| 1 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $14,000 |
| 2 | Pavement removed (202E23000) | SY | 155 | $20.00 |
| 3 | Curb removed, as per plan (202E32001) | FT | 698 | $30.00 |
| 4 | Guardrail removed (202E38000) | FT | 600 | $2.00 |
| 5 | Anchor assembly removed, type E (202E42010) | EACH | 2 | $150.00 |
| 6 | Excavation (203E10000) | CY | 18 | $350.00 |
| 7 | Embankment (203E20000) | CY | 11 | $150.00 |
| 8 | Guardrail, type MGS (606E15050) | FT | 275 | $23.20 |
| 9 | Anchor assembly, MGS type E (MASH 2016), softstop (606E26150) | EACH | 2 | $2,520.00 |
| 10 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 2 | $2,730.00 |
| 11 | Concrete barrier, single slope, type D (622E10160) | FT | 192 | $350.00 |
| 12 | Concrete barrier end section, type D (622E25000) | EACH | 2 | $6,500.00 |
| 13 | Concrete barrier, end anchorage, reinforced, type D (622E25050) | EACH | 2 | $7,000.00 |
| 14 | Seeding and mulching (659E10000) | SY | 312 | $9.75 |
| 15 | Repair seeding and mulching (659E14000) | SY | 16 | $6.50 |
| 16 | Commercial fertilizer (659E20000) | TON | 0.04 | $615.00 |
| 17 | Lime (659E31000) | ACRE | 0.06 | $45.00 |
| 18 | Water (659E35000) | MGAL | 1.70 | $1.00 |
| 19 | Erosion control (832E30000) | EACH | 10,000 | $1.00 |
| 20 | Pipe removed, 24" and under, as per plan (202E35101) | FT | 3 | $1,000.00 |
| 21 | Subgrade compaction (204E10000) | SY | 349 | $10.00 |
| 22 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 30 | $750.00 |
| 23 | Aggregate base (304E20000) | CY | 52 | $100.00 |
| 26 | Curb, type 4-C, as per plan (609E24511) | FT | 42 | $100.00 |
| 27 | Barrier reflector, type 1 (uni-directional) (626E00102) | EACH | 9 | $15.00 |
| 28 | Barrier reflector, type 2 (uni-directional) (626E00110) | EACH | 6 | $15.00 |
| 29 | Law enforcement officer with patrol car for assistance, as per plan (614E11111) | HR | 300 | $95.00 |
| 30 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 14 | $3,300.00 |
| 31 | Barrier reflector, type 1(uni-directional) (614E13310) | EACH | 52 | $15.00 |
| 32 | Object marker, one way (614E13350) | EACH | 52 | $20.00 |
| 33 | Maintaining traffic, misc.:plastic water-filled BA (614E18030) | FT | 450 | $28.00 |
| 34 | Portable changeable message sign, as per plan (614E18601) | SNMT | 10 | $750.00 |
| 35 | Portable barrier, unanchored (622E41100) | FT | 2,600 | $51.93 |
| 36 | Special - asbestos abatement: work involving asbes (690E71000) | LS | 1 | $750.00 |
| 37 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $5,709.52 |
| 38 | Dowel holes with nonshrink, nonmetallic grout, as per plan (510E10001) | EACH | 14 | $75.00 |
| 39 | Structural steel members, level UF (513E10200) | LB | 532 | $2.00 |
| 40 | Structural steel, misc.: remove and RE-erect cross (513E95020) | LS | 1 | $4,900.00 |
| 41 | Surface preparation of existing structural steel (514E00050) | SF | 2,945 | $40.00 |
| 42 | Field painting of existing structural steel, prime coat (514E00056) | SF | 2,945 | $35.00 |
| 43 | Field painting structural steel, intermediate coat (514E00060) | SF | 2,945 | $5.00 |
| 44 | Field painting structural steel, finish coat (514E00066) | SF | 2,945 | $5.00 |
| 45 | Grinding fins, tears, slivers on existing structural steel (514E00504) | MNHR | 2 | $150.00 |
| 46 | Final inspection repair (514E10000) | EACH | 2 | $250.00 |
| 47 | Elastomeric bearing with internal laminates and load plate (516E44300) | EACH | 7 | $5,300.00 |
| 48 | Jacking and temporary support of superstructure, as per plan (516E47001) | LS | 1 | $28,150 |
