.52
Field painting of existing structural steel, prime coat514E00056SF7223 (32%)$2.00$2.65
Field painting structural steel, finish coat514E00066SF2121 (100%)$1.00$2.00
Field painting structural steel, finish coat514E00066SF2121 (100%)$1.00$2.00
Surface preparation of existing structural steel514E00050SF7219 (26%)$10.00$12.00
Final inspection repair514E10000EACH6911 (16%)$150.00$200.00
Erosion control832E30000EACH1111 (100%)$1.00$1.00
Grinding fins, tears, slivers on existing structural steel514E00504MNHR739 (12%)$85.00$110.00
Sealing of concrete surfaces (epoxy-urethane)512E10100SY86 (75%)$20.00$34.00
Removal of existing coatings from concrete surfaces512E74000SY65 (83%)$20.00$27.00
Law enforcement officer with patrol car for assistance614E11110HR113 (27%)$75.00$80.00
Industrial Painting & Rigging Inc, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Elite Contractors Inc113 of 11
Panther Industrial Painting LLC102 of 10
Apbn Inc103 of 10
KMX Painting Inc101 of 10
Corrosion Resistance LTD94 of 9
360 Construction Company Inc82 of 8
Legend Painting Inc62 of 6
Atsalis Brothers Painting Co51 of 5
Euro Paint LLC41 of 4
M & J Construction Co of Pinellas County Inc30 of 3
Industrial Painting & Rigging Inc, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
23 MAY 2024240305LAKLAK-SR 44-02.07/VAR Paint (BRIDGE PAINTING)1 of 6$1,874,360Low, 4.0% under the second
25 JAN 2024240046CLECLE-/CLI BP VAR 2024 (BRIDGE PAINTING)8 of 8$3,850,057+55%
27 JUL 2023230397CUYCUY-IR 71-04.67/VAR Paint (BRIDGE PAINTING)2 of 7$2,963,789+1.0%
10 MAR 2022220132CUYCUY-US 422-13.90/VAR Paint (BRIDGE PAINTING)1 of 7$1,774,277Low, 9.0% under the second
27 JAN 2022220073LAKLAK-SR 2-14.76/VAR Paint (BRIDGE PAINTING)7 of 9$3,935,245+22%
13 JAN 2022220010GEAGEA-US 422-01.70/VAR Paint (BRIDGE PAINTING)1 of 10$2,165,420Low, 22% under the second
28 OCT 2021210502CUYCUY-IR 90-07.58/13.72 Paint (BRIDGE PAINTING)2 of 14$5,887,294-24%
25 FEB 2021210150MOTMOT-BH/BP-FY21 (BRIDGE PAINTING)1 of 10$3,197,500Low, 11% under the second
19 NOV 2020200536ATHATH-US 50-09.45 (BRIDGE PAINTING)2 of 8$1,704,3770.0%
26 MAR 2020200163CUYCUY-IR 90-09.70 L&R Paint (BRIDGE PAINTING)1 of 10$2,782,494Low, 11% under the second
12 MAR 2020200126CUYCUY-IR 90-09.90/VAR Paint (BRIDGE PAINTING)1 of 7$1,893,619Low, 1.0% under the second
13 FEB 2020200073RICRIC-SR 13-05.30 (BRIDGE PAINTING)5 of 7$959,429+25%
Industrial Painting & Rigging Inc: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy