ODOT letting results, September 15, 2022
16 contracts let by Ohio DOT on September 15, 2022, $34,470,122 in low bids, a median of 3 bidders per contract. On the 16 with an engineer's estimate, the low bid came in under it 9 times; median low bid -4.0% against the estimate.
- Owner
- Ohio DOT
- Contracts
- 16
- Low bids, total
- $34,470,122
- Data through
- 12 NOV 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 220502 | LIC-/FAI-IR 70-00.00/00.00 (FOUR LANE RESURFACING) | LIC | 2 | Kokosing Construction Company Inc | $10,325,055 | $10,750,015 | +4.0% | +2.0% | ODOT |
| 220503 | GRE-US 35-20.94 (FOUR LANE RESURFACING) | GRE | 1 | John R Jurgensen Company | $4,964,408 | +16% | ODOT | ||
| 224024 | GEA-US 322-01.64/VAR (CULVERT REPLACEMENT) | GEA | 2 | Jet Excavating Company | $3,817,560 | $4,553,813 | +19% | +28% | ODOT |
| 220497 | ATB-IR 90-19.56 (FOUR LANE RESURFACING) | ATB | 4 | Ronyak Paving Inc | $3,076,636 | $3,115,557 | +1.0% | +9.0% | ODOT |
| 220499 | BRO-/HIG-SR 32-08.15/00.00 (MICROSURFACING) | BRO | 2 | Strawser Construction Inc | $2,739,773 | $2,993,135 | +9.0% | +6.0% | ODOT |
| 220498 | BEL-SR 7-18.30 (CULVERT REPLACEMENT) | BEL | 2 | Municipal and Contractors Sealing Products, Inc | $1,899,866 | $2,467,159 | +30% | -28% | ODOT |
| 220496 | ADA-SR 770-00.00 PV (TWO LANE RESURFACING) | ADA | 3 | Brown County Asphalt Inc | $1,674,737 | $1,872,176 | +12% | -13% | ODOT |
| 220501 | D05-BP FY 2023 (BRIDGE PAINTING) | District 5 | 5 | Panther Industrial Painting LLC | $1,327,190 | $1,534,560 | +16% | -8.0% | ODOT |
| 220500 | CLI-SR 350-04.20 (TWO LANE RESURFACING) | CLI | 2 | John R Jurgensen Company | $835,981 | $994,119 | +19% | +3.0% | ODOT |
| 220508 | WAS-Marietta Signals/Fiber Ph. 2 (SIGNALIZATION) | WAS | 3 | Perram Electric Inc | $777,500 | $854,678 | +10% | -18% | ODOT |
| 220509 | D04-GR FY2023 (Systematic) (GUARDRAIL REBUILDING) | District 4 | 2 | Lake Erie Construction Company | $715,780 | $810,462 | +13% | +10% | ODOT |
| 220511 | HAS-SR 646-06.33 (MINOR RECONSTRUCTION) | HAS | 4 | Tucson Inc | $683,729 | $695,406 | +2.0% | -4.0% | ODOT |
| 220506 | MAR-SR 423-02.14 (CULVERT REPLACEMENT) | MAR | 8 | Great Lakes Demolition Company | $556,408 | $694,274 | +25% | -19% | ODOT |
| 220510 | D09-PR-FY2023 (PRUNING/OR TREE/BRUSH REMOVAL) | District 9 | 4 | A-1 Tree Care, Inc | $389,958 | $410,750 | +5.0% | -27% | ODOT |
| 220505 | MAH-TSG FY2022 (SIGNALIZATION) | MAH | 5 | Cornerstone Electric Inc | $358,893 | $379,100 | +6.0% | -13% | ODOT |
| 220504 | HOL-SR 241-08.92 (SIDEWALK) | HOL | 3 | Smith Paving & Excavating Inc | $326,648 | $494,180 | +51% | -4.0% | ODOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out.