ODOT contract 250158 bid tabulation
HAM-US 22-04.80 (FOUR LANE RESURFACING). Let by Ohio DOT on March 27, 2025, HAM. 2 bids received; low bid $3,240,388 by John R Jurgensen Company, -18% against the engineer's estimate of $3,932,000.
- Owner
- Ohio DOT
- Letting
- 27 MAR 2025
- Pay items
- 94
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | John R Jurgensen Company | $3,240,388 | Low | -18% |
| 2 | Barrett Paving Materials Inc | $3,544,089 | +9.0% | -10% |
Engineer's estimate: $3,932,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. John R Jurgensen Company | 2. Barrett Paving Materials Inc |
|---|---|---|---|---|---|
| 1 | Walk removed (202E30000) | SF | 5,654 | $10.01 | $5.00 |
| 2 | Curb removed (202E32000) | FT | 842 | $16.28 | $6.50 |
| 3 | 5" concrete walk (608E12000) | SF | 2,322 | $11.71 | $11.00 |
| 4 | Curb ramp (608E52000) | SF | 3,399 | $22.00 | $32.00 |
| 5 | Curb, type 6 (609E26000) | FT | 261 | $37.97 | $35.00 |
| 6 | Special - consultant for concrete quality control (690E98400) | LS | 1 | $9,170.00 | $10,000 |
| 7 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 |
| 8 | 12" conduit, type B (611E04400) | FT | 95 | $355.03 | $200.00 |
| 9 | Catch basin, no. 3 (611E98150) | EACH | 2 | $4,028.73 | $6,500.00 |
| 10 | Catch basin, no. 3A (611E98180) | EACH | 3 | $2,781.86 | $4,000.00 |
| 11 | Catch basin adjusted to grade (611E98630) | EACH | 67 | $743.88 | $950.00 |
| 12 | Manhole adjusted to grade (611E99654) | EACH | 276 | $743.88 | $500.00 |
| 13 | Pavement repair (253E02000) | CY | 567.30 | $542.73 | $525.00 |
| 14 | Pavement repair, as per plan (253E02001) | CY | 67 | $903.05 | $800.00 |
| 15 | Pavement planing, asphalt concrete, 3" depth (254E01000) | SY | 82,629 | $2.66 | $3.90 |
| 16 | Non-tracking tack coat (407E20000) | GAL | 9,502 | $5.00 | $3.00 |
| 17 | Asphalt concrete surface course, 12.5 MM, type A (448) (442E20000) | CY | 3,443 | $217.19 | $258.00 |
| 18 | Asphalt concrete intermediate course, 9.5 MM, type A (448) (442E20100) | CY | 3,443 | $196.62 | $248.00 |
| 19 | Valve box adjusted to grade (638E10800) | EACH | 127 | $542.22 | $500.00 |
| 20 | Special - gas valve box adjusted to grade (611E99700) | EACH | 3 | $510.56 | $600.00 |
| 21 | RPM (621E00100) | EACH | 536 | $32.45 | $32.45 |
| 22 | Raised pavement marker removed (621E54000) | EACH | 644 | $13.11 | $10.00 |
| 23 | Ground mounted support, no. 2 post (630E02100) | FT | 48 | $23.63 | $23.63 |
| 24 | Sign support assembly, pole mounted (630E79500) | EACH | 32 | $139.63 | $139.63 |
| 25 | Sign, flat sheet (630E80100) | SF | 86.40 | $28.32 | $28.32 |
| 26 | Removal of ground mounted sign and disposal (630E84900) | EACH | 2 | $16.09 | $16.09 |
| 27 | Removal of ground mounted sign and reerection (630E85100) | EACH | 1 | $72.83 | $72.83 |
| 28 | Removal of ground mounted post support and disposal (630E86002) | EACH | 1 | $21.46 | $21.46 |
