360 Construction Company Inc: ODOT bid record

360 Construction Company Inc submitted 41 bids on Ohio DOT contracts in the data, from 13 FEB 2020 to 29 OCT 2026, and was the low bidder on 4 of them (10%). When it was not low, its total sat a median +21% above the low bid.

Owner
Ohio DOT
Low bid volume
$11,587,926
Latest bid
29 OCT 2026
Data through
12 NOV 2026
41Bids
4Low bids
10Win rate, percent
+21%Median gap to the low bid when not low, 37 bids

By year

YearBidsLow bidsWin rate
2020200%
20216117%
2022800%
20235120%
2024800%
20256117%
20266117%
360 Construction Company Inc, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
CUY900%
District 75120%
HAM3133%
MOT200%
LAK200%
District 62150%
District 1200%
WIL100%
WAS100%
HUR100%
District 3100%
GEA100%
360 Construction Company Inc, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Field painting structural steel, finish coat514E00066SF14781 (55%)$2.00$2.52
Field painting structural steel, intermediate coat514E00060SF18078 (43%)$2.00$3.00
Final inspection repair514E10000EACH17639 (22%)$150.00$200.00
Erosion control832E30000EACH3535 (100%)$1.00$1.00
Field painting of existing structural steel, prime coat514E00056SF17823 (13%)$3.00$2.65
Surface preparation of existing structural steel514E00050SF17818 (10%)$11.00$12.00
Field painting structural steel, finish coat514E00066SF2417 (71%)$1.00$2.00
Field painting structural steel, finish coat514E00066SF2417 (71%)$1.00$2.00
Object marker, one way614E13350EACH1810 (56%)$16.50$17.00
Work zone impact attenuator, 24" wide hazards, (unidirectional)614E12380EACH1810 (56%)$2,100.00$2,280.00
Portable barrier, unanchored622E41100FT279 (33%)$36.00$24.34
Structural steel members, level UF, as per plan513E10201LB239 (39%)$36.50$15.75
360 Construction Company Inc, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

360 Construction Company Inc, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
29 OCT 2026260417LORLOR-SR 611-03.44 (BRIDGE PAINTING)3 of 7$21,867,795+27%
01 OCT 2026260423District 7D07-BP FY27 (BRIDGE REPAIR)2 of 6$1,926,064+10%
01 OCT 2026260437SENSEN-SR 18-02.76/31.37 Bridge Paint (BRIDGE PAINTING)4 of 5$700,429+42%
30 JUL 2026260344CUYCUY-IR 480-10.77/VAR Paint (BRIDGE PAINTING)3 of 3$9,142,503+47%
15 JAN 2026260012District 1D01-BP FY26 (BRIDGE PAINTING)6 of 7$2,293,688+21%
15 JAN 2026260016HAMHAM-SR 126-VAR (BRIDGE REPAIR)1 of 1$6,184,753Low
23 OCT 2025250493District 7D07-BP FY26 (BRIDGE PAINTING)3 of 8$1,630,177+10%
09 OCT 2025250470MOTMOT-BP FY26 (BRIDGE PAINTING)4 of 7$3,010,753+15%
28 AUG 2025250391CUYCUY-IR 480-07.92/VAR Paint (BRIDGE PAINTING)2 of 9$5,183,848+1.0%
24 APR 2025250218GALGAL-US 35-17.43 & VARIOUS (BRIDGE PAINTING)3 of 5$2,757,629+20%
27 MAR 2025250157HAMHAM-IR 471-00.00 Type 3 ER (BRIDGE REPAIR)3 of 5$1,848,209+58%
30 JAN 2025250042BUTBUT-/HAM BP FY2025 (BRIDGE REPAIR)1 of 4$917,633Low, 8.0% under the second
05 DEC 2024240559MIAMIA-SR 55-04.89 (BRIDGE PAINTING)5 of 7$654,597+37%
14 NOV 2024240518District 1D01-BP FY25 (BRIDGE PAINTING)3 of 9$2,149,513+21%
17 OCT 2024240466HAMHAM-IR 74-08.38/09.11 (BRIDGE REPAIR)2 of 7$3,568,840+20%
13 JUN 2024240302CUYCUY-IR 77-00.38/VAR Paint (BRIDGE PAINTING)4 of 4$2,173,123+45%
23 MAY 2024240303District 6D06-BP-FY24 (BRIDGE PAINTING)6 of 6$3,191,337+23%
23 MAY 2024240305LAKLAK-SR 44-02.07/VAR Paint (BRIDGE PAINTING)5 of 6$2,268,600+21%
08 FEB 2024240085District 7D07-BP/BH FY24 (BRIDGE PAINTING)2 of 7$5,677,637+2.0%
25 JAN 2024240046CLECLE-/CLI BP VAR 2024 (BRIDGE PAINTING)5 of 8$3,259,875+31%
27 JUL 2023230397CUYCUY-IR 71-04.67/VAR Paint (BRIDGE PAINTING)3 of 7$3,339,214+14%
27 JUL 2023230398FULFUL-US 20/US 20A-09.14/02.53 Bdg Paint (BRIDGE PAINTING)4 of 6$572,287+21%
11 MAY 2023230288District 6D06-BP-FY23 (BRIDGE PAINTING)1 of 6$3,136,735Low, 12% under the second
13 APR 2023230180CUYCUY-SR 8/SR 10-02.26/08.69 (BRIDGE REPAIR)2 of 2$10,313,433+10%
12 JAN 2023230011District 7D07-BP-FY23 (BRIDGE PAINTING)4 of 8$1,688,113+37%
360 Construction Company Inc: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy