ODOT contract 250167 bid tabulation

TUS-Heritage Drive Sidewalks (SIDEWALK). Let by Ohio DOT on March 27, 2025, TUS. 5 bids received; low bid $674,823 by Shelly Company, -2.3% against the engineer's estimate of $691,000.

Owner
Ohio DOT
Letting
27 MAR 2025
Pay items
47
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Shelly Company$674,823Low-2.0%
2Shelly & Sands Inc$680,497+1.0%-2.0%
3S.T.A.R.T., LLC$766,757+14%+11%
4Rmi Cement LLC$789,103+17%+14%
5Stanley Miller Construction Company$829,192+23%+20%
ODOT contract 250167: bids by rank

Engineer's estimate: $691,000.

Bid tabulation

LinePay itemUnitQuantity1. Shelly Company2. Shelly & Sands Inc3. S.T.A.R.T., LLC4. Rmi Cement LLC5. Stanley Miller Construction Company
1Clearing and grubbing (201E11000)LS1$20,000$5,400.00$11,233$11,000$8,750.00
2Pavement removed (202E23000)SY1,096$35.00$20.00$11.26$24.75$16.80
3Walk removed (202E30000)SF8,399$4.50$3.00$1.40$2.75$1.49
4Pipe removed, 24" and under (202E35100)FT69$15.00$54.00$36.60$16.50$18.50
5Catch basin removed (202E58100)EACH3$650.00$655.00$714.32$715.00$1,270.00
6Removal misc.:existing metal pole and foundation (202E98100)EACH1$1,750.00$420.00$839.45$1,925.00$3,277.00
7Excavation (203E10000)CY592$40.00$82.00$32.84$18.70$70.00
8Embankment (203E20000)CY17$70.00$50.00$89.94$46.20$98.00
9Subgrade compaction (204E10000)SY1,291$3.00$2.40$2.54$4.23$1.00
104" concrete walk (608E10000)SF26,928$5.70$5.50$8.26$5.55$7.40
116" concrete walk (608E13000)SF2,282$8.30$10.00$13.46$8.40$12.90
12Curb ramp (608E52000)SF1,839$21.00$32.00$33.03$16.00$29.70
13Fire hydrant removed and reset (638E10500)EACH2$2,600.00$1,340.00$3,916.60$2,860.00$5,500.00
14Valve box adjusted to grade (638E10800)EACH7$40.00$226.00$495.35$950.00$350.00
15Service box adjusted to grade (638E10900)EACH14$40.00$234.00$432.00$400.00$400.00
16Water work, misc.:water manhole adjuted to grade (638E98000)EACH1$250.00$715.00$727.12$1,500.00$1,500.00
17Special - mailbox removed and reset (690E50350)EACH16$285.00$307.00$147.86$300.00$425.00
18Topsoil (659E00300)CY109$128.00$125.00$57.67$150.00$55.00
19Seeding and mulching, class 1 (659E00500)SY973$2.00$5.70$3.02$5.50$5.00
20Repair seeding and mulching (659E14000)SY49$4.00$1.00$2.49$1.10$2.00
21Inter-seeding (659E15000)SY49$0.50$1.00$2.36$0.01$1.00
22Commercial fertilizer (659E20000)TON0.14$1,500.00$938.00$1,323.71$1,650.00$800.00
23Lime (659E31000)ACRE0.21$0.52$168.00$734.81$220.00$150.00
24Water (659E35000)MGAL6$60.00$1.00$1.67$1.10$1.00
25Erosion control (832E30000)EACH15,000$1.00$1.00$1.00$1.00$1.00
264" conduit, type C (611E00200)FT5$100.00$69.00$84.05$110.00$100.00
2712" conduit, type C (611E04600)FT36$135.00$83.00$93.51$148.50$70.00
2815" conduit, type C (611E06100)FT20$150.00$124.00$122.69$165.00$120.00
2918" conduit, type C (611E07600)FT10$175.00$127.00$205.98$192.50$200.00
30Catch basin, no. 2-2B (611E98470)EACH3$2,325.00$2,575.00$1,845.69$2,557.50$3,900.00
31Manhole, no. 3 (611E99574)EACH3$3,200.00$4,400.00$5,091.98$3,520.00$4,600.00
326" non-reinforced concrete pavement, class QC MS (452E10050)SY1,191$78.00$99.00$98.92$70.50$92.00
338" non-reinforced concrete pavement, class QC MS (452E12050)SY100$116.00$141.00$123.96$89.70$170.00
34Light pole, decorative, as per plan (625E10481)EACH3$825.00$2,700.00$2,500.00$907.50$573.00
36Ground mounted support, no. 2 post (630E02100)FT38$45.00$49.00$25.00$27.50$45.00
37Removal of ground mounted sign and reerection (630E85100)EACH3$85.00$92.00$85.00$110.00$150.00
38Removal of ground mounted post support and disposal (630E86002)EACH3$25.00$27.00$50.00$16.50$30.00
39Signing, misc.:solar powered rectangular rapid fla (630E97700)EACH2$11,300$7,560.00$8,300.00$10,780$27,656
40Crosswalk line, 12" (644E00620)FT1,062$5.75$4.70$6.00$6.32$15.62
41Yield line (644E20800)FT25$13.50$13.00$14.00$14.85$62.50
42Premium for contract performance bond and for payment bond (103E05000)LS1$10,000$3,835.00$11,600$71,737$15,000
43Maintaining traffic (614E11000)LS1$55,000$52,000$82,250$32,750$34,000
44Field office, type B (619E16010)MNTH5$1,900.00$2,900.00$3,000.00$22,600$2,000.00
45Construction layout stakes and surveying (623E10000)LS1$10,000$7,000.00$9,880.00$3,300.00$36,000
46Mobilization (624E10000)LS1$40,000$20,000$29,200$67,540$52,000
100Ground rod (625E32000)EACH2$180.00$325.00$350.00$198.00$5,000.00
101Pedestal foundation (632E64020)EACH2$1,000.00$1,620.00$1,200.00$1,100.00$3,000.00
ODOT contract 250167: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of March 27, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy