ODOT contract 250391 bid tabulation
CUY-IR 480-07.92/VAR Paint (BRIDGE PAINTING). Let by Ohio DOT on August 28, 2025, CUY. 9 bids received; low bid $5,121,353 by Panther Industrial Painting LLC, -8.5% against the engineer's estimate of $5,600,000.
- Owner
- Ohio DOT
- Letting
- 28 AUG 2025
- Pay items
- 73
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Panther Industrial Painting LLC | $5,121,353 | Low | -9.0% |
| 2 | 360 Construction Company Inc | $5,183,848 | +1.0% | -7.0% |
| 3 | Euro Paint LLC | $5,337,817 | +4.0% | -5.0% |
| 4 | M & J Construction Co of Pinellas County Inc | $6,233,103 | +22% | +11% |
| 5 | Corrosion Resistance LTD | $6,565,127 | +28% | +17% |
| 6 | Vimas Painting Company Inc | $6,587,405 | +29% | +18% |
| 7 | Apbn Inc | $6,957,200 | +36% | +24% |
| 8 | Elite Contractors Inc | $7,169,603 | +40% | +28% |
| 9 | Legend Painting Inc | $11,540,836 | +125% | +106% |
Engineer's estimate: $5,600,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Panther Industrial Painting LLC | 2. 360 Construction Company Inc | 3. Euro Paint LLC | 4. M & J Construction Co of Pinellas County Inc | 5. Corrosion Resistance LTD | 6. Vimas Painting Company Inc |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $1,000.00 | $5,000.00 | $20,000 | $150,000 | $20,000 | $10,000 |
| 2 | Erosion control (832E30000) | EACH | 8,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 3 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 500 | $150.00 | $95.00 | $95.00 | $168.00 | $95.00 | $60.00 |
| 4 | Detour signing (614E12420) | LS | 1 | $10,000 | $6,330.06 | $6,330.06 | $16,681 | $6,800.00 | $30,000 |
| 5 | Portable changeable message sign, as per plan (614E18601) | SNMT | 12 | $1,000.00 | $1,207.17 | $1,207.17 | $1,388.05 | $1,000.00 | $2,000.00 |
| 6 | Surface preparation of existing structural steel (514E00050) | SF | 76,300 | $11.00 | $8.00 | $11.25 | $9.00 | $11.15 | $14.00 |
| 7 | Field painting of existing structural steel, prime coat (514E00056) | SF | 76,300 | $2.25 | $5.00 | $2.49 | $4.00 | $2.85 | $3.00 |
| 8 | Field painting structural steel, intermediate coat (514E00060) | SF | 76,300 | $2.25 | $3.00 | $2.49 | $5.00 | $3.25 | $3.00 |
| 9 | Field painting structural steel, finish coat (514E00066) | SF | 76,300 | $2.25 | $2.00 | $2.49 | $4.00 | $4.15 | $2.50 |
| 10 | Grinding fins, tears, slivers on existing structural steel (514E00504) | MNHR | 80 | $200.00 | $150.00 | $50.00 | $120.00 | $115.00 | $200.00 |
| 11 | Final inspection repair (514E10000) | EACH | 49 | $300.00 | $150.00 | $50.00 | $1,600.00 | $235.00 | $200.00 |
| 12 | Patching concrete structure, as per plan (519E11101) | SF | 505 | $200.00 | $335.00 | $225.27 | $300.00 | $330.00 | $200.00 |
| 13 | Signing, misc.: overpass installation (630E97700) | EACH | 4 | $3,000.00 | $1,000.00 | $2,000.00 | $500.00 | $250.00 | $2,000.00 |
| 14 | Structural steel members, level UF, as per plan (513E10201) | LB | 2,468 | $50.00 | $38.10 | $38.10 | $42.78 | $34.60 | $40.00 |
| 15 | Surface preparation of existing structural steel (514E00050) | SF | 10,600 | $11.00 | $10.00 | $18.43 | $7.00 | $16.40 | $22.00 |
| 16 | Field painting of existing structural steel, prime coat (514E00056) | SF | 10,600 | $2.25 | $6.00 | $4.01 | $3.00 | $4.85 | $4.00 |
| 17 | Field painting structural steel, intermediate coat (514E00060) | SF | 10,600 | $2.25 | $5.00 | $4.01 | $4.00 | $7.15 | $2.00 |
| 18 | Field painting structural steel, finish coat (514E00066) | SF | 10,600 | $2.25 | $4.00 | $4.01 | $4.00 | $7.25 | $2.00 |
| 19 | Grinding fins, tears, slivers on existing structural steel (514E00504) | MNHR | 16 | $200.00 | $150.00 | $50.00 | $120.00 | $115.00 | $200.00 |