| 29 | Removal of pole mounted sign and disposal (630E87500) | EACH | 57 | $16.09 | $16.09 |
| 30 | Removal, misc.: sign flasher assembly (631E94490) | EACH | 1 | $600.00 | $600.00 |
| 31 | Lane line, 4", type 1 (642E00200) | MI | 0.15 | $13,405 | $13,405 |
| 32 | Center line, type 1 (642E00300) | MI | 0.05 | $15,235 | $15,235 |
| 33 | Channelizing line, 8", type 1 (642E00400) | FT | 129 | $1.00 | $1.00 |
| 34 | Stop line, type 1 (642E00500) | FT | 72 | $3.50 | $3.50 |
| 35 | Lane arrow, type 1 (642E01300) | EACH | 8 | $75.00 | $75.00 |
| 36 | Dotted line, 4", type 1 (642E01500) | FT | 67 | $0.90 | $0.90 |
| 37 | Edge line, 4" (644E00100) | MI | 2.28 | $2,955.00 | $2,955.00 |
| 38 | Lane line, 4" (644E00200) | MI | 2.45 | $760.00 | $760.00 |
| 39 | Center line (644E00300) | MI | 1.89 | $5,405.00 | $5,405.00 |
| 40 | Center line (644E00300) | MI | 0.61 | $3,625.00 | $3,625.00 |
| 41 | Center line (644E00300) | MI | 0.59 | $3,625.00 | $3,625.00 |
| 42 | Channelizing line, 8" (644E00400) | FT | 3,085 | $1.20 | $1.20 |
| 43 | Stop line (644E00500) | FT | 784 | $4.85 | $4.85 |
| 44 | Crosswalk line, 24" (644E00630) | FT | 5,627 | $4.60 | $4.60 |
| 45 | Transverse/diagonal line (644E00700) | FT | 1,093 | $4.60 | $4.60 |
| 46 | Transverse/diagonal line (644E00700) | FT | 3,163 | $4.60 | $4.60 |
| 47 | Island marking (644E00900) | SF | 808 | $4.45 | $4.45 |
| 48 | Parking lot stall marking (644E01200) | FT | 716 | $2.55 | $2.55 |
| 49 | Lane arrow (644E01300) | EACH | 107 | $100.00 | $100.00 |
| 50 | Word on pavement, 72" (644E01400) | EACH | 8 | $125.00 | $125.00 |
| 51 | Dotted line, 4" (644E01500) | FT | 1,455 | $1.15 | $1.15 |
| 52 | Bike lane symbol marking (644E01630) | EACH | 29 | $385.00 | $385.00 |
| 53 | Shared lane marking (644E19000) | EACH | 37 | $350.00 | $350.00 |
| 54 | Pull box, misc.: pull box adjusted to grade (625E31600) | EACH | 9 | $300.00 | $300.00 |
| 55 | Sign hanger assembly, span wire (630E79000) | EACH | 3 | $294.15 | $294.15 |
| 56 | Sign, flat sheet (630E80100) | SF | 20 | $28.32 | $28.32 |
| 57 | Removal of overhead mounted sign and reerection, as per plan (630E87101) | EACH | 1 | $555.89 | $555.89 |
| 58 | Removal of overhead mounted sign and disposal (630E87400) | EACH | 1 | $80.92 | $80.92 |
| 59 | Vehicular signal head, (LED), 4-section, 12" lens, 1-way, polycarbonate, as per plan (632E05065) | EACH | 1 | $1,175.00 | $1,175.00 |
| 60 | Vehicular signal head, (LED), 5-section, 12" lens, 1-way, polycarbonate, as per plan (632E05087) | EACH | 1 | $1,550.00 | $1,550.00 |
| 61 | Covering of vehicular signal head (632E25000) | EACH | 2 | $100.00 | $100.00 |
| 62 | Detector loop, as per plan (632E26501) | EACH | 21 | $2,100.00 | $2,100.00 |
| 63 | Loop detector tie in (632E27200) | EACH | 21 | $100.00 | $100.00 |
| 64 | Signal cable, 7 conductor, no. 14 AWG, as per plan (632E40701) | FT | 600 | $3.00 | $3.00 |
