ODOT contract 250168 bid tabulation
TUS-New Phila Paving Phase 2 (TWO LANE RESURFACING). Let by Ohio DOT on March 27, 2025, TUS. 6 bids received; low bid $863,049 by Superior Paving & Materials Inc, -17% against the engineer's estimate of $1,046,000.
- Owner
- Ohio DOT
- Letting
- 27 MAR 2025
- Pay items
- 57
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Superior Paving & Materials Inc | $863,049 | Low | -17% |
| 2 | Shelly Company | $982,182 | +14% | -6.0% |
| 3 | Northstar Asphalt Inc | $1,114,078 | +29% | +7.0% |
| 4 | Barbicas Construction Company Inc | $1,121,158 | +30% | +7.0% |
| 5 | Shelly & Sands Inc | $1,175,751 | +36% | +12% |
| 6 | Karvo Companies Inc | $1,188,000 | +38% | +14% |
Engineer's estimate: $1,046,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Superior Paving & Materials Inc | 2. Shelly Company | 3. Northstar Asphalt Inc | 4. Barbicas Construction Company Inc | 5. Shelly & Sands Inc | 6. Karvo Companies Inc |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $250.00 | $3,000.00 | $2,500.00 | $2,000.00 | $5,300.00 | $2,500.00 |
| 2 | Pavement removed (202E23000) | SY | 7 | $45.00 | $150.00 | $285.00 | $285.00 | $350.00 | $75.00 |
| 3 | Wearing course removed (202E23500) | SY | 919 | $4.00 | $3.00 | $8.00 | $15.00 | $20.00 | $20.00 |
| 4 | Walk removed (202E30000) | SF | 2,358 | $10.00 | $9.00 | $9.00 | $8.75 | $3.00 | $12.00 |
| 5 | Curb removed (202E32000) | FT | 540 | $15.00 | $15.00 | $22.00 | $21.45 | $20.00 | $22.00 |
| 6 | Excavation (203E10000) | CY | 23 | $220.00 | $30.00 | $60.00 | $48.40 | $115.00 | $95.00 |
| 7 | Subgrade compaction (204E10000) | SY | 141 | $2.00 | $2.00 | $5.00 | $4.75 | $8.00 | $0.30 |
| 8 | 4" concrete walk, as per plan (608E10001) | SF | 108 | $10.00 | $30.00 | $10.00 | $10.00 | $20.00 | $25.00 |
| 9 | Curb ramp, as per plan (608E52001) | SF | 2,090 | $20.00 | $26.50 | $22.00 | $22.00 | $35.50 | $18.00 |
| 10 | Combination curb and gutter, type 2 (609E12000) | FT | 506 | $36.00 | $55.00 | $65.00 | $65.00 | $65.00 | $38.00 |
| 11 | Soil analysis test (659E00100) | EACH | 2 | $125.00 | $100.00 | $200.00 | $125.00 | $160.00 | $10.00 |
| 12 | Topsoil (659E00300) | CY | 6 | $50.00 | $420.00 | $120.00 | $400.00 | $875.00 | $35.00 |
| 13 | Seeding and mulching, class 1 (659E00500) | SY | 53 | $60.00 | $6.50 | $50.00 | $10.00 | $49.00 | $1.00 |
| 14 | Repair seeding and mulching (659E14000) | SY | 3 | $24.00 | $1.00 | $12.00 | $5.00 | $11.75 | $1.00 |
| 15 | Commercial fertilizer (659E20000) | TON | 0.10 | $640.00 | $200.00 | $640.00 | $500.00 | $650.00 | $250.00 |
| 16 | Lime (659E31000) | ACRE | 0.01 | $100.00 | $500.00 | $100.00 | $150.00 | $105.00 | $155.00 |
| 17 | Water (659E35000) | MGAL | 5 | $1.00 | $10.00 | $1.00 | $2.00 | $1.05 | $1.00 |
| 18 | Erosion control (832E30000) | EACH | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 19 | Catch basin adjusted to grade (611E98630) | EACH | 10 | $1,000.00 | $975.00 | $1,500.00 | $800.00 | $1,275.00 | $2,000.00 |
| 20 | Manhole adjusted to grade (611E99654) | EACH | 10 | $200.00 | $900.00 | $1,500.00 | $650.00 | $1,275.00 | $1,800.00 |
| 21 | Low strength mortar backfill (613E41200) | CY | 2 | $300.00 | $250.00 | $300.00 | $300.00 | $250.00 | $350.00 |
| 22 | Partial depth pavement repair (asphalt concrete base), as per plan (251E01043) | CY | 165 | $290.00 | $500.00 | $280.00 | $350.00 | $475.00 | $500.00 |
| 23 | Pavement repair, as per plan (253E02001) | CY | 16 | $340.00 | $600.00 | $500.00 | $600.00 | $250.00 | $575.00 |
| 24 | Pavement planing, asphalt concrete: 1.5" (254E01000) | SY | 53,321 | $1.90 | $1.95 | $2.20 | $2.10 | $3.10 | $1.75 |
| 25 | Patching planed surface (254E01600) | SY | 2,667 | $1.50 | $1.00 | $5.00 | $2.20 | $2.80 | $0.10 |
| 26 | Full depth pavement sawing (255E20000) | FT | 34 | $15.00 | $10.00 | $10.00 | $6.00 | $18.00 | $25.00 |
| 27 | Aggregate base (304E20000) | CY | 23 | $85.00 | $35.00 | $150.00 | $100.00 | $100.00 | $165.00 |
| 28 | Non-tracking tack coat (407E20000) | GAL | 5,946 | $2.75 | $2.50 | $3.00 | $3.05 | $3.25 | $2.75 |
| 29 | Asphalt concrete surface course, type 1, (449), PG70-22M (441E70100) | CY | 2,244 | $187.00 | $162.00 | $242.00 | $237.00 | $220.00 | $240.00 |
| 30 | Asphalt concrete surface course, type 1, (449), (driveways), as per plan (441E70501) | CY | 38 | $350.00 | $575.00 | $460.00 | $600.00 | $550.00 | $555.00 |
| 31 | Valve box adjusted to grade (638E10800) | EACH | 5 | $90.00 | $500.00 | $1,250.00 | $250.00 | $975.00 | $1,000.00 |
| 32 | Ground mounted support, no. 2 post (630E02100) | FT | 78 | $29.50 | $12.50 | $30.00 | $12.50 | $30.00 | $24.22 |
| 33 | Sign post reflector (630E08600) | EACH | 8 | $50.00 | $50.00 | $50.00 | $50.00 | $51.00 | $75.60 |
| 34 | Sign, flat sheet (630E80100) | SF | 47 | $32.00 | $22.50 | $32.00 | $22.50 | $32.50 | $29.02 |
| 35 | Removal of ground mounted sign and disposal (630E84900) | EACH | 6 | $15.00 | $50.00 | $15.00 | $50.00 | $15.50 | $16.10 |
| 36 | Edge line, 4" (646E10000) | MI | 2.80 | $2,344.00 | $2,344.00 | $2,344.00 | $2,450.00 | $2,350.00 | $2,344.00 |
| 37 | Center line (646E10200) | MI | 2.60 | $4,044.00 | $4,044.00 | $4,044.00 | $4,150.00 | $4,100.00 | $4,044.00 |
| 38 | Channelizing line, 8" (646E10300) | FT | 445 | $1.56 | $1.55 | $1.60 | $2.50 | $1.60 | $1.56 |
| 39 | Stop line (646E10400) | FT | 290 | $12.50 | $12.50 | $14.00 | $15.00 | $12.75 | $12.50 |
| 40 | Crosswalk line, 12" (646E10510) | FT | 833 | $5.58 | $5.60 | $6.00 | $8.50 | $5.75 | $5.58 |
| 41 | Crosswalk line, 24", as per plan (646E10521) | FT | 320 | $12.50 | $12.50 | $14.00 | $15.00 | $12.75 | $12.50 |
| 42 | Transverse/diagonal line (646E10600) | FT | 130 | $8.55 | $8.55 | $8.60 | $15.00 | $8.75 | $8.55 |
| 43 | Handicap symbol marking (646E10900) | EACH | 2 | $125.00 | $125.00 | $125.00 | $250.00 | $130.00 | $125.00 |
| 44 | Parking lot stall marking (646E20200) | FT | 1,424 | $3.35 | $3.35 | $3.40 | $2.75 | $3.50 | $3.35 |
| 45 | Lane arrow (646E20300) | EACH | 6 | $167.00 | $167.00 | $170.00 | $175.00 | $175.00 | $167.00 |
| 46 | Two way left turn arrow (646E20370) | EACH | 5 | $235.00 | $235.00 | $240.00 | $225.00 | $240.00 | $235.00 |
| 47 | Dotted line, 4" (646E20502) | FT | 100 | $4.00 | $4.00 | $4.00 | $1.50 | $4.10 | $4.00 |
| 48 | Bike lane symbol marking (646E20600) | EACH | 37 | $197.00 | $197.00 | $200.00 | $400.00 | $205.00 | $197.00 |
| 49 | Detector loop (632E26500) | EACH | 9 | $1,750.00 | $1,550.00 | $1,550.00 | $1,400.00 | $1,600.00 | $1,550.00 |
| 50 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 24 | $90.00 | $100.00 | $80.00 | $80.00 | $85.00 | $100.00 |
| 51 | Work zone marking sign (614E12460) | EACH | 2 | $250.00 | $95.00 | $140.00 | $95.00 | $150.00 | $104.02 |
| 52 | Work zone lane line, class I, 4", 642 paint (614E20100) | MI | 0.25 | $1,000.00 | $1,000.00 | $1,000.00 | $750.00 | $1,005.00 | $1,000.00 |
| 53 | Work zone center line, class I, 642 paint (614E21100) | MI | 2.20 | $1,375.00 | $1,375.00 | $1,400.00 | $1,500.00 | $1,400.00 | $1,375.00 |
| 54 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $4,500.00 | $4,000.00 | $4,000.00 | $8,000.00 | $4,500.30 | $7,500.00 |
| 55 | Maintaining traffic (614E11000) | LS | 1 | $27,100 | $130,000 | $40,000 | $40,000 | $75,000 | $95,884 |
| 56 | Field office, type B (619E16010) | MNTH | 3 | $1,600.00 | $2,000.00 | $3,000.00 | $650.00 | $4,000.00 | $2,500.00 |
| 57 | Mobilization (624E10000) | LS | 1 | $20,000 | $20,000 | $50,000 | $75,000 | $19,540 | $68,987 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of March 27, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.