Northstar Asphalt Inc: ODOT bid record
Northstar Asphalt Inc submitted 22 bids on Ohio DOT contracts in the data, from 04 JUN 2020 to 12 MAR 2026, and was the low bidder on 7 of them (32%). When it was not low, its total sat a median +11% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $13,923,358
- Latest bid
- 12 MAR 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 7 | 3 | 43% |
| 2021 | 5 | 1 | 20% |
| 2022 | 2 | 2 | 100% |
| 2023 | 1 | 0 | 0% |
| 2024 | 5 | 1 | 20% |
| 2025 | 1 | 0 | 0% |
| 2026 | 1 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| STA | 13 | 5 | 38% |
| TUS | 4 | 1 | 25% |
| SUM | 3 | 1 | 33% |
| CAR | 1 | 0 | 0% |
| WAY | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Ground mounted support, no. 2 post | 630E02100 | FT | 30 | 27 (90%) | $10.00 | $15.00 |
| Sign, flat sheet | 630E80100 | SF | 26 | 26 (100%) | $16.00 | $31.63 |
| Erosion control | 832E30000 | EACH | 21 | 21 (100%) | $1.00 | $1.00 |
| Work zone marking sign | 614E12460 | EACH | 20 | 18 (90%) | $57.50 | $92.00 |
| Sign, flat sheet | 630E80100 | SF | 17 | 16 (94%) | $25.00 | $24.00 |
| Removal of ground mounted sign and disposal | 630E84900 | EACH | 28 | 11 (39%) | $25.00 | $20.00 |
| Work zone center line, class III, 642 paint | 614E21550 | MI | 18 | 11 (61%) | $960.00 | $1,186.00 |
| Work zone stop line, class III, 642 paint | 614E26610 | FT | 17 | 11 (65%) | $3.25 | $3.50 |
| Center line | 646E10200 | MI | 16 | 11 (69%) | $3,542.50 | $12,144 |
| Stop line | 646E10400 | FT | 15 | 11 (73%) | $12.00 | $13.00 |
| Removal of ground mounted post support and disposal | 630E86002 | EACH | 29 | 10 (34%) | $25.00 | $23.50 |
| Water | 659E35000 | MGAL | 15 | 9 (60%) | $1.00 | $1.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Shelly Company | 21 | 11 of 21 |
| Karvo Companies Inc | 20 | 7 of 20 |
| Barbicas Construction Company Inc | 10 | 3 of 10 |
| Superior Paving & Materials Inc | 10 | 6 of 10 |
| Shelly & Sands Inc | 7 | 3 of 7 |
| Chagrin Valley Paving Inc | 7 | 2 of 7 |
| Central-Allied Enterprises Inc | 5 | 2 of 5 |
| Kenmore Construction Co Inc | 4 | 2 of 4 |
| Kokosing Construction Company Inc | 3 | 1 of 3 |
| Melway Paving Co Inc | 1 | 1 of 1 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 MAR 2026 | 260136 | STA | STA-SR 93/VAR-19.26/VAR (FOUR LANE RESURFACING) | 4 of 5 | $3,075,010 | +10% |
| 27 MAR 2025 | 250168 | TUS | TUS-New Phila Paving Phase 2 (TWO LANE RESURFACING) | 3 of 6 | $1,114,078 | +29% |
| 17 OCT 2024 | 240476 | WAY | WAY-US 30-19.469 (FOUR LANE RESURFACING) | 4 of 4 | $4,398,887 | +24% |
| 12 SEP 2024 | 240424 | TUS | TUS-SR 516-03.70 (TWO LANE RESURFACING) | 6 of 6 | $1,239,996 | +16% |
| 25 JUL 2024 | 240381 | STA | STA-SR 172-03.94 (FOUR LANE RESURFACING) | 1 of 4 | $1,569,806 | Low, 0.0% under the second |
| 09 MAY 2024 | 240282 | STA | STA-Middle Branch Trail (BIKEWAYS) | 2 of 4 | $632,807 | +4.0% |
| 21 MAR 2024 | 240186 | STA | STA-US 62/SR 183-38.97/16.33 (TWO LANE RESURFACING) | 2 of 3 | $2,199,292 | +11% |
| 09 NOV 2023 | 230550 | STA | STA-US 62/SR 93-00.93/08.82 (TWO LANE RESURFACING) | 2 of 3 | $1,654,301 | +11% |
| 03 NOV 2022 | 220590 | STA | STA-SR 44/SR 153-12.16/05.99 (TWO LANE RESURFACING) | 1 of 3 | $945,810 | Low, 18% under the second |
| 13 JAN 2022 | 210641 | STA | STA-US 30/SR 43-16.46/10.74 (FOUR LANE RESURFACING) | 1 of 3 | $3,541,224 | Low, 10% under the second |
| 16 DEC 2021 | 210667 | STA | STA-US 62/SR 153-25.32/03.00 (FOUR LANE RESURFACING) | 2 of 4 | $3,369,410 | +9.0% |
| 16 SEP 2021 | 210497 | STA | STA-SR 93/SR 236-11.71/00.00 (TWO LANE RESURFACING) | 3 of 6 | $2,083,678 | +7.0% |
| 13 MAY 2021 | 210311 | STA | STA-US 62T-00.00 (FOUR LANE RESURFACING) | 1 of 3 | $3,085,796 | Low, 3.0% under the second |
| 29 APR 2021 | 210282 | SUM | SUM-2nd St/Wooster Rd/Norton Rd (FOUR LANE RESURFACING) | 3 of 6 | $1,159,956 | +8.0% |
| 14 JAN 2021 | 210007 | CAR | CAR-SR 43-24.05 (TWO LANE RESURFACING) | 2 of 6 | $585,868 | +4.0% |
| 03 DEC 2020 | 200580 | TUS | TUS-SR 516-00.00 (TWO LANE RESURFACING) | 9 of 9 | $894,766 | +23% |
| 19 NOV 2020 | 200553 | STA | STA-SR 225-00.78 (TWO LANE RESURFACING) | 2 of 8 | $1,369,889 | +5.0% |
| 15 OCT 2020 | 200502 | STA | STA-SR 44/SR 153-08.84/VAR (TWO LANE RESURFACING) | 4 of 7 | $1,729,997 | +13% |
| 15 OCT 2020 | 200503 | TUS | TUS-US 250-00.00 (TWO LANE RESURFACING) | 1 of 4 | $2,108,917 | Low, 17% under the second |
| 02 JUL 2020 | 200380 | SUM | SUM-SR 18-04.91/07.98 (FOUR LANE RESURFACING) | 6 of 7 | $2,389,797 | +24% |
| 04 JUN 2020 | 200329 | SUM | SUM-S Van Buren/W Waterloo (FOUR LANE RESURFACING) | 1 of 7 | $539,903 | Low, 2.0% under the second |
| 04 JUN 2020 | 200339 | STA | STA-US 30/VAR - 25.84/VAR (PART 1 AND PART 2) (TWO LANE RESURFACING) | 1 of 4 | $2,131,902 | Low, 2.0% under the second |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.