ODOT contract 250594 bid tabulation
NOB-CEVSD Campus Connectivity (SIDEWALK). Let by Ohio DOT on December 18, 2025, NOB. 5 bids received; low bid $2,043,338 by Shelly & Sands Inc, -9.6% against the engineer's estimate of $2,261,000.
- Owner
- Ohio DOT
- Letting
- 18 DEC 2025
- Pay items
- 94
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Shelly & Sands Inc | $2,043,338 | Low | -10% |
| 2 | Stanley Miller Construction Company | $2,099,551 | +3.0% | -7.0% |
| 3 | Ruhlin Company | $2,138,269 | +5.0% | -5.0% |
| 4 | Alan Stone Co Inc | $2,233,531 | +9.0% | -1.0% |
| 5 | Cast & Baker Corporation | $2,568,799 | +26% | +14% |
Engineer's estimate: $2,261,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Shelly & Sands Inc | 2. Stanley Miller Construction Company | 3. Ruhlin Company | 4. Alan Stone Co Inc | 5. Cast & Baker Corporation |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $3,760.50 | $9,661.00 | $5,000.00 | $9,700.00 | $30,000 |
| 2 | Pavement removed (202E23000) | SY | 2,144 | $22.50 | $19.00 | $39.50 | $20.00 | $24.00 |
| 3 | Walk removed (202E30000) | SF | 20,538 | $1.80 | $1.00 | $3.00 | $1.50 | $1.20 |
| 4 | Steps removed (202E30200) | FT | 4 | $147.00 | $100.00 | $150.00 | $370.00 | $130.00 |
| 5 | Curb removed (202E32000) | FT | 1,168 | $6.50 | $4.00 | $7.00 | $15.00 | $8.00 |
| 6 | Pipe removed, 24" and under (202E35100) | FT | 466 | $25.00 | $10.00 | $19.00 | $15.00 | $36.00 |
| 7 | Guardrail removed (202E38000) | FT | 582 | $3.50 | $5.50 | $3.50 | $4.00 | $5.00 |
| 8 | Mailbox removed (202E53100) | EACH | 13 | $257.00 | $50.00 | $100.00 | $40.00 | $80.00 |
| 9 | Catch basin removed (202E58100) | EACH | 10 | $448.00 | $400.00 | $533.50 | $25.00 | $600.00 |
| 10 | Removal misc.: (railroad tracks) (202E98100) | EACH | 1 | $2,417.50 | $1,000.00 | $2,520.00 | $960.00 | $1,000.00 |
| 11 | Removal misc.:handrail (202E98200) | FT | 114 | $5.50 | $8.30 | $6.00 | $35.00 | $9.00 |
| 12 | Excavation (203E10000) | CY | 202 | $37.50 | $110.00 | $55.00 | $30.00 | $150.00 |
| 13 | Embankment (203E20000) | CY | 174 | $32.50 | $90.00 | $72.00 | $8.50 | $50.00 |
| 14 | Subgrade compaction (204E10000) | SY | 1,558 | $7.50 | $1.00 | $3.75 | $10.00 | $9.00 |
| 15 | Proof rolling (204E45000) | HR | 1 | $276.00 | $180.00 | $332.50 | $280.00 | $260.00 |
| 16 | Fence removed and rebuilt (607E35000) | FT | 120 | $91.50 | $87.20 | $85.00 | $100.00 | $90.00 |
| 17 | Fence, misc.:wood fence (607E98000) | FT | 65 | $6.50 | $103.00 | $60.00 | $120.00 | $63.00 |
| 18 | 4" concrete walk (608E10000) | SF | 35,164 | $6.25 | $8.26 | $9.00 | $9.50 | $10.50 |
| 19 | Concrete steps, type A (608E40000) | FT | 4 | $455.50 | $200.00 | $470.00 | $560.00 | $320.00 |
| 20 | Curb ramp (608E52000) | SF | 557 | $48.00 | $34.00 | $21.00 | $25.00 | $34.00 |
| 21 | Detectable warning (608E53020) | SF | 170 | $31.50 | $50.00 | $30.00 | $25.00 | $36.00 |
| 22 | Special - mailbox support system, single (690E98000) | EACH | 13 | $268.50 | $430.00 | $250.00 | $300.00 | $250.00 |
| 23 | Rock channel protection, type C with geotextile fabric (601E32204) | CY | 1 | $1,085.00 | $400.00 | $1,500.00 | $2,300.00 | $500.00 |
| 24 | Topsoil (659E00300) | CY | 449 | $75.00 | $50.00 | $76.00 | $40.00 | $80.00 |
| 25 | Seeding and mulching (659E10000) | SY | 4,041 | $1.50 | $3.20 | $1.20 | $2.00 | $1.30 |
| 26 | Repair seeding and mulching (659E14000) | SY | 203 | $1.00 | $1.00 | $1.20 | $6.50 | $1.30 |
| 27 | Inter-seeding (659E15000) | SY | 203 | $1.00 | $1.00 | $1.20 | $2.00 | $1.30 |
| 28 | Commercial fertilizer (659E20000) | TON | 0.57 | $850.00 | $800.00 | $1,250.00 | $660.00 | $1,300.00 |
| 29 | Lime (659E31000) | ACRE | 0.84 | $172.50 | $150.00 | $1,250.00 | $950.00 | $1,300.00 |
| 30 | Water (659E35000) | MGAL | 37 | $1.00 | $1.00 | $1.00 | $120.00 | $1.00 |
| 31 | Class QC1 concrete, headwall (511E46610) | CY | 0.67 | $4,020.51 | $1,899.00 | $10,000 | $3,100.00 | $3,300.00 |
| 32 | Concrete masonry (602E20000) | CY | 0.10 | $9,233.50 | $9,000.00 | $14,000 | $9,400.00 | $14,000 |
| 33 | 6" conduit, type B (611E00900) | FT | 106 | $22.50 | $39.00 | $94.50 | $25.00 | $90.00 |
| 34 | 12" conduit, type B (611E04400) | FT | 552 | $85.00 | $35.00 | $110.00 | $110.00 | $127.00 |
| 35 | 15" conduit, type B (611E05900) | FT | 1,142 | $100.00 | $52.00 | $150.00 | $140.00 | $155.00 |
| 36 | 24" conduit, type B (611E10400) | FT | 51 | $149.50 | $89.00 | $197.00 | $140.00 | $170.00 |
| 37 | Catch basin, no. 3 (611E98150) | EACH | 3 | $4,993.00 | $3,886.00 | $6,160.00 | $4,600.00 | $4,750.00 |
| 38 | Catch basin, no. 3A (611E98180) | EACH | 11 | $4,200.00 | $2,593.00 | $5,475.00 | $3,600.00 | $3,650.00 |
| 39 | Catch basin, no. 2-2B (611E98470) | EACH | 1 | $4,270.00 | $3,000.00 | $4,285.00 | $3,800.00 | $2,900.00 |
| 40 | Catch basin, no. 2-2C (611E98504) | EACH | 1 | $6,317.00 | $2,500.00 | $4,720.00 | $2,600.00 | $2,900.00 |
| 41 | Catch basin adjusted to grade (611E98630) | EACH | 3 | $1,122.50 | $1,100.00 | $1,350.00 | $720.00 | $600.00 |
| 42 | Manhole, no. 3 (611E99574) | EACH | 4 | $5,741.00 | $4,800.00 | $7,915.00 | $6,200.00 | $3,800.00 |
| 43 | Manhole adjusted to grade (611E99654) | EACH | 1 | $923.00 | $1,800.00 | $1,450.00 | $670.00 | $600.00 |
| 44 | Manufactured water quality structure, type 1 (895E10010) | EACH | 1 | $19,405 | $27,448 | $65,350 | $14,000 | $32,000 |
| 45 | Aggregate base (304E20000) | CY | 144 | $186.00 | $135.00 | $244.00 | $160.00 | $236.00 |
| 46 | Tack coat (407E10000) | GAL | 54.04 | $3.50 | $5.00 | $3.00 | $5.00 | $4.20 |
| 47 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 37 | $695.00 | $955.00 | $190.00 | $720.00 | $950.00 |
| 48 | 6" non-reinforced concrete pavement, class QC 1P (452E10010) | SY | 1,578 | $80.00 | $89.00 | $78.00 | $90.00 | $111.00 |
| 49 | 8" non-reinforced concrete pavement, class QC 1P (452E12010) | SY | 2,064 | $90.00 | $108.00 | $63.00 | $85.00 | $93.00 |
| 50 | Combination curb and gutter, type 3 (609E18000) | FT | 150 | $81.50 | $58.00 | $47.50 | $35.00 | $58.00 |
| 51 | Curb, type 6, as per plan (609E26001) | FT | 3,850 | $24.70 | $33.00 | $24.50 | $30.00 | $47.00 |
| 52 | Curb, type 10-B (609E33200) | FT | 119 | $41.50 | $40.00 | $78.50 | $25.00 | $55.00 |
| 53 | Connection, fused pull apart (625E00450) | EACH | 66 | $120.00 | $122.00 | $192.00 | $160.00 | $142.00 |
| 54 | Connection, unfused permanent (625E00480) | EACH | 6 | $160.00 | $166.00 | $182.00 | $150.00 | $131.00 |
| 55 | Light pole, decorative, as per plan (625E10481) | EACH | 33 | $4,175.00 | $4,638.00 | $3,810.00 | $4,000.00 | $3,570.00 |
| 56 | Light pole foundation, 24" X 6' deep (625E14000) | EACH | 33 | $1,700.00 | $1,833.00 | $1,445.00 | $1,800.00 | $1,630.00 |
| 57 | No. 6 AWG 2400 volt distribution cable (625E23302) | FT | 10,299 | $3.00 | $3.00 | $2.90 | $3.50 | $3.20 |
| 58 | No. 10 AWG pole and bracket cable (625E23400) | FT | 1,716 | $2.50 | $2.75 | $2.00 | $3.00 | $2.60 |
| 59 | Conduit, 2", 725.04 (625E25400) | FT | 84 | $29.00 | $32.00 | $26.00 | $30.00 | $25.20 |
| 60 | Conduit, 2", 725.05 (625E25402) | FT | 2,791 | $7.25 | $8.00 | $5.50 | $9.50 | $8.40 |
| 61 | Conduit, 3", 725.05 (625E25502) | FT | 26 | $24.00 | $26.50 | $10.60 | $15.00 | $13.00 |
| 62 | Conduit, jacked or drilled, 725.052, as per plan (625E25909) | FT | 133 | $93.00 | $103.00 | $45.00 | $110.00 | $100.00 |
| 63 | Luminaire, decorative, as per plan, solid-state (L (625E27551) | EACH | 33 | $1,250.00 | $1,277.00 | $1,150.00 | $2,300.00 | $2,000.00 |
| 64 | Trench, as per plan (625E29001) | FT | 2,901 | $12.00 | $13.20 | $9.00 | $9.50 | $8.40 |
| 65 | Pull box, 725.06, size 4 (625E30510) | EACH | 8 | $700.00 | $750.00 | $1,090.00 | $1,300.00 | $1,155.00 |
| 66 | Ground rod (625E32000) | EACH | 35 | $200.00 | $205.00 | $250.00 | $360.00 | $315.00 |
| 67 | Power service, as per plan (625E34001) | EACH | 3 | $4,000.00 | $4,111.00 | $9,950.00 | $8,500.00 | $7,560.00 |
| 68 | Underground warning/marking tape, as per plan (625E36011) | FT | 2,901 | $2.00 | $1.50 | $2.00 | $2.00 | $1.80 |
| 69 | Ground mounted support, no. 3 post (630E03100) | FT | 150 | $26.50 | $22.00 | $23.26 | $25.00 | $26.00 |
| 70 | Ground mounted support, no. 4 post, as per plan (630E04101) | FT | 41 | $32.50 | $27.00 | $32.51 | $35.00 | $32.00 |