| 20 | Final inspection repair (514E10000) | EACH | 11 | $300.00 | $150.00 | $50.00 | $1,200.00 | $235.00 | $200.00 |
| 21 | Signing, misc.: overpass installation (630E97700) | EACH | 2 | $3,000.00 | $1,000.00 | $2,000.00 | $500.00 | $250.00 | $2,000.00 |
| 22 | Structural steel members, level UF, as per plan (513E10201) | LB | 279 | $70.00 | $65.68 | $65.68 | $75.42 | $62.18 | $70.00 |
| 23 | Surface preparation of existing structural steel (514E00050) | SF | 11,400 | $11.00 | $10.00 | $18.34 | $7.00 | $10.75 | $22.00 |
| 24 | Field painting of existing structural steel, prime coat (514E00056) | SF | 11,400 | $2.50 | $6.00 | $3.59 | $3.00 | $6.25 | $4.00 |
| 25 | Field painting structural steel, intermediate coat (514E00060) | SF | 11,400 | $2.50 | $4.00 | $3.59 | $4.00 | $6.00 | $4.00 |
| 26 | Field painting structural steel, finish coat (514E00066) | SF | 11,400 | $2.50 | $3.00 | $3.59 | $4.00 | $6.00 | $4.00 |
| 27 | Grinding fins, tears, slivers on existing structural steel (514E00504) | MNHR | 16 | $200.00 | $150.00 | $50.00 | $120.00 | $115.00 | $200.00 |
| 28 | Final inspection repair (514E10000) | EACH | 11 | $300.00 | $150.00 | $50.00 | $1,200.00 | $235.00 | $200.00 |
| 29 | Signing, misc.: overpass installation (630E97700) | EACH | 2 | $3,000.00 | $1,000.00 | $2,000.00 | $500.00 | $250.00 | $2,000.00 |
| 30 | Structural steel members, level UF, as per plan (513E10201) | LB | 2,767 | $40.00 | $36.50 | $36.50 | $40.86 | $33.00 | $35.00 |
| 31 | Surface preparation of existing structural steel (514E00050) | SF | 21,500 | $13.00 | $11.50 | $12.71 | $7.00 | $15.80 | $20.00 |
| 32 | Field painting of existing structural steel, prime coat (514E00056) | SF | 21,500 | $3.00 | $5.00 | $3.04 | $4.00 | $4.40 | $2.00 |
| 33 | Field painting structural steel, intermediate coat (514E00060) | SF | 21,500 | $3.00 | $4.00 | $3.04 | $4.00 | $5.45 | $2.00 |
| 34 | Field painting structural steel, finish coat (514E00066) | SF | 21,500 | $3.00 | $3.00 | $3.04 | $4.00 | $5.55 | $2.00 |
| 35 | Grinding fins, tears, slivers on existing structural steel (514E00504) | MNHR | 22 | $200.00 | $150.00 | $50.00 | $120.00 | $115.00 | $200.00 |
| 36 | Final inspection repair (514E10000) | EACH | 13 | $300.00 | $150.00 | $50.00 | $1,300.00 | $235.00 | $200.00 |
| 37 | Structural steel members, level UF, as per plan (513E10201) | LB | 331 | $50.00 | $46.82 | $46.82 | $52.79 | $43.32 | $50.00 |
| 38 | Surface preparation of existing structural steel (514E00050) | SF | 22,500 | $11.00 | $12.00 | $17.28 | $9.00 | $22.00 | $20.00 |
| 39 | Field painting of existing structural steel, prime coat (514E00056) | SF | 22,500 | $2.50 | $5.00 | $3.80 | $4.00 | $4.25 | $2.00 |
| 40 | Field painting structural steel, intermediate coat (514E00060) | SF | 22,500 | $2.50 | $3.00 | $3.80 | $5.00 | $6.25 | $2.00 |
| 41 | Field painting structural steel, finish coat (514E00066) | SF | 22,500 | $2.50 | $2.00 | $3.80 | $4.00 | $8.10 | $2.00 |
| 42 | Grinding fins, tears, slivers on existing structural steel (514E00504) | MNHR | 32 | $200.00 | $150.00 | $50.00 | $120.00 | $115.00 | $200.00 |
| 43 | Final inspection repair (514E10000) | EACH | 20 | $300.00 | $150.00 | $50.00 | $1,600.00 | $235.00 | $200.00 |
| 44 | Bearing device, rocker (516E46200) | EACH | 5 | $3,000.00 | $2,930.00 | $2,930.00 | $4,856.00 | $2,930.00 | $4,500.00 |
| 45 | Jacking and temporary support of superstructure, as per plan (516E47001) | LS | 1 | $20,000 | $15,650 | $15,650 | $30,780 | $15,650 | $20,000 |
| 46 | Patching concrete structure, as per plan (519E11101) | SF | 10 | $200.00 | $1,200.00 | $924.00 | $300.00 | $1,085.00 | $500.00 |
