ODOT letting results, July 25, 2024
14 contracts let by Ohio DOT on July 25, 2024, $28,097,684 in low bids, a median of 2.5 bidders per contract. On the 14 with an engineer's estimate, the low bid came in under it 9 times; median low bid -4.0% against the estimate.
- Owner
- Ohio DOT
- Contracts
- 14
- Low bids, total
- $28,097,684
- Data through
- 12 NOV 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 240344 | FRA-IR 670-00.03 (BRIDGE REPAIR) | FRA | 2 | Shelly & Sands Inc | $12,890,933 | $14,883,866 | +15% | +21% | ODOT |
| 240379 | OTT-SR 163-30.94 Resurf (TWO LANE RESURFACING) | OTT | 2 | Gerken Paving Inc | $6,373,454 | $6,946,742 | +9.0% | -5.0% | ODOT |
| 240381 | STA-SR 172-03.94 (FOUR LANE RESURFACING) | STA | 4 | Northstar Asphalt Inc | $1,569,806 | $1,570,634 | 0.0% | -1.0% | ODOT |
| 240376 | HAS-/JEF-US 250-30.20/00.00 (TWO LANE RESURFACING) | HAS | 3 | NLS Paving, Inc | $1,265,478 | $1,396,154 | +10% | -5.0% | ODOT |
| 240384 | D02-GR FY2025 (GUARDRAIL REBUILDING) | District 2 | 1 | Lake Erie Construction Company | $1,143,275 | 0.0% | ODOT | ||
| 240383 | CUY-IR 271-08.45 Barrier (MISCELLANEOUS) | CUY | 2 | Great Lakes Construction Co | $1,063,557 | $1,282,970 | +21% | -9.0% | ODOT |
| 240378 | LAW-SR 93-00.00 (BRIDGE REPAIR) | LAW | 3 | Complete General Construction Company | $813,530 | $973,332 | +20% | -26% | ODOT |
| 240387 | D07-/CLA-ST-FY25 (SPOT PATCHING / PAVEMENT REPAIR) | District 7 | 2 | John R Jurgensen Company | $618,943 | $955,580 | +54% | +36% | ODOT |
| 240385 | D07-CS FY25 (CRACK SEALING) | District 7 | 2 | Scodeller Construction Inc | $548,958 | $684,767 | +25% | +18% | ODOT |
| 240374 | ERI-SR 4-00.45 GSM (SLIDE REPAIR) | ERI | 6 | Great Lakes Construction Co | $528,919 | $622,275 | +18% | -23% | ODOT |
| 240386 | MER-SR 707-00.68 (SPOT PATCHING / PAVEMENT REPAIR) | MER | 1 | Shelly Company | $472,346 | +10% | ODOT | ||
| 240388 | MRG-SR 376-14.59 (CULVERT REPLACEMENT) | MRG | 6 | Parker Corporation | $335,562 | $337,435 | +1.0% | -3.0% | ODOT |
| 240382 | WYA-US 23-06.63 (INTERSECTION) | WYA | 6 | Eagle Bridge Co | $280,597 | $324,088 | +15% | -12% | ODOT |
| 240373 | COS-CR 12-09.26 Buggy Lane (MINOR WIDENING) | COS | 4 | Protect-A-Cote | $192,326 | $225,514 | +17% | -19% | ODOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out.