| 71 | Sign post reflector (630E08600) | EACH | 11 | $59.00 | $55.00 | $82.76 | $65.00 | $58.00 |
| 72 | Sign, flat sheet (630E80100) | SF | 83 | $34.50 | $33.00 | $27.13 | $40.00 | $34.00 |
| 73 | Removal of ground mounted sign and storage (630E85000) | EACH | 18 | $53.50 | $33.00 | $16.56 | $150.00 | $53.00 |
| 74 | Removal of ground mounted major sign and reerection (630E85600) | EACH | 2 | $80.50 | $272.00 | $82.77 | $320.00 | $79.00 |
| 75 | Removal of ground mounted post support and disposal (630E86002) | EACH | 14 | $27.00 | $27.00 | $22.08 | $35.00 | $26.00 |
| 76 | Signing, misc.: solar-powered rectangular rapid FL (630E97700) | EACH | 4 | $9,670.00 | $9,666.00 | $6,750.00 | $10,000 | $9,240.00 |
| 77 | Center line (644E00300) | MI | 0.37 | $12,856 | $13,294 | $8,425.00 | $14,000 | $12,600 |
| 78 | Stop line (644E00500) | FT | 67 | $9.50 | $10.00 | $12.65 | $10.00 | $9.50 |
| 79 | Crosswalk line, 12" (644E00620) | FT | 552 | $5.00 | $4.83 | $6.90 | $5.00 | $4.60 |
| 80 | Crosswalk line, 24" (644E00630) | FT | 169 | $10.00 | $10.00 | $8.85 | $10.00 | $9.50 |
| 81 | Yield line (644E20800) | FT | 28 | $15.00 | $15.50 | $10.00 | $15.00 | $15.00 |
| 82 | Pedestal foundation (632E64020) | EACH | 4 | $2,256.50 | $888.00 | $776.75 | $2,500.00 | $2,200.00 |
| 83 | Test hole performed (632E64950) | EACH | 4 | $1,182.00 | $205.00 | $314.93 | $1,300.00 | $1,100.00 |
| 84 | Traffic compacted surface, type A or B (410E12000) | CY | 222 | $93.00 | $150.00 | $85.00 | $130.00 | $120.00 |
| 85 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $13,893 | $23,500 | $10,050 | $20,000 | $15,600 |
| 86 | Maintaining traffic (614E11000) | LS | 1 | $100,000 | $76,488 | $27,275 | $32,000 | $141,700 |
| 87 | Construction layout stakes and surveying (623E10000) | LS | 1 | $30,000 | $63,000 | $22,000 | $59,000 | $40,000 |
| 88 | Mobilization (624E10000) | LS | 1 | $84,000 | $87,946 | $92,250 | $67,000 | $100,000 |
| 100 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $13,352 | $12,000 | $11,613 | $14,000 | $13,000 |
| 101 | Storm water pollution prevention plan (832E15000) | LS | 1 | $3,116.00 | $3,333.00 | $2,500.00 | $3,400.00 | $3,000.00 |
| 102 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $13,796 | $4,070.00 | $7,350.00 | $18,000 | $11,000 |
| 103 | Erosion control (832E30000) | EACH | 60,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 104 | School speed limit sign assembly, misc.:removal (631E93250) | EACH | 2 | $806.00 | $833.00 | $420.45 | $890.00 | $800.00 |
| 105 | School speed limit sign assembly, solar-powered, as per plan (631E93241) | EACH | 2 | $11,175 | $4,722.00 | $5,935.00 | $12,000 | $11,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of December 18, 2025. Compiled by Mirage Metrics.