ODOT contract 264001 bid tabulation
CUY-SR 82-00.93 (CULVERT REPLACEMENT). Let by Ohio DOT on January 15, 2026, CUY. 5 bids received; low bid $678,678 by Shook Company LLC, +19% against the engineer's estimate of $570,000.
- Owner
- Ohio DOT
- Letting
- 15 JAN 2026
- Pay items
- 29
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Shook Company LLC | $678,678 | Low | +19% |
| 2 | Geotech Services Inc | $649,539 | -4.0% | +14% |
| 3 | Black Horse Bridge Construction Inc | $682,628 | +1.0% | +20% |
| 4 | Daniel R Schmoldt Enterprises Inc | $729,143 | +7.0% | +28% |
| 5 | Madex Construction Co | $799,317 | +18% | +40% |
Engineer's estimate: $570,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Shook Company LLC | 2. Geotech Services Inc | 3. Black Horse Bridge Construction Inc | 4. Daniel R Schmoldt Enterprises Inc | 5. Madex Construction Co |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $5,000.00 | $8,850.00 | $14,700 | $5,000.00 | $20,693 |
| 2 | Removal misc.: concrete riprap (202E98300) | SY | 21 | $100.00 | $515.00 | $24.00 | $85.00 | $96.13 |
| 3 | Excavation (203E10000) | CY | 130 | $35.00 | $125.00 | $42.00 | $50.00 | $73.16 |
| 4 | Embankment (203E20000) | CY | 91 | $50.00 | $112.00 | $30.00 | $60.00 | $99.70 |
| 5 | Riprap, type D (601E11000) | SY | 36 | $200.00 | $405.00 | $440.00 | $145.00 | $593.68 |
| 6 | Articulating concrete block revetment system, type 1 (601E23000) | SY | 13 | $1,500.00 | $2,000.00 | $1,620.00 | $300.00 | $1,643.98 |
| 7 | Rock channel protection, type A with aggregate filter (601E32010) | CY | 120 | $200.00 | $260.00 | $215.00 | $220.00 | $267.93 |
| 8 | Rock channel protection, type B with filter (601E32100) | CY | 31 | $200.00 | $340.00 | $240.00 | $195.00 | $269.89 |
| 9 | Soil analysis test (659E00100) | EACH | 2 | $50.00 | $450.00 | $400.00 | $2,500.00 | $73.68 |
| 10 | Topsoil (659E00300) | CY | 275 | $50.00 | $58.00 | $54.00 | $28.00 | $62.63 |
| 11 | Seeding and mulching, class 3C (659E00540) | SY | 2,480 | $4.00 | $2.00 | $1.70 | $3.25 | $11.58 |
| 12 | Commercial fertilizer (659E20000) | TON | 0.33 | $1,000.00 | $1,700.00 | $1,400.00 | $1,600.00 | $2,315.79 |
| 13 | Lime (659E31000) | ACRE | 0.51 | $1,000.00 | $150.00 | $100.00 | $500.00 | $1,157.88 |
| 14 | Water (659E35000) | MGAL | 13 | $1.00 | $1.00 | $1.00 | $2.00 | $9.53 |
| 15 | Erosion control (832E30000) | EACH | 3,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 16 | Lane line, 6", type 1 (642E00204) | MI | 0.26 | $5,700.00 | $3,900.00 | $3,750.00 | $4,125.00 | $5,789.46 |
| 17 | Lane arrow, type 1 (642E01300) | EACH | 4 | $60.00 | $170.00 | $150.00 | $165.00 | $202.63 |
| 18 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 40 | $50.00 | $75.00 | $85.00 | $85.00 | $115.79 |
| 19 | Work zone edge line, class I, 6", 740.06, type I (614E22210) | MI | 0.26 | $12,500 | $12,000 | $11,500 | $12,650 | $15,053 |
| 20 | Work zone dotted line, class I, 6", 740.06, type I (614E24402) | FT | 249 | $1.00 | $3.00 | $3.00 | $2.75 | $6.95 |
| 21 | Work zone arrow, class I, 740.06, type I (614E30400) | EACH | 4 | $301.00 | $285.00 | $275.00 | $302.50 | $301.05 |
| 22 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $10,030 | $7,500.00 | $47,450 | $15,000 | $73,266 |
| 23 | Class QC1 concrete, misc.: beleved inlet rounding (511E53010) | CY | 3 | $5,000.00 | $4,550.00 | $4,200.00 | $475.00 | $2,458.25 |
| 24 | Liner pipe, as per plan, 120" (837E10001) | FT | 177 | $1,900.00 | $1,800.00 | $1,780.00 | $2,678.46 | $1,834.87 |
| 25 | Backfill for liner pipe, as per plan (837E21001) | FT | 176 | $700.00 | $600.00 | $780.00 | $520.67 | $650.19 |
| 26 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $30,000 | $8,600.00 | $6,000.00 | $14,297 | $15,747 |
| 27 | Maintaining traffic (614E11000) | LS | 1 | $15,000 | $7,500.00 | $7,500.00 | $7,500.00 | $16,635 |
| 28 | Construction layout stakes and surveying (623E10000) | LS | 1 | $10,000 | $2,500.00 | $10,000 | $5,000.00 | $13,579 |
| 29 | Mobilization (624E10000) | LS | 1 | $30,000 | $22,000 | $20,000 | $25,000 | $44,588 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of January 15, 2026. Compiled by Mirage Metrics.