ODOT contract 250168 bid tabulation

TUS-New Phila Paving Phase 2 (TWO LANE RESURFACING). Let by Ohio DOT on March 27, 2025, TUS. 6 bids received; low bid $863,049 by Superior Paving & Materials Inc, -17% against the engineer's estimate of $1,046,000.

Owner
Ohio DOT
Letting
27 MAR 2025
Pay items
57
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Superior Paving & Materials Inc$863,049Low-17%
2Shelly Company$982,182+14%-6.0%
3Northstar Asphalt Inc$1,114,078+29%+7.0%
4Barbicas Construction Company Inc$1,121,158+30%+7.0%
5Shelly & Sands Inc$1,175,751+36%+12%
6Karvo Companies Inc$1,188,000+38%+14%
ODOT contract 250168: bids by rank

Engineer's estimate: $1,046,000.

Bid tabulation

LinePay itemUnitQuantity1. Superior Paving & Materials Inc2. Shelly Company3. Northstar Asphalt Inc4. Barbicas Construction Company Inc5. Shelly & Sands Inc6. Karvo Companies Inc
1Clearing and grubbing (201E11000)LS1$250.00$3,000.00$2,500.00$2,000.00$5,300.00$2,500.00
2Pavement removed (202E23000)SY7$45.00$150.00$285.00$285.00$350.00$75.00
3Wearing course removed (202E23500)SY919$4.00$3.00$8.00$15.00$20.00$20.00
4Walk removed (202E30000)SF2,358$10.00$9.00$9.00$8.75$3.00$12.00
5Curb removed (202E32000)FT540$15.00$15.00$22.00$21.45$20.00$22.00
6Excavation (203E10000)CY23$220.00$30.00$60.00$48.40$115.00$95.00
7Subgrade compaction (204E10000)SY141$2.00$2.00$5.00$4.75$8.00$0.30
84" concrete walk, as per plan (608E10001)SF108$10.00$30.00$10.00$10.00$20.00$25.00
9Curb ramp, as per plan (608E52001)SF2,090$20.00$26.50$22.00$22.00$35.50$18.00
10Combination curb and gutter, type 2 (609E12000)FT506$36.00$55.00$65.00$65.00$65.00$38.00
11Soil analysis test (659E00100)EACH2$125.00$100.00$200.00$125.00$160.00$10.00
12Topsoil (659E00300)CY6$50.00$420.00$120.00$400.00$875.00$35.00
13Seeding and mulching, class 1 (659E00500)SY53$60.00$6.50$50.00$10.00$49.00$1.00
14Repair seeding and mulching (659E14000)SY3$24.00$1.00$12.00$5.00$11.75$1.00
15Commercial fertilizer (659E20000)TON0.10$640.00$200.00$640.00$500.00$650.00$250.00
16Lime (659E31000)ACRE0.01$100.00$500.00$100.00$150.00$105.00$155.00
17Water (659E35000)MGAL5$1.00$10.00$1.00$2.00$1.05$1.00
18Erosion control (832E30000)EACH5,000$1.00$1.00$1.00$1.00$1.00$1.00
19Catch basin adjusted to grade (611E98630)EACH10$1,000.00$975.00$1,500.00$800.00$1,275.00$2,000.00
20Manhole adjusted to grade (611E99654)EACH10$200.00$900.00$1,500.00$650.00$1,275.00$1,800.00
21Low strength mortar backfill (613E41200)CY2$300.00$250.00$300.00$300.00$250.00$350.00
22Partial depth pavement repair (asphalt concrete base), as per plan (251E01043)CY165$290.00$500.00$280.00$350.00$475.00$500.00
23Pavement repair, as per plan (253E02001)CY16$340.00$600.00$500.00$600.00$250.00$575.00
24Pavement planing, asphalt concrete: 1.5" (254E01000)SY53,321$1.90$1.95$2.20$2.10$3.10$1.75
25Patching planed surface (254E01600)SY2,667$1.50$1.00$5.00$2.20$2.80$0.10
26Full depth pavement sawing (255E20000)FT34$15.00$10.00$10.00$6.00$18.00$25.00
27Aggregate base (304E20000)CY23$85.00$35.00$150.00$100.00$100.00$165.00
28Non-tracking tack coat (407E20000)GAL5,946$2.75$2.50$3.00$3.05$3.25$2.75
29Asphalt concrete surface course, type 1, (449), PG70-22M (441E70100)CY2,244$187.00$162.00$242.00$237.00$220.00$240.00
30Asphalt concrete surface course, type 1, (449), (driveways), as per plan (441E70501)CY38$350.00$575.00$460.00$600.00$550.00$555.00
31Valve box adjusted to grade (638E10800)EACH5$90.00$500.00$1,250.00$250.00$975.00$1,000.00
32Ground mounted support, no. 2 post (630E02100)FT78$29.50$12.50$30.00$12.50$30.00$24.22
33Sign post reflector (630E08600)EACH8$50.00$50.00$50.00$50.00$51.00$75.60
34Sign, flat sheet (630E80100)SF47$32.00$22.50$32.00$22.50$32.50$29.02
35Removal of ground mounted sign and disposal (630E84900)EACH6$15.00$50.00$15.00$50.00$15.50$16.10
36Edge line, 4" (646E10000)MI2.80$2,344.00$2,344.00$2,344.00$2,450.00$2,350.00$2,344.00
37Center line (646E10200)MI2.60$4,044.00$4,044.00$4,044.00$4,150.00$4,100.00$4,044.00
38Channelizing line, 8" (646E10300)FT445$1.56$1.55$1.60$2.50$1.60$1.56
39Stop line (646E10400)FT290$12.50$12.50$14.00$15.00$12.75$12.50
40Crosswalk line, 12" (646E10510)FT833$5.58$5.60$6.00$8.50$5.75$5.58
41Crosswalk line, 24", as per plan (646E10521)FT320$12.50$12.50$14.00$15.00$12.75$12.50
42Transverse/diagonal line (646E10600)FT130$8.55$8.55$8.60$15.00$8.75$8.55
43Handicap symbol marking (646E10900)EACH2$125.00$125.00$125.00$250.00$130.00$125.00
44Parking lot stall marking (646E20200)FT1,424$3.35$3.35$3.40$2.75$3.50$3.35
45Lane arrow (646E20300)EACH6$167.00$167.00$170.00$175.00$175.00$167.00
46Two way left turn arrow (646E20370)EACH5$235.00$235.00$240.00$225.00$240.00$235.00
47Dotted line, 4" (646E20502)FT100$4.00$4.00$4.00$1.50$4.10$4.00
48Bike lane symbol marking (646E20600)EACH37$197.00$197.00$200.00$400.00$205.00$197.00
49Detector loop (632E26500)EACH9$1,750.00$1,550.00$1,550.00$1,400.00$1,600.00$1,550.00
50Law enforcement officer with patrol car for assistance (614E11110)HR24$90.00$100.00$80.00$80.00$85.00$100.00
51Work zone marking sign (614E12460)EACH2$250.00$95.00$140.00$95.00$150.00$104.02
52Work zone lane line, class I, 4", 642 paint (614E20100)MI0.25$1,000.00$1,000.00$1,000.00$750.00$1,005.00$1,000.00
53Work zone center line, class I, 642 paint (614E21100)MI2.20$1,375.00$1,375.00$1,400.00$1,500.00$1,400.00$1,375.00
54Premium for contract performance bond and for payment bond (103E05000)LS1$4,500.00$4,000.00$4,000.00$8,000.00$4,500.30$7,500.00
55Maintaining traffic (614E11000)LS1$27,100$130,000$40,000$40,000$75,000$95,884
56Field office, type B (619E16010)MNTH3$1,600.00$2,000.00$3,000.00$650.00$4,000.00$2,500.00
57Mobilization (624E10000)LS1$20,000$20,000$50,000$75,000$19,540$68,987
ODOT contract 250168: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of March 27, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way