| 47 | Structural steel members, level UF, as per plan (513E10201) | LB | 141 | $70.00 | $65.95 | $65.95 | $75.74 | $65.95 | $70.00 |
| 48 | Surface preparation of existing structural steel (514E00050) | SF | 22,500 | $11.00 | $8.00 | $11.79 | $7.00 | $10.80 | $20.00 |
| 49 | Field painting of existing structural steel, prime coat (514E00056) | SF | 22,500 | $2.50 | $5.00 | $2.37 | $4.00 | $3.55 | $2.00 |
| 50 | Field painting structural steel, intermediate coat (514E00060) | SF | 22,500 | $2.50 | $3.00 | $2.37 | $4.00 | $4.60 | $2.00 |
| 51 | Field painting structural steel, finish coat (514E00066) | SF | 22,500 | $2.50 | $2.00 | $2.37 | $4.00 | $4.60 | $2.00 |
| 52 | Grinding fins, tears, slivers on existing structural steel (514E00504) | MNHR | 33 | $200.00 | $150.00 | $50.00 | $120.00 | $115.00 | $200.00 |
| 53 | Final inspection repair (514E10000) | EACH | 21 | $300.00 | $150.00 | $50.00 | $1,300.00 | $235.00 | $200.00 |
| 54 | Surface preparation of existing structural steel (514E00050) | SF | 29,700 | $11.00 | $10.00 | $10.45 | $7.00 | $9.00 | $16.00 |
| 55 | Field painting of existing structural steel, prime coat (514E00056) | SF | 29,700 | $2.50 | $4.00 | $2.13 | $4.00 | $3.20 | $2.00 |
| 56 | Field painting structural steel, intermediate coat (514E00060) | SF | 29,700 | $2.50 | $3.00 | $2.13 | $4.00 | $3.30 | $2.00 |
| 57 | Field painting structural steel, finish coat (514E00066) | SF | 29,700 | $2.50 | $2.00 | $2.13 | $4.00 | $3.40 | $2.00 |
| 58 | Grinding fins, tears, slivers on existing structural steel (514E00504) | MNHR | 25 | $200.00 | $150.00 | $50.00 | $120.00 | $115.00 | $200.00 |
| 59 | Final inspection repair (514E10000) | EACH | 20 | $300.00 | $150.00 | $50.00 | $1,000.00 | $235.00 | $200.00 |
| 60 | Special - structures under bridge cleaning (530E00200) | LS | 1 | $8,000.00 | $15,000 | $50,000 | $6,000.00 | $6,900.00 | $5,000.00 |
| 61 | Surface preparation of existing structural steel (514E00050) | SF | 4,690 | $30.00 | $16.00 | $30.39 | $20.00 | $41.00 | $40.00 |
| 62 | Field painting of existing structural steel, prime coat (514E00056) | SF | 4,690 | $4.25 | $8.00 | $12.02 | $10.00 | $11.70 | $12.00 |
| 63 | Field painting structural steel, intermediate coat (514E00060) | SF | 4,690 | $4.25 | $6.00 | $12.02 | $10.00 | $11.30 | $12.00 |
| 64 | Field painting structural steel, finish coat (514E00066) | SF | 4,690 | $4.25 | $4.00 | $12.02 | $10.00 | $17.25 | $12.00 |
| 65 | Grinding fins, tears, slivers on existing structural steel (514E00504) | MNHR | 9 | $200.00 | $150.00 | $50.00 | $120.00 | $115.00 | $200.00 |
| 66 | Final inspection repair (514E10000) | EACH | 4 | $300.00 | $150.00 | $50.00 | $1,600.00 | $235.00 | $400.00 |
| 67 | Signing, misc.: overpass installation (630E97700) | EACH | 1 | $3,000.00 | $1,000.00 | $2,000.00 | $500.00 | $250.00 | $2,000.00 |
| 68 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $150,000 | $55,000 | $52,000 | $40,110 | $45,000 | $80,000 |
| 69 | Maintaining traffic (614E11000) | LS | 1 | $250,000 | $325,000 | $231,258 | $620,000 | $295,000 | $380,000 |
| 70 | Field office, type C, as per plan (619E16021) | MNTH | 12 | $100.00 | $5,000.00 | $2,000.00 | $5,000.00 | $4,000.00 | $4,000.00 |
| 71 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $1,000.00 | $500.00 | $6,240.00 | $30,000 | $6,500.00 | $5,000.00 |
| 72 | Mobilization (624E10000) | LS | 1 | $250,000 | $100,000 | $11,695 | $265,000 | $180,000 | $320,000 |
| 73 | Special - city of cleveland permits (690E98400) | LS | 1 | $10,000 | $1,500.00 | $3,000.00 | $15,000 | $2,000.00 | $1,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of August 28, 2025. Compiled by Mirage Metrics.