Shook Company LLC: ODOT bid record
Shook Company LLC submitted 26 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 12 NOV 2026, and was the low bidder on 9 of them (35%). When it was not low, its total sat a median +11% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $9,902,786
- Latest bid
- 12 NOV 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 5 | 0 | 0% |
| 2021 | 6 | 1 | 17% |
| 2023 | 2 | 2 | 100% |
| 2024 | 3 | 2 | 67% |
| 2025 | 7 | 3 | 43% |
| 2026 | 3 | 1 | 33% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| TRU | 5 | 3 | 60% |
| CUY | 4 | 3 | 75% |
| District 4 | 3 | 0 | 0% |
| GEA | 3 | 1 | 33% |
| CAR | 2 | 1 | 50% |
| LAK | 2 | 1 | 50% |
| JEF | 1 | 0 | 0% |
| MED | 1 | 0 | 0% |
| District 12 | 1 | 0 | 0% |
| MAH | 1 | 0 | 0% |
| STA | 1 | 0 | 0% |
| GAL | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 23 | 23 (100%) | $1.00 | $1.00 |
| Patching concrete bridge deck - type C | 519E12304 | SY | 21 | 21 (100%) | $200.00 | $700.00 |
| Water | 659E35000 | MGAL | 19 | 18 (95%) | $1.00 | $1.00 |
| Soil analysis test | 659E00100 | EACH | 14 | 13 (93%) | $50.00 | $115.50 |
| Commercial fertilizer | 659E20000 | TON | 19 | 12 (63%) | $650.00 | $850.00 |
| Repair seeding and mulching | 659E14000 | SY | 14 | 10 (71%) | $0.40 | $1.25 |
| Topsoil | 659E00300 | CY | 18 | 9 (50%) | $50.00 | $45.00 |
| Subgrade compaction | 204E10000 | SY | 14 | 9 (64%) | $2.00 | $3.00 |
| Excavation | 203E10000 | CY | 20 | 8 (40%) | $35.00 | $27.00 |
| Guardrail removed | 202E38000 | FT | 16 | 8 (50%) | $2.50 | $2.50 |
| Seeding and mulching | 659E10000 | SY | 11 | 8 (73%) | $2.00 | $2.60 |
| Inter-seeding | 659E15000 | SY | 8 | 8 (100%) | $0.25 | $1.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Eclipse Co LLC | 6 | 4 of 6 |
| Bog Construction Inc | 6 | 3 of 6 |
| Black Horse Bridge Construction Inc | 6 | 1 of 6 |
| Madex Construction Co | 6 | 1 of 6 |
| Jet Excavating Company | 3 | 1 of 3 |
| R C Construction Company and Son Inc | 3 | 0 of 3 |
| BCC Ohio Inc | 3 | 2 of 3 |
| B & G Trucking & Construction Inc | 2 | 2 of 2 |
| Rietschlin Construction Inc | 2 | 1 of 2 |
| Buds Inc | 2 | 1 of 2 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 NOV 2026 | 264030 | CUY | CUY-SR 43-04.80 Replace (BRIDGE REPLACEMENT (1 BRIDGE)) | 2 of 4 | $1,888,889 | +26% |
| 15 JAN 2026 | 264000 | COL | COL-SR 644-07.96 (MISCELLANEOUS) | 3 of 4 | $896,700 | +35% |
| 15 JAN 2026 | 264001 | CUY | CUY-SR 82-00.93 (CULVERT REPLACEMENT) | 1 of 5 | $678,678 | Low, -4.0% under the second |
| 04 DEC 2025 | 254030 | GEA | GEA-US 322-05.76 Slope (SLIDE REPAIR) | 2 of 3 | $1,000,000 | 0.0% |
| 09 OCT 2025 | 254027 | CUY | CUY-IR 480-21.61 Ramp Slope (SLIDE REPAIR) | 1 of 2 | $752,957 | Low, 10% under the second |
| 28 AUG 2025 | 254022 | LAK | LAK-SR 283-04.58 Replace (BRIDGE REPLACEMENT (1 BRIDGE)) | 1 of 2 | $1,749,725 | Low, 2.0% under the second |
| 10 APR 2025 | 250208 | TRU | TRU-N River Rd Parking Lot (PARKING AREAS) | 1 of 3 | $204,204 | Low, 7.0% under the second |
| 27 MAR 2025 | 254012 | GEA | GEA-SR 528-10.71/14.87 (CULVERT REPLACEMENT) | 3 of 4 | $681,654 | +8.0% |
| 27 FEB 2025 | 254009 | LAK | LAK-SR 84-30.86 Replace (CULVERT REPLACEMENT) | 3 of 4 | $647,000 | +11% |
| 30 JAN 2025 | 254004 | GAL | GAL-SR 218-05.76 (BRIDGE REPAIR) | 2 of 3 | $644,427 | +33% |
| 31 OCT 2024 | 244023 | TRU | TRU-SR 46-11.20 (BRIDGE REPAIR) | 3 of 4 | $933,333 | +20% |
| 11 JAN 2024 | 244001 | CUY | CUY-US 422-09.59 Culvert (CULVERT REPLACEMENT) | 1 of 4 | $1,055,630 | Low, -25% under the second |
| 11 JAN 2024 | 244002 | GEA | GEA-/LAK CU FY2023 (CULVERT REPLACEMENT) | 1 of 1 | $3,596,245 | Low |
| 26 OCT 2023 | 234024 | TRU | TRU-SR 5-11.95 Slide (SLIDE REPAIR) | 1 of 2 | $520,000 | Low, 7.0% under the second |
| 26 OCT 2023 | 234025 | TRU | TRU-SR 7-19.98 (BRIDGE REPAIR) | 1 of 1 | $998,000 | Low |
| 16 DEC 2021 | 214023 | TRU | TRU-SR 5-06.41/06.63 (SLIDE REPAIR) | 2 of 3 | $614,416 | +5.0% |
| 30 SEP 2021 | 214016 | CAR | CAR-SR 542-04.20/04.28 (CULVERT REPLACEMENT) | 1 of 4 | $347,347 | Low, 9.0% under the second |
| 26 AUG 2021 | 214015 | STA | STA-BH FY2022 (BRIDGE REPAIR) | 3 of 4 | $819,000 | +2.0% |
| 12 AUG 2021 | 210468 | District 4 | D04-GR FY2022 (Systematic) (GUARDRAIL REBUILDING) | 2 of 4 | $998,915 | +5.0% |
| 11 MAR 2021 | 214008 | MAH | MAH-SR 164-00.88/02.84 (CULVERT REPLACEMENT) | 2 of 2 | $1,000,000 | +31% |
| 25 FEB 2021 | 210148 | District 12 | D12-MOW FY2021 (MOWING) | 2 of 3 | $872,010 | +19% |
| 17 DEC 2020 | 200592 | District 4 | D04-GR FY2021 (Systematic) (GUARDRAIL REBUILDING) | 2 of 3 | $855,556 | +3.0% |
| 19 NOV 2020 | 204024 | CAR | CAR-SR 542-12.62 (BRIDGE REPLACEMENT (1 BRIDGE)) | 2 of 8 | $629,200 | +7.0% |
| 27 AUG 2020 | 204018 | MED | MED-SR 162-25.43 (BRIDGE REPLACEMENT (1 BRIDGE)) | 4 of 4 | $864,444 | +21% |
| 27 FEB 2020 | 204006 | District 4 | D04-BH FY2020 (East) (BRIDGE REPAIR) | 2 of 4 | $879,999 | +16% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.