360 Construction Company Inc: ODOT bid record
360 Construction Company Inc submitted 41 bids on Ohio DOT contracts in the data, from 13 FEB 2020 to 29 OCT 2026, and was the low bidder on 4 of them (10%). When it was not low, its total sat a median +21% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $11,587,926
- Latest bid
- 29 OCT 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 2 | 0 | 0% |
| 2021 | 6 | 1 | 17% |
| 2022 | 8 | 0 | 0% |
| 2023 | 5 | 1 | 20% |
| 2024 | 8 | 0 | 0% |
| 2025 | 6 | 1 | 17% |
| 2026 | 6 | 1 | 17% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| CUY | 9 | 0 | 0% |
| District 7 | 5 | 1 | 20% |
| HAM | 3 | 1 | 33% |
| MOT | 2 | 0 | 0% |
| LAK | 2 | 0 | 0% |
| District 6 | 2 | 1 | 50% |
| District 1 | 2 | 0 | 0% |
| WIL | 1 | 0 | 0% |
| WAS | 1 | 0 | 0% |
| HUR | 1 | 0 | 0% |
| District 3 | 1 | 0 | 0% |
| GEA | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Field painting structural steel, finish coat | 514E00066 | SF | 147 | 81 (55%) | $2.00 | $2.52 |
| Field painting structural steel, intermediate coat | 514E00060 | SF | 180 | 78 (43%) | $2.00 | $3.00 |
| Final inspection repair | 514E10000 | EACH | 176 | 39 (22%) | $150.00 | $200.00 |
| Erosion control | 832E30000 | EACH | 35 | 35 (100%) | $1.00 | $1.00 |
| Field painting of existing structural steel, prime coat | 514E00056 | SF | 178 | 23 (13%) | $3.00 | $2.65 |
| Surface preparation of existing structural steel | 514E00050 | SF | 178 | 18 (10%) | $11.00 | $12.00 |
| Field painting structural steel, finish coat | 514E00066 | SF | 24 | 17 (71%) | $1.00 | $2.00 |
| Field painting structural steel, finish coat | 514E00066 | SF | 24 | 17 (71%) | $1.00 | $2.00 |
| Object marker, one way | 614E13350 | EACH | 18 | 10 (56%) | $16.50 | $17.00 |
| Work zone impact attenuator, 24" wide hazards, (unidirectional) | 614E12380 | EACH | 18 | 10 (56%) | $2,100.00 | $2,280.00 |
| Portable barrier, unanchored | 622E41100 | FT | 27 | 9 (33%) | $36.00 | $24.34 |
| Structural steel members, level UF, as per plan | 513E10201 | LB | 23 | 9 (39%) | $36.50 | $15.75 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Elite Contractors Inc | 37 | 20 of 37 |
| Apbn Inc | 30 | 17 of 30 |
| Panther Industrial Painting LLC | 24 | 10 of 24 |
| Legend Painting Inc | 24 | 6 of 24 |
| Corrosion Resistance LTD | 22 | 8 of 22 |
| KMX Painting Inc | 19 | 7 of 19 |
| Euro Paint LLC | 18 | 8 of 18 |
| Vimas Painting Company Inc | 14 | 8 of 14 |
| Atsalis Brothers Painting Co | 11 | 4 of 11 |
| Industrial Painting & Rigging Inc | 8 | 6 of 8 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 29 OCT 2026 | 260417 | LOR | LOR-SR 611-03.44 (BRIDGE PAINTING) | 3 of 7 | $21,867,795 | +27% |