| 65 | Reuse of vehicular signal head, as per plan (632E90201) | EACH | 2 | $400.00 | $400.00 |
| 66 | Signalization, misc.:reprogram existing controller (632E90400) | EACH | 1 | $1,465.00 | $1,465.00 |
| 67 | Stop line radar detection, as per plan (809E69101) | EACH | 2 | $11,305 | $11,305 |
| 68 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 300 | $105.77 | $90.00 |
| 69 | Work zone lane line, class I, 4", 642 paint (614E20100) | MI | 7.10 | $150.00 | $150.00 |
| 70 | Work zone lane line, class III, 4", 642 paint (614E20550) | MI | 2.38 | $135.00 | $135.00 |
| 71 | Work zone center line, class I, 642 paint (614E21100) | MI | 5.12 | $500.00 | $500.00 |
| 72 | Work zone center line, class I, 642 paint (614E21100) | MI | 0.68 | $355.00 | $355.00 |
| 73 | Work zone center line, class I, 642 paint (614E21100) | MI | 0.74 | $355.00 | $355.00 |
| 74 | Work zone center line, class III, 642 paint (614E21550) | MI | 1.81 | $485.00 | $485.00 |
| 75 | Work zone center line, class III, 642 paint (614E21550) | MI | 0.66 | $340.00 | $340.00 |
| 76 | Work zone center line, class III, 642 paint (614E21550) | MI | 0.63 | $340.00 | $340.00 |
| 77 | Work zone edge line, class I, 4", 642 paint (614E22100) | MI | 2.40 | $295.00 | $295.00 |
| 78 | Work zone edge line, class III, 4", 642 paint (614E22350) | MI | 2.40 | $280.00 | $280.00 |
| 79 | Work zone channelizing line, class I, 8", 642 paint (614E23200) | FT | 7,162 | $0.35 | $0.35 |
| 80 | Work zone channelizing line, class III, 8", 642 paint (614E23680) | FT | 3,481 | $0.30 | $0.30 |
| 81 | Work zone dotted line, class I, 8", 642 paint (614E24204) | FT | 234 | $0.25 | $0.25 |
| 82 | Work zone dotted line, class III, 8", 642 paint (614E24614) | FT | 1,555 | $0.20 | $0.20 |
| 83 | Work zone crosswalk line, class I, 12", 642 paint (614E27050) | FT | 10,756 | $1.50 | $1.50 |
| 84 | Work zone crosswalk line, class I, 24", 642 paint (614E27060) | FT | 320 | $2.00 | $2.00 |
| 85 | Work zone crosswalk line, class III, 24", 642 paint (614E27260) | FT | 5,627 | $1.90 | $1.90 |
| 86 | Work zone arrow, class I, 642 paint (614E30200) | EACH | 170 | $50.00 | $50.00 |
| 87 | Work zone arrow, class III, 642 paint (614E30650) | EACH | 85 | $45.00 | $45.00 |
| 88 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $11,789 | $12,241 |
| 89 | Maintaining traffic (614E11000) | LS | 1 | $113,363 | $177,000 |
| 90 | Construction layout stakes and surveying (623E10000) | LS | 1 | $8,666.86 | $15,000 |
| 91 | Mobilization (624E10000) | LS | 1 | $150,000 | $75,000 |
| 100 | Dotted line, 4" (644E01500) | FT | 270 | $1.15 | $1.15 |
| 200 | Work zone stop line, class I, 642 paint (614E26200) | FT | 1,782 | $2.50 | $2.50 |
| 201 | Work zone stop line, class III, 642 paint (614E26610) | FT | 738 | $2.40 | $2.40 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of March 27, 2025. Compiled by Mirage Metrics.