| 49 | Scupper, misc.: debris removal (518E12500) | EACH | 10 | $250.00 |
| 50 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $6,280.00 |
| 51 | Dowel holes with nonshrink, nonmetallic grout, as per plan (510E10001) | EACH | 24 | $75.00 |
| 52 | Sealing of concrete surfaces (epoxy-urethane), as per plan (512E10101) | SY | 2,443 | $45.00 |
| 53 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 2,443 | $35.00 |
| 54 | Structural steel members, level UF (513E10200) | LB | 912 | $2.00 |
| 55 | Structural steel, misc.: remove and RE-erect cross (513E95020) | LS | 1 | $8,000.00 |
| 56 | Structural steel, misc.: weld cracked expansion JO (513E95020) | LS | 1 | $6,600.00 |
| 57 | Surface preparation of existing structural steel (514E00050) | SF | 52,512 | $11.00 |
| 58 | Field painting of existing structural steel, prime coat (514E00056) | SF | 52,512 | $6.50 |
| 59 | Field painting structural steel, intermediate coat (514E00060) | SF | 52,512 | $3.00 |
| 60 | Field painting structural steel, finish coat (514E00066) | SF | 52,512 | $2.00 |
| 61 | Grinding fins, tears, slivers on existing structural steel (514E00504) | MNHR | 39 | $150.00 |
| 62 | Final inspection repair (514E10000) | EACH | 23 | $250.00 |
| 63 | Elastomeric bearing with internal laminates and load plate (516E44200) | EACH | 12 | $4,700.00 |
| 64 | Jacking and temporary support of superstructure, as per plan (516E47001) | LS | 1 | $75,390 |
| 65 | Special - composite fiber wrap system (519E00100) | SF | 1,152 | $85.00 |
| 66 | Patching concrete structure, as per plan (519E11101) | SF | 241 | $375.00 |
| 67 | Patching concrete bridge deck - type B (519E12300) | SY | 14 | $650.00 |
| 68 | Galvanic anode protection, as per plan (844E20001) | EACH | 15 | $70.00 |
| 69 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $2,930.00 |
| 70 | Dowel holes with nonshrink, nonmetallic grout, as per plan (510E10001) | EACH | 16 | $75.00 |
| 71 | Sealing of concrete surfaces (epoxy-urethane), as per plan (512E10101) | SY | 1,058 | $45.00 |
| 72 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 1,058 | $35.00 |
| 73 | Structural steel members, level UF (513E10200) | LB | 608 | $2.00 |
| 74 | Structural steel, misc.: remove and RE-erect cross (513E95020) | LS | 1 | $4,850.00 |
| 75 | Surface preparation of existing structural steel (514E00050) | SF | 13,148 | $18.00 |
| 76 | Field painting of existing structural steel, prime coat (514E00056) | SF | 13,148 | $8.00 |
| 77 | Field painting structural steel, intermediate coat (514E00060) | SF | 13,148 | $4.00 |
| 78 | Field painting structural steel, finish coat (514E00066) | SF | 13,148 | $3.00 |
| 79 | Grinding fins, tears, slivers on existing structural steel (514E00504) | MNHR | 16 | $150.00 |
| 80 | Final inspection repair (514E10000) | EACH | 6 | $250.00 |
| 81 | Elastomeric bearing with internal laminates and load plate (516E44100) | EACH | 8 | $4,500.00 |
| 82 | Jacking and temporary support of superstructure, as per plan (516E47001) | LS | 1 | $31,410 |
| 83 | Special - composite fiber wrap system (519E00100) | SF | 387 | $115.00 |
| 84 | Patching concrete structure, as per plan (519E11101) | SF | 152 | $675.00 |
| 85 | Galvanic anode protection, as per plan (844E20001) | EACH | 10 | $70.00 |
| 86 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $4,790.00 |
| 87 | Special - fill and plug existing conduit (202E70000) | FT | 12 | $200.00 |