| 01 OCT 2026 | 260423 | District 7 | D07-BP FY27 (BRIDGE REPAIR) | 2 of 6 | $1,926,064 | +10% |
| 01 OCT 2026 | 260437 | SEN | SEN-SR 18-02.76/31.37 Bridge Paint (BRIDGE PAINTING) | 4 of 5 | $700,429 | +42% |
| 30 JUL 2026 | 260344 | CUY | CUY-IR 480-10.77/VAR Paint (BRIDGE PAINTING) | 3 of 3 | $9,142,503 | +47% |
| 15 JAN 2026 | 260012 | District 1 | D01-BP FY26 (BRIDGE PAINTING) | 6 of 7 | $2,293,688 | +21% |
| 15 JAN 2026 | 260016 | HAM | HAM-SR 126-VAR (BRIDGE REPAIR) | 1 of 1 | $6,184,753 | Low |
| 23 OCT 2025 | 250493 | District 7 | D07-BP FY26 (BRIDGE PAINTING) | 3 of 8 | $1,630,177 | +10% |
| 09 OCT 2025 | 250470 | MOT | MOT-BP FY26 (BRIDGE PAINTING) | 4 of 7 | $3,010,753 | +15% |
| 28 AUG 2025 | 250391 | CUY | CUY-IR 480-07.92/VAR Paint (BRIDGE PAINTING) | 2 of 9 | $5,183,848 | +1.0% |
| 24 APR 2025 | 250218 | GAL | GAL-US 35-17.43 & VARIOUS (BRIDGE PAINTING) | 3 of 5 | $2,757,629 | +20% |
| 27 MAR 2025 | 250157 | HAM | HAM-IR 471-00.00 Type 3 ER (BRIDGE REPAIR) | 3 of 5 | $1,848,209 | +58% |
| 30 JAN 2025 | 250042 | BUT | BUT-/HAM BP FY2025 (BRIDGE REPAIR) | 1 of 4 | $917,633 | Low, 8.0% under the second |
| 05 DEC 2024 | 240559 | MIA | MIA-SR 55-04.89 (BRIDGE PAINTING) | 5 of 7 | $654,597 | +37% |
| 14 NOV 2024 | 240518 | District 1 | D01-BP FY25 (BRIDGE PAINTING) | 3 of 9 | $2,149,513 | +21% |
| 17 OCT 2024 | 240466 | HAM | HAM-IR 74-08.38/09.11 (BRIDGE REPAIR) | 2 of 7 | $3,568,840 | +20% |
| 13 JUN 2024 | 240302 | CUY | CUY-IR 77-00.38/VAR Paint (BRIDGE PAINTING) | 4 of 4 | $2,173,123 | +45% |
| 23 MAY 2024 | 240303 | District 6 | D06-BP-FY24 (BRIDGE PAINTING) | 6 of 6 | $3,191,337 | +23% |
| 23 MAY 2024 | 240305 | LAK | LAK-SR 44-02.07/VAR Paint (BRIDGE PAINTING) | 5 of 6 | $2,268,600 | +21% |
| 08 FEB 2024 | 240085 | District 7 | D07-BP/BH FY24 (BRIDGE PAINTING) | 2 of 7 | $5,677,637 | +2.0% |
| 25 JAN 2024 | 240046 | CLE | CLE-/CLI BP VAR 2024 (BRIDGE PAINTING) | 5 of 8 | $3,259,875 | +31% |
| 27 JUL 2023 | 230397 | CUY | CUY-IR 71-04.67/VAR Paint (BRIDGE PAINTING) | 3 of 7 | $3,339,214 | +14% |
| 27 JUL 2023 | 230398 | FUL | FUL-US 20/US 20A-09.14/02.53 Bdg Paint (BRIDGE PAINTING) | 4 of 6 | $572,287 | +21% |
| 11 MAY 2023 | 230288 | District 6 | D06-BP-FY23 (BRIDGE PAINTING) | 1 of 6 | $3,136,735 | Low, 12% under the second |
| 13 APR 2023 | 230180 | CUY | CUY-SR 8/SR 10-02.26/08.69 (BRIDGE REPAIR) | 2 of 2 | $10,313,433 | +10% |
| 12 JAN 2023 | 230011 | District 7 | D07-BP-FY23 (BRIDGE PAINTING) | 4 of 8 | $1,688,113 | +37% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.