Cast & Baker Corporation: ODOT bid record

Cast & Baker Corporation submitted 52 bids on Ohio DOT contracts in the data, from 13 FEB 2020 to 23 APR 2026, and was the low bidder on 10 of them (19%). When it was not low, its total sat a median +25% above the low bid.

Owner
Ohio DOT
Low bid volume
$32,425,582
Latest bid
23 APR 2026
Data through
12 NOV 2026
52Bids
10Low bids
19Win rate, percent
+25%Median gap to the low bid when not low, 42 bids

By year

YearBidsLow bidsWin rate
20209111%
202112325%
20226233%
20234125%
202410220%
2025800%
20263133%
Cast & Baker Corporation, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
JEF13215%
BEL1218%
District 11700%
HAS6117%
LAW3267%
MUS3267%
NOB200%
MEG2150%
ATH100%
MOE11100%
GUE100%
MRG100%
Cast & Baker Corporation, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH5252 (100%)$1.00$1.00
Wearing course removed202E23500SY1916 (84%)$3.50$10.00
Water659E35000MGAL2312 (52%)$1.00$1.00
Embankment203E20000CY1711 (65%)$10.00$25.00
Curb ramp608E52000SF1611 (69%)$29.50$22.00
Aggregate drains605E31100FT289 (32%)$12.00$20.00
Law enforcement officer with patrol car for assistance614E11110HR218 (38%)$80.00$80.00
Walk removed202E30000SF178 (47%)$9.00$4.00
Work zone center line, class II, 642 paint614E21500MI277 (26%)$725.00$500.00
Non-tracking tack coat407E20000GAL266 (23%)$3.75$3.25
Aggregate base304E20000CY216 (29%)$100.00$90.00
Asphalt concrete surface course, type 1, (449), (driveways), as per plan441E70501CY96 (67%)$450.00$500.00
Cast & Baker Corporation, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Cast & Baker Corporation, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
23 APR 2026260142MEGMEG-SR 681-03.071 of 4$9,939,659Low, 1.0% under the second
09 APR 2026260190District 11D11-SP FY2026 (SPOT PATCHING / PAVEMENT REPAIR)3 of 3$1,840,552+43%
15 JAN 2026260019JEFJEF-SR 213-04.51 (SLIDE REPAIR)3 of 8$1,534,031+8.0%
18 DEC 2025250594NOBNOB-CEVSD Campus Connectivity (SIDEWALK)5 of 5$2,568,799+26%
23 OCT 2025250486BELBEL-SR 147-04.90 (TWO LANE RESURFACING)3 of 3$4,527,214+30%
23 OCT 2025250499JEFJEF-SR 7-30.92 (CULVERT REPLACEMENT)4 of 6$2,039,712+39%
24 APR 2025250236District 11D11-SP FY2025 (SPOT PATCHING / PAVEMENT REPAIR)3 of 3$300,412+21%
13 FEB 2025250090JEFJEF-SR 43-02.00 (TWO LANE RESURFACING)3 of 3$2,103,272+22%
30 JAN 2025250066BELBEL-N Sugar St Pavement Rehab (TWO LANE RESURFACING)3 of 3$461,485+20%
16 JAN 2025250017JEFJEF-SR 43-20.94 (TWO LANE RESURFACING)2 of 3$1,187,351+32%
16 JAN 2025250019MEGMEG-US 33-(07.61)(07.87) (SLIDE REPAIR)4 of 6$952,304+36%
19 DEC 2024240570BELBEL-SR 7-02.24 (TWO LANE RESURFACING)3 of 3$1,989,672+21%
05 DEC 2024240569MUSMUS-SR 376-05.09 (SLIDE REPAIR)3 of 7$586,511+9.0%
14 NOV 2024240514BELBEL-Barnesville Trail (BIKEWAYS)1 of 4$3,270,190Low, 2.0% under the second
14 NOV 2024240528JEFJEF-SR 150/VAR-03.43/VAR (TWO LANE RESURFACING)3 of 3$6,977,855+30%
31 OCT 2024240502MUSMUS-SR 146-29.36 (SLIDE REPAIR)1 of 8$689,801Low, 1.0% under the second
12 SEP 2024240415BELBEL-US 40/VAR-27.47/VAR (TWO LANE RESURFACING)3 of 3$2,896,301+10%
25 JUL 2024240376HASHAS-/JEF-US 250-30.20/00.00 (TWO LANE RESURFACING)3 of 3$1,417,032+12%
13 JUN 2024240340District 11D11-SP FY2024(B) (SPOT PATCHING / PAVEMENT REPAIR)3 of 3$1,628,820+53%
25 JAN 2024240043BELBEL-SR 647-01.62 (TWO LANE RESURFACING)2 of 3$1,818,258+13%
25 JAN 2024240062NOBNOB-SR 145/SR 147-00.38/18.41 (CULVERT REPLACEMENT)4 of 8$1,167,974+8.0%
08 NOV 2023232001LAWLAW-Chesapeake Building Demo 4 (DEMOLITION)5 of 7$367,952+38%
14 SEP 2023230443BELBEL-US 40-27.30 (CULVERT REPLACEMENT)2 of 4$963,275+18%
22 JUN 2023230379District 11D11-SP FY2024(A) (SPOT PATCHING / PAVEMENT REPAIR)2 of 2$2,809,098+26%
13 APR 2023230237JEFJEF-CR 10-02.10 (SPOT PATCHING / PAVEMENT REPAIR)1 of 3$876,588Low, 0.0% under the second
Cast & Baker Corporation: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way