| 88 | Dowel holes with nonshrink, nonmetallic grout, as per plan (510E10001) | EACH | 20 | $75.00 |
| 89 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 1,267 | $45.00 |
| 90 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 1,267 | $35.00 |
| 91 | Structural steel members, level UF (513E10200) | LB | 760 | $2.00 |
| 92 | Structural steel, misc.: remove and RE-erect cross (513E95020) | LS | 1 | $6,400.00 |
| 93 | Surface preparation of existing structural steel (514E00050) | SF | 20,901 | $18.00 |
| 94 | Field painting of existing structural steel, prime coat (514E00056) | SF | 20,901 | $8.00 |
| 95 | Field painting structural steel, intermediate coat (514E00060) | SF | 20,901 | $4.00 |
| 96 | Field painting structural steel, finish coat (514E00066) | SF | 20,901 | $3.00 |
| 97 | Grinding fins, tears, slivers on existing structural steel (514E00504) | MNHR | 25 | $150.00 |
| 98 | Final inspection repair (514E10000) | EACH | 9 | $250.00 |
| 99 | Elastomeric bearing with internal laminates and load plate (516E44100) | EACH | 10 | $4,200.00 |
| 100 | Jacking and temporary support of superstructure, as per plan (516E47001) | LS | 1 | $37,450 |
| 101 | Special - composite fiber wrap system (519E00100) | SF | 321 | $145.00 |
| 102 | Patching concrete structure, as per plan (519E11101) | SF | 130 | $750.00 |
| 103 | Patching concrete bridge deck - type B (519E12300) | SY | 5 | $1,000.00 |
| 104 | Galvanic anode protection, as per plan (844E20001) | EACH | 6 | $70.00 |
| 105 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $5,000.00 |
| 106 | Bridge railing removed, as per plan (202E38501) | FT | 20 | $25.00 |
| 107 | Vandal protection fence removed and reset, as per plan (202E75267) | FT | 25 | $267.00 |
| 108 | Class QC2 concrete, superstructure (511E34410) | CY | 1 | $10,000 |
| 109 | Sealing of concrete surfaces (non-epoxy) (512E10050) | SY | 230 | $18.00 |
| 110 | Sealing of concrete surfaces (epoxy-urethane), as per plan (512E10101) | SY | 687 | $45.00 |
| 111 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 793 | $35.00 |
| 112 | Surface preparation of existing structural steel (514E00050) | SF | 21,844 | $20.00 |
| 113 | Field painting of existing structural steel, prime coat (514E00056) | SF | 21,844 | $10.00 |
| 114 | Field painting structural steel, intermediate coat (514E00060) | SF | 21,844 | $4.00 |
| 115 | Field painting structural steel, finish coat (514E00066) | SF | 21,844 | $2.00 |
| 116 | Grinding fins, tears, slivers on existing structural steel (514E00504) | MNHR | 29 | $150.00 |
| 117 | Final inspection repair (514E10000) | EACH | 10 | $250.00 |
| 118 | Railing, aluminum, as per plan (517E75001) | FT | 20 | $135.00 |
| 119 | Special - composite fiber wrap system (519E00100) | SF | 66 | $190.00 |
| 120 | Patching concrete structure, as per plan (519E11101) | SF | 621 | $345.00 |
| 121 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $75,000 |
| 122 | Maintaining traffic (614E11000) | LS | 1 | $435,000 |
| 123 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $1,500.00 |
| 124 | Mobilization (624E10000) | LS | 1 | $200,000 |
| 200 | 10" non-reinforced concrete pavement, class QC MS (452E14050) | SY | 155 | $250.00 |
| 201 | Concrete, misc.: leveling bearing seat (511E81300) | EACH | 7 | $1,600.00 |
| 202 | Concrete, misc.: leveling bearing seat (511E81300) | EACH | 12 | $250.00 |
| 203 | Concrete, misc.: leveling bearing seat (511E81300) | EACH | 8 | $250.00 |
| 204 | Concrete, misc.: leveling bearing seat (511E81300) | EACH | 10 | $250.00 |