KMX Painting Inc: ODOT bid record
KMX Painting Inc submitted 30 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 30 JAN 2025, and was the low bidder on 2 of them (7%). When it was not low, its total sat a median +33% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $3,212,381
- Latest bid
- 30 JAN 2025
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 10 | 0 | 0% |
| 2021 | 6 | 0 | 0% |
| 2022 | 5 | 1 | 20% |
| 2023 | 1 | 0 | 0% |
| 2024 | 7 | 1 | 14% |
| 2025 | 1 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| CUY | 5 | 0 | 0% |
| District 7 | 4 | 0 | 0% |
| ATH | 2 | 0 | 0% |
| District 3 | 2 | 0 | 0% |
| RIC | 1 | 0 | 0% |
| MAH | 1 | 0 | 0% |
| WIL | 1 | 0 | 0% |
| MOT | 1 | 0 | 0% |
| ATB | 1 | 0 | 0% |
| HUR | 1 | 0 | 0% |
| GEA | 1 | 0 | 0% |
| District 9 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Field painting structural steel, intermediate coat | 514E00060 | SF | 150 | 109 (73%) | $1.00 | $3.00 |
| Field painting of existing structural steel, prime coat | 514E00056 | SF | 148 | 105 (71%) | $1.00 | $2.65 |
| Field painting structural steel, finish coat | 514E00066 | SF | 111 | 77 (69%) | $1.00 | $2.52 |
| Final inspection repair | 514E10000 | EACH | 157 | 29 (18%) | $150.00 | $200.00 |
| Erosion control | 832E30000 | EACH | 27 | 27 (100%) | $1.00 | $1.00 |
| Field painting structural steel, finish coat | 514E00066 | SF | 21 | 17 (81%) | $1.00 | $2.00 |
| Field painting structural steel, finish coat | 514E00066 | SF | 21 | 17 (81%) | $1.00 | $2.00 |
| Field painting structural steel, finish coat, as per plan | 514E00067 | SF | 18 | 11 (61%) | $2.00 | $4.50 |
| Portable changeable message sign, as per plan | 614E18601 | SNMT | 19 | 6 (32%) | $1,000.00 | $950.00 |
| Structural steel, misc.: repair of damaged main or | 513E95000 | FT | 14 | 4 (29%) | $200.00 | $294.50 |
| Water | 659E35000 | MGAL | 7 | 4 (57%) | $1.00 | $1.00 |
| Law enforcement officer with patrol car for assistance | 614E11110 | HR | 18 | 3 (17%) | $55.00 | $80.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Elite Contractors Inc | 27 | 14 of 27 |
| Apbn Inc | 23 | 15 of 23 |
| Panther Industrial Painting LLC | 23 | 15 of 23 |
| 360 Construction Company Inc | 19 | 12 of 19 |
| Legend Painting Inc | 18 | 9 of 18 |
| Corrosion Resistance LTD | 14 | 4 of 14 |
| Euro Paint LLC | 11 | 6 of 11 |
| Industrial Painting & Rigging Inc | 10 | 9 of 10 |
| Atsalis Brothers Painting Co | 8 | 2 of 8 |
| Spartan Contracting LLC | 5 | 0 of 5 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 30 JAN 2025 | 250042 | BUT | BUT-/HAM BP FY2025 (BRIDGE REPAIR) | 2 of 4 | $994,554 | +8.0% |
| 05 DEC 2024 | 240559 | MIA | MIA-SR 55-04.89 (BRIDGE PAINTING) | 3 of 7 | $543,323 | +14% |
| 14 NOV 2024 | 240518 | District 1 | D01-BP FY25 (BRIDGE PAINTING) | 7 of 9 | $2,432,322 | +37% |
| 17 OCT 2024 | 240466 | HAM | HAM-IR 74-08.38/09.11 (BRIDGE REPAIR) | 4 of 7 | $4,962,262 | +67% |
| 23 MAY 2024 | 240303 | District 6 | D06-BP-FY24 (BRIDGE PAINTING) | 3 of 6 | $2,872,831 | +11% |
| 23 MAY 2024 | 240305 | LAK | LAK-SR 44-02.07/VAR Paint (BRIDGE PAINTING) | 6 of 6 | $2,733,200 | +46% |
| 08 FEB 2024 | 240085 | District 7 | D07-BP/BH FY24 (BRIDGE PAINTING) | 3 of 7 | $5,858,844 | +6.0% |
| 25 JAN 2024 | 240046 | CLE | CLE-/CLI BP VAR 2024 (BRIDGE PAINTING) | 1 of 8 | $2,487,892 | Low, 6.0% under the second |
| 27 JUL 2023 | 230397 | CUY | CUY-IR 71-04.67/VAR Paint (BRIDGE PAINTING) | 7 of 7 | $3,883,880 | +33% |
| 15 SEP 2022 | 220501 | District 5 | D05-BP FY 2023 (BRIDGE PAINTING) | 5 of 5 | $2,285,170 | +72% |
| 10 MAR 2022 | 220132 | CUY | CUY-US 422-13.90/VAR Paint (BRIDGE PAINTING) | 6 of 7 | $2,486,881 | +40% |
| 17 FEB 2022 | 220079 | BEL | BEL-IR 470-01.26 (BRIDGE PAINTING) | 1 of 7 | $724,489 | Low, 9.0% under the second |
| 13 JAN 2022 | 220010 | GEA | GEA-US 422-01.70/VAR Paint (BRIDGE PAINTING) | 8 of 10 | $3,386,804 | +56% |
| 13 JAN 2022 | 220032 | District 9 | D09-BH-FY2022 (B) (BRIDGE PAINTING) | 7 of 8 | $1,449,599 | +66% |
| 02 DEC 2021 | 210645 | District 7 | D07-BP FY22 (BRIDGE PAINTING) | 4 of 7 | $1,808,558 | +34% |
| 18 NOV 2021 | 210620 | District 3 | D03-BP-ERI Paint (BRIDGE PAINTING) | 5 of 6 | $4,484,710 | +33% |
| 18 NOV 2021 | 210621 | District 3 | D03-BP FY2022 (BRIDGE PAINTING) | 4 of 6 | $2,283,652 | +61% |
| 28 OCT 2021 | 210562 | ATB | ATB-BP FY2022 (BRIDGE PAINTING) | 2 of 2 | $4,988,512 | +59% |
| 28 OCT 2021 | 210588 | HUR | HUR-US 20-BP FY2022 (BRIDGE PAINTING) | 4 of 10 | $3,885,747 | +20% |
| 25 FEB 2021 | 210150 | MOT | MOT-BH/BP-FY21 (BRIDGE PAINTING) | 4 of 10 | $3,870,456 | +21% |
| 19 NOV 2020 | 200536 | ATH | ATH-US 50-09.45 (BRIDGE PAINTING) | 6 of 8 | $1,972,973 | +16% |
| 05 NOV 2020 | 200531 | WIL | WIL-SR 2-11.82 Bridge Paint (BRIDGE PAINTING) | 3 of 6 | $245,641 | +1.0% |
| 30 JUL 2020 | 200412 | MAH | MAH-Poland Cemetery Bridge (BRIDGE PAINTING) | 3 of 5 | $238,850 | +39% |
| 26 MAR 2020 | 200163 | CUY | CUY-IR 90-09.70 L&R Paint (BRIDGE PAINTING) | 2 of 10 | $3,089,300 | +11% |
| 26 MAR 2020 | 200166 | District 7 | D07-BP-FY20 (A) (BRIDGE PAINTING) | 2 of 7 | $988,878 | +9.0% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.