ODOT contract 250167 bid tabulation
TUS-Heritage Drive Sidewalks (SIDEWALK). Let by Ohio DOT on March 27, 2025, TUS. 5 bids received; low bid $674,823 by Shelly Company, -2.3% against the engineer's estimate of $691,000.
- Owner
- Ohio DOT
- Letting
- 27 MAR 2025
- Pay items
- 47
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Shelly Company | $674,823 | Low | -2.0% |
| 2 | Shelly & Sands Inc | $680,497 | +1.0% | -2.0% |
| 3 | S.T.A.R.T., LLC | $766,757 | +14% | +11% |
| 4 | Rmi Cement LLC | $789,103 | +17% | +14% |
| 5 | Stanley Miller Construction Company | $829,192 | +23% | +20% |
Engineer's estimate: $691,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Shelly Company | 2. Shelly & Sands Inc | 3. S.T.A.R.T., LLC | 4. Rmi Cement LLC | 5. Stanley Miller Construction Company |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $20,000 | $5,400.00 | $11,233 | $11,000 | $8,750.00 |
| 2 | Pavement removed (202E23000) | SY | 1,096 | $35.00 | $20.00 | $11.26 | $24.75 | $16.80 |
| 3 | Walk removed (202E30000) | SF | 8,399 | $4.50 | $3.00 | $1.40 | $2.75 | $1.49 |
| 4 | Pipe removed, 24" and under (202E35100) | FT | 69 | $15.00 | $54.00 | $36.60 | $16.50 | $18.50 |
| 5 | Catch basin removed (202E58100) | EACH | 3 | $650.00 | $655.00 | $714.32 | $715.00 | $1,270.00 |
| 6 | Removal misc.:existing metal pole and foundation (202E98100) | EACH | 1 | $1,750.00 | $420.00 | $839.45 | $1,925.00 | $3,277.00 |
| 7 | Excavation (203E10000) | CY | 592 | $40.00 | $82.00 | $32.84 | $18.70 | $70.00 |
| 8 | Embankment (203E20000) | CY | 17 | $70.00 | $50.00 | $89.94 | $46.20 | $98.00 |
| 9 | Subgrade compaction (204E10000) | SY | 1,291 | $3.00 | $2.40 | $2.54 | $4.23 | $1.00 |
| 10 | 4" concrete walk (608E10000) | SF | 26,928 | $5.70 | $5.50 | $8.26 | $5.55 | $7.40 |
| 11 | 6" concrete walk (608E13000) | SF | 2,282 | $8.30 | $10.00 | $13.46 | $8.40 | $12.90 |
| 12 | Curb ramp (608E52000) | SF | 1,839 | $21.00 | $32.00 | $33.03 | $16.00 | $29.70 |
| 13 | Fire hydrant removed and reset (638E10500) | EACH | 2 | $2,600.00 | $1,340.00 | $3,916.60 | $2,860.00 | $5,500.00 |
| 14 | Valve box adjusted to grade (638E10800) | EACH | 7 | $40.00 | $226.00 | $495.35 | $950.00 | $350.00 |
| 15 | Service box adjusted to grade (638E10900) | EACH | 14 | $40.00 | $234.00 | $432.00 | $400.00 | $400.00 |
| 16 | Water work, misc.:water manhole adjuted to grade (638E98000) | EACH | 1 | $250.00 | $715.00 | $727.12 | $1,500.00 | $1,500.00 |
| 17 | Special - mailbox removed and reset (690E50350) | EACH | 16 | $285.00 | $307.00 | $147.86 | $300.00 | $425.00 |
| 18 | Topsoil (659E00300) | CY | 109 | $128.00 | $125.00 | $57.67 | $150.00 | $55.00 |
| 19 | Seeding and mulching, class 1 (659E00500) | SY | 973 | $2.00 | $5.70 | $3.02 | $5.50 | $5.00 |
| 20 | Repair seeding and mulching (659E14000) | SY | 49 | $4.00 | $1.00 | $2.49 | $1.10 | $2.00 |
| 21 | Inter-seeding (659E15000) | SY | 49 | $0.50 | $1.00 | $2.36 | $0.01 | $1.00 |
| 22 | Commercial fertilizer (659E20000) | TON | 0.14 | $1,500.00 | $938.00 | $1,323.71 | $1,650.00 | $800.00 |
| 23 | Lime (659E31000) | ACRE | 0.21 | $0.52 | $168.00 | $734.81 | $220.00 | $150.00 |
| 24 | Water (659E35000) | MGAL | 6 | $60.00 | $1.00 | $1.67 | $1.10 | $1.00 |
| 25 | Erosion control (832E30000) | EACH | 15,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 26 | 4" conduit, type C (611E00200) | FT | 5 | $100.00 | $69.00 | $84.05 | $110.00 | $100.00 |
| 27 | 12" conduit, type C (611E04600) | FT | 36 | $135.00 | $83.00 | $93.51 | $148.50 | $70.00 |
| 28 | 15" conduit, type C (611E06100) | FT | 20 | $150.00 | $124.00 | $122.69 | $165.00 | $120.00 |
| 29 | 18" conduit, type C (611E07600) | FT | 10 | $175.00 | $127.00 | $205.98 | $192.50 | $200.00 |
| 30 | Catch basin, no. 2-2B (611E98470) | EACH | 3 | $2,325.00 | $2,575.00 | $1,845.69 | $2,557.50 | $3,900.00 |
| 31 | Manhole, no. 3 (611E99574) | EACH | 3 | $3,200.00 | $4,400.00 | $5,091.98 | $3,520.00 | $4,600.00 |
| 32 | 6" non-reinforced concrete pavement, class QC MS (452E10050) | SY | 1,191 | $78.00 | $99.00 | $98.92 | $70.50 | $92.00 |
| 33 | 8" non-reinforced concrete pavement, class QC MS (452E12050) | SY | 100 | $116.00 | $141.00 | $123.96 | $89.70 | $170.00 |
| 34 | Light pole, decorative, as per plan (625E10481) | EACH | 3 | $825.00 | $2,700.00 | $2,500.00 | $907.50 | $573.00 |
| 36 | Ground mounted support, no. 2 post (630E02100) | FT | 38 | $45.00 | $49.00 | $25.00 | $27.50 | $45.00 |
| 37 | Removal of ground mounted sign and reerection (630E85100) | EACH | 3 | $85.00 | $92.00 | $85.00 | $110.00 | $150.00 |
| 38 | Removal of ground mounted post support and disposal (630E86002) | EACH | 3 | $25.00 | $27.00 | $50.00 | $16.50 | $30.00 |
| 39 | Signing, misc.:solar powered rectangular rapid fla (630E97700) | EACH | 2 | $11,300 | $7,560.00 | $8,300.00 | $10,780 | $27,656 |
| 40 | Crosswalk line, 12" (644E00620) | FT | 1,062 | $5.75 | $4.70 | $6.00 | $6.32 | $15.62 |
| 41 | Yield line (644E20800) | FT | 25 | $13.50 | $13.00 | $14.00 | $14.85 | $62.50 |
| 42 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $10,000 | $3,835.00 | $11,600 | $71,737 | $15,000 |
| 43 | Maintaining traffic (614E11000) | LS | 1 | $55,000 | $52,000 | $82,250 | $32,750 | $34,000 |
| 44 | Field office, type B (619E16010) | MNTH | 5 | $1,900.00 | $2,900.00 | $3,000.00 | $22,600 | $2,000.00 |
| 45 | Construction layout stakes and surveying (623E10000) | LS | 1 | $10,000 | $7,000.00 | $9,880.00 | $3,300.00 | $36,000 |
| 46 | Mobilization (624E10000) | LS | 1 | $40,000 | $20,000 | $29,200 | $67,540 | $52,000 |
| 100 | Ground rod (625E32000) | EACH | 2 | $180.00 | $325.00 | $350.00 | $198.00 | $5,000.00 |
| 101 | Pedestal foundation (632E64020) | EACH | 2 | $1,000.00 | $1,620.00 | $1,200.00 | $1,100.00 | $3,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of March 27, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.