Jet Excavating Company: ODOT bid record

Jet Excavating Company submitted 16 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 15 SEP 2022, and was the low bidder on 4 of them (25%). When it was not low, its total sat a median +27% above the low bid.

Owner
Ohio DOT
Low bid volume
$5,555,822
Latest bid
15 SEP 2022
Data through
12 NOV 2026
16Bids
4Low bids
25Win rate, percent
+27%Median gap to the low bid when not low, 12 bids

By year

YearBidsLow bidsWin rate
20206233%
2021600%
20224250%
Jet Excavating Company, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
GEA7229%
TRU400%
JEF11100%
District 4100%
ATB100%
STA100%
TUS11100%
Jet Excavating Company, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH1515 (100%)$1.00$1.00
Water659E35000MGAL1413 (93%)$1.00$1.00
Subgrade compaction204E10000SY147 (50%)$2.00$3.00
Repair seeding and mulching659E14000SY136 (46%)$1.00$1.25
Tack coat407E10000GAL106 (60%)$3.25$3.25
Seeding and mulching659E10000SY96 (67%)$1.50$2.60
Class QC1 concrete, footing511E46510CY95 (56%)$875.00$690.00
Proof rolling204E45000HR65 (83%)$50.00$219.05
Object marker, two way614E13360EACH65 (83%)$15.00$21.00
Traffic compacted surface, type A or B410E12000CY65 (83%)$45.00$79.08
Epoxy coated steel reinforcement509E10000LB55 (100%)$2.00$2.00
Class QC1 concrete, retaining/wingwall not including footing, as per plan511E46011CY55 (100%)$2,500.00$1,900.00
Jet Excavating Company, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Eclipse Co LLC126 of 12
Bog Construction Inc75 of 7
Lockhart Concrete Co41 of 4
Catts Construction Inc33 of 3
Shelly & Sands Inc32 of 3
Marucci & Gaffney Excavating Co31 of 3
Shook Company LLC32 of 3
Americon Industrial Services LLC22 of 2
Nerone & Sons Inc20 of 2
Rudzik Excavating Inc21 of 2
Jet Excavating Company, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
15 SEP 2022224024GEAGEA-US 322-01.64/VAR (CULVERT REPLACEMENT)1 of 2$3,817,560Low, 19% under the second
17 FEB 2022224010TUSTUS-SR 212-10.80 (CULVERT REPLACEMENT)1 of 5$607,952Low, 1.0% under the second
27 JAN 2022224005GEAGEA-SR 528-15.26 Replace (CULVERT REPLACEMENT)2 of 3$592,637+9.0%
13 JAN 2022223001TRUTRU-SR 46-25.07 (BRIDGE REPAIR)3 of 5$925,890+8.0%
16 DEC 2021214023TRUTRU-SR 5-06.41/06.63 (SLIDE REPAIR)3 of 3$647,732+11%
18 NOV 2021214018GEAGEA-US 322-04.36 Culvert (CULVERT REPLACEMENT)2 of 4$413,964+13%
29 APR 2021214012STASTA-/POR Culverts FY2021 (CULVERT REPLACEMENT)4 of 4$806,952+27%
15 APR 2021214009GEAGEA-US 422-14.90 Culvert (CULVERT REPLACEMENT)3 of 3$554,908+31%
11 FEB 2021210100TRUTRU-Warner Rd Bridge (BRIDGE REPLACEMENT (1 BRIDGE))6 of 7$1,584,731+35%
14 JAN 2021210018GEAGEA-SR 166-01.08 (CULVERT REPLACEMENT)7 of 11$239,571+27%
30 JUL 2020204013GEAGEA-SR 608-07.10 (BRIDGE REPAIR)1 of 2$675,853Low, 18% under the second
23 APR 2020200244TRUTRU-Myron St Bridge (BRIDGE REPAIR)2 of 4$498,894+7.0%
26 MAR 2020200184ATBATB-Culverts FY2020 (CULVERT REPLACEMENT)7 of 8$472,767+55%
27 FEB 2020204006District 4D04-BH FY2020 (East) (BRIDGE REPAIR)4 of 4$1,291,869+71%
23 JAN 2020200040GEAGEA-SR 168-04.10 Culvert (CULVERT REPLACEMENT)8 of 12$272,747+29%
23 JAN 2020204001JEFJEF-SR 151-15.24 (CULVERT REPLACEMENT)1 of 6$454,457Low, -19% under the second
Jet Excavating Company: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy