ODOT letting results, October 31, 2024
28 contracts let by Ohio DOT on October 31, 2024, $67,446,780 in low bids, a median of 3 bidders per contract. On the 27 with an engineer's estimate, the low bid came in under it 19 times; median low bid -8.0% against the estimate.
- Owner
- Ohio DOT
- Contracts
- 28
- Low bids, total
- $67,446,780
- Data through
- 12 NOV 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 240488 | CUY-IR 480-17.87WN/17.90ES Decks (BRIDGE REPAIR) | CUY | 2 | Great Lakes Construction Co | $9,225,941 | $9,325,945 | +1.0% | +17% | ODOT |
| 240504 | SHE-IR 75-06.14 L/R (BRIDGE REPAIR) | SHE | 2 | Eagle Bridge Co | $8,267,046 | $9,431,126 | +14% | -5.0% | ODOT |
| 240484 | BUT-US 127-07.48 (TWO LANE RESURFACING) | BUT | 2 | Barrett Paving Materials Inc | $5,461,620 | $6,036,477 | +11% | -8.0% | ODOT |
| 240458 | ATH-SR 682-06.07 Roundabout | ATH | 9 | D G M Inc | $4,749,238 | $4,868,714 | +3.0% | ODOT | |
| 240501 | MRG-SR 37-00.00 and Various (TWO LANE RESURFACING) | MRG | 1 | Shelly & Sands Inc | $4,245,545 | 0.0% | ODOT | ||
| 240497 | LOR-SR 83-10.79 (BRIDGE REPAIR) | LOR | 3 | Great Lakes Construction Co | $4,161,643 | $4,303,430 | +3.0% | -2.0% | ODOT |
| 240485 | CLI-SR 134-07.53 (TWO LANE RESURFACING) | CLI | 2 | Fillmore Construction | $4,147,900 | $4,590,516 | +11% | -14% | ODOT |
| 240505 | SUM-IR 76-12.03 (SPOT PATCHING / PAVEMENT REPAIR) | SUM | 3 | Karvo Companies Inc | $3,475,000 | $3,884,872 | +12% | +17% | ODOT |
| 240499 | MOT-/CLA-IR 70-17.38/00.00 (SPOT PATCHING / PAVEMENT REPAIR) | MOT | 2 | Perk Company Inc | $3,045,902 | $4,391,407 | +44% | +16% | ODOT |
| 240491 | D06-Wrong Way Detection (SIGNALIZATION) | District 6 | 6 | Ruhlin Company | $2,748,989 | $2,757,421 | 0.0% | -12% | ODOT |
| 240487 | CRA-US 30-00.00 (FOUR LANE RESURFACING) | CRA | 4 | Smith Paving & Excavating Inc | $2,688,103 | $2,688,429 | 0.0% | -21% | ODOT |
| 240500 | MOT-SR 48/SR 835-06.49/01.48 (TWO LANE RESURFACING) | MOT | 2 | Barrett Paving Materials Inc | $2,228,866 | $2,258,291 | +1.0% | +5.0% | ODOT |
| 240489 | D02-R-WR & WR FY25 (PAVEMENT MARKING) | District 2 | 4 | Griffin Pavement Striping LLC | $1,641,209 | $1,834,820 | +12% | -32% | ODOT |
| 240483 | ATB-US 6-00.00 (TWO LANE RESURFACING) | ATB | 4 | Ronyak Paving Inc | $1,584,870 | $1,794,920 | +13% | -11% | ODOT |
| 240508 | D02-CS FY2025 Crack Seal (CRACK SEALING) | District 2 | 1 | Scodeller Construction Inc | $1,567,013 | 0.0% | ODOT | ||
| 240506 | TUS-US 39-15.45 (TWO LANE RESURFACING) | TUS | 4 | Superior Paving & Materials Inc | $1,316,371 | $1,382,204 | +5.0% | -23% | ODOT |
| 240494 | HAN-SR 37-03.32 (SPOT SAFETY) | HAN | 1 | Advanced Excavating & Demolition LLC | $1,099,154 | +3.0% | ODOT | ||
| 240507 | WYA-US 23-23.16 (TWO LANE RESURFACING) | WYA | 2 | Kokosing Construction Company Inc | $1,055,359 | $1,288,380 | +22% | -6.0% | ODOT |
| 244022 | PER-SR 13-19.64 (CULVERT REPLACEMENT) | PER | 3 | Buds Inc | $1,028,218 | $1,231,433 | +20% | +1.0% | ODOT |
| 244023 | TRU-SR 46-11.20 (BRIDGE REPAIR) | TRU | 4 | Bog Construction Inc | $778,352 | $819,738 | +5.0% | -15% | ODOT |
| 240502 | MUS-SR 146-29.36 (SLIDE REPAIR) | MUS | 8 | Cast & Baker Corporation | $689,801 | $696,760 | +1.0% | -16% | ODOT |
| 240490 | D05-PM FY2025 (C) R-WR (PAVEMENT MARKING) | District 5 | 2 | Griffin Pavement Striping LLC | $679,289 | $744,180 | +10% | -9.0% | ODOT |
| 240486 | COL-SR 172-10.80 (CULVERT REPLACEMENT) | COL | 7 | S E T Inc | $359,306 | $365,449 | +2.0% | -4.0% | ODOT |
| 244021 | HAM-US 50-33.70 (CULVERT REPLACEMENT) | HAM | 1 | BCC Ohio Inc | $334,405 | -41% | ODOT | ||
| 240498 | MEG-SR 7-05.28 (INTERSECTION) | MEG | 5 | D G M Inc | $287,873 | $290,575 | +1.0% | -1.0% | ODOT |
| 240495 | HIG-US 50/US 62-Hillsboro Safety (SPOT SAFETY) | HIG | 7 | Fillmore Construction | $247,690 | $346,758 | +40% | -10% | ODOT |
| 240503 | ROS-SR 772-08.76 (SLIDE REPAIR) | ROS | 9 | D G M Inc | $217,561 | $218,723 | +1.0% | -24% | ODOT |
| 240509 | D03-PR FY2025 (PRUNING/OR TREE/BRUSH REMOVAL) | District 3 | 5 | Russell Tree Experts | $114,516 | $115,680 | +1.0% | -12% | ODOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.