ODOT letting results, March 27, 2025

34 contracts let by Ohio DOT on March 27, 2025, $149,027,293 in low bids, a median of 3 bidders per contract. On the 34 with an engineer's estimate, the low bid came in under it 23 times; median low bid -11% against the estimate.

Owner
Ohio DOT
Contracts
34
Low bids, total
$149,027,293
Data through
12 NOV 2026

Contracts let that day

ContractProjectCountyBidsLow bidderLow bidSecond bidGapAgainst estimateSource
250162MEG-US 33-19.21 (MAJOR WIDENING)MEG1Kokosing Construction Company Inc$65,174,509+14%ODOT
250150UNI-US 33-09.10/11.50 (PART 1, 2, 3) (BRIDGE REPAIR)UNI4Miller Bros Const Inc$20,835,163$21,100,327+1.0%0.0%ODOT
250079HEN-US 24-00.43 CR-17D Interchng (INTERCHANGE)HEN3E S Wagner Company$12,310,624$12,346,0480.0%-23%ODOT
250161LAK-IR 90-02.93 Slope (SLIDE REPAIR)LAK2Great Lakes Crushing LTD$4,963,840$4,710,752-5.0%+54%ODOT
250170WIL-US 6/SR 49/SR 191-00.00/00.00/00.00 (TWO LANE RESURFACING)WIL1Gerken Paving Inc$4,365,970+7.0%ODOT
250159HAR-Detroit St. Reconstruction (MINOR RECONSTRUCTION)HAR2Helms and Sons Excavating$4,351,297$4,389,550+1.0%-10%ODOT
250176D08-PM/RPM-FY2025 (PAVEMENT MARKING)District 82The Aero-Mark Company LLC$3,555,000$3,966,398+12%-22%ODOT
250172D03-PM FY2025 (PAVEMENT MARKING)District 32The Aero-Mark Company LLC$3,300,000$3,628,500+10%-24%ODOT
250158HAM-US 22-04.80 (FOUR LANE RESURFACING)HAM2John R Jurgensen Company$3,240,388$3,544,089+9.0%-18%ODOT
250164PIK-SR 32-25.87 (Safety) (INTERSECTION)PIK1 of 5$2,649,897-11%ODOT
250169WAY-US 30-09.18 (FOUR LANE RESURFACING)WAY2Kokosing Construction Company Inc$2,464,130$2,590,127+5.0%-3.0%ODOT
250179D10-Pavement Marking FY2025 (PAVEMENT MARKING)District 102The Aero-Mark Company LLC$2,222,000$2,469,166+11%-20%ODOT
258000UNI-SR 37-12.24 (BRIDGE REPAIR)UNI4Shelly & Sands Inc$2,006,941$2,243,833+12%+1.0%ODOT
250178D09-PM FY2025 (B) (PAVEMENT MARKING)District 93The Aero-Mark Company LLC$1,810,000$1,998,614+10%-18%ODOT
258003GAL-CR 40-02.35 (BRIDGE REPLACEMENT (1 BRIDGE))GAL1Complete General Construction Company$1,665,091+7.0%ODOT
250177D08-R-W/R-FY25 (PAVEMENT MARKING)District 83American Roadway Logistics$1,565,570$1,569,4890.0%-8.0%ODOT
250174D05-PM FY2025 (A) Fast Dry East (PAVEMENT MARKING)District 52The Aero-Mark Company LLC$1,452,000$1,639,810+13%-23%ODOT
250166TUS-Gnadenhutten Streetscape (SIDEWALK)TUS3Stanley Miller Construction Company$1,259,126$1,269,837+1.0%+4.0%ODOT
250156FAY-SR-SR 41/VAR-22.18/VAR (TWO LANE RESURFACING)FAY4John R Jurgensen Company$1,200,367$1,286,776+7.0%-10%ODOT
250157HAM-IR 471-00.00 Type 3 ER (BRIDGE REPAIR)HAM5Legend Painting Inc$1,168,120$1,648,454+41%-48%ODOT
250181HOC-SR 664-13.03 (MINOR RECONSTRUCTION)HOC5Allard Excavation LLC$1,031,780$1,053,237+2.0%-10%ODOT
254011D07-CHIP-FY25 (A) (CHIP SEAL)District 72Axis Civil Construction LLC$984,011$1,049,323+7.0%+10%ODOT
250168TUS-New Phila Paving Phase 2 (TWO LANE RESURFACING)TUS6Superior Paving & Materials Inc$863,049$982,182+14%-17%ODOT
250155D10-Chip Seal FY 2025 South (CHIP SEAL)District 101Shelly Company$674,982-19%ODOT
250167TUS-Heritage Drive Sidewalks (SIDEWALK)TUS5Shelly Company$674,823$680,497+1.0%-2.0%ODOT
254012GEA-SR 528-10.71/14.87 (CULVERT REPLACEMENT)GEA4Bog Construction Inc$630,304$556,624-12%+6.0%ODOT
250182HAM-IR 71-08.24 Ramp T (MISCELLANEOUS)HAM6Barrett Paving Materials Inc$508,307$606,172+19%+41%ODOT
250175D08-LG LED FY25 (LIGHTING)District 86Capital Electric Line Builders Inc$440,699$669,000+52%-52%ODOT
250171D02-TSG FY2025 (SIGNALIZATION)District 25Perram Electric Inc$404,014$445,500+10%-20%ODOT
250154BUT-Maple Ave NS (RR CROSSING PROTECTION (RRP))BUT1Bansal Construction Inc$394,776+16%ODOT
250160JAC-SR 93-07.35 (CULVERT REPLACEMENT)JAC5Fillmore Construction$387,909$433,382+12%-29%ODOT
250173D03-RPM FY2025 (RAISED PAVEMENT MARKERS)District 32A & A Safety Inc$238,178$248,592+4.0%-20%ODOT
250163PER-MR 280-00.10 (Scotch Hill) (DEMOLITION)PER9Axis Civil Construction LLC$134,536$175,166+30%-35%ODOT
258002ASD-US 30-09.32L Bridge Hit (BRIDGE REPAIR)ASD5Eius Company$99,891$107,285+7.0%-50%ODOT
ODOT contracts let on March 27, 2025, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy