E S Wagner Company: ODOT bid record
E S Wagner Company submitted 23 bids on Ohio DOT contracts in the data, from 04 JUN 2020 to 12 NOV 2026, and was the low bidder on 7 of them (30%). When it was not low, its total sat a median +15% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $23,004,469
- Latest bid
- 12 NOV 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 6 | 1 | 17% |
| 2021 | 3 | 1 | 33% |
| 2022 | 2 | 0 | 0% |
| 2023 | 2 | 1 | 50% |
| 2024 | 1 | 0 | 0% |
| 2025 | 8 | 4 | 50% |
| 2026 | 1 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| WOO | 7 | 3 | 43% |
| LUC | 4 | 1 | 25% |
| HAN | 2 | 0 | 0% |
| FUL | 2 | 0 | 0% |
| WYA | 1 | 0 | 0% |
| SAN | 1 | 0 | 0% |
| MOE | 1 | 0 | 0% |
| FRA | 1 | 0 | 0% |
| DEL | 1 | 0 | 0% |
| MRW | 1 | 1 | 100% |
| DEF | 1 | 1 | 100% |
| HEN | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 23 | 23 (100%) | $1.00 | $1.00 |
| Seeding and mulching | 659E10000 | SY | 20 | 14 (70%) | $1.17 | $2.60 |
| Commercial fertilizer | 659E20000 | TON | 20 | 13 (65%) | $600.00 | $850.00 |
| Water | 659E35000 | MGAL | 19 | 12 (63%) | $1.00 | $1.00 |
| Non-tracking tack coat | 407E20000 | GAL | 17 | 12 (71%) | $2.31 | $3.25 |
| Anchor assembly, MGS type T | 606E26550 | EACH | 14 | 12 (86%) | $1,332.50 | $1,260.00 |
| Inter-seeding | 659E15000 | SY | 15 | 11 (73%) | $0.50 | $1.00 |
| Removal of ground mounted post support and disposal | 630E86002 | EACH | 13 | 9 (69%) | $20.00 | $23.50 |
| Removal of ground mounted sign and disposal | 630E84900 | EACH | 13 | 9 (69%) | $15.00 | $20.00 |
| MGS bridge terminal assembly, type 1 | 606E35002 | EACH | 11 | 9 (82%) | $2,382.18 | $2,400.00 |
| Anchor assembly removed, type E | 202E42010 | EACH | 11 | 9 (82%) | $145.00 | $165.00 |
| Embankment | 203E20000 | CY | 19 | 8 (42%) | $13.00 | $25.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Miller Bros Const Inc | 17 | 8 of 17 |
| Vernon Nagel Inc | 13 | 7 of 13 |
| Kokosing Construction Company Inc | 6 | 5 of 6 |
| Beaver Excavating Company | 5 | 2 of 5 |
| Eagle Bridge Co | 3 | 2 of 3 |
| Mosser Construction Inc | 3 | 3 of 3 |
| R G Zachrich Construction Inc | 3 | 1 of 3 |
| Complete General Construction Company | 3 | 2 of 3 |
| Great Lakes Demolition Company | 3 | 2 of 3 |
| Eclipse Co LLC | 3 | 1 of 3 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 NOV 2026 | 260459 | FUL | FUL-US 20A-19.20 Slide Repair (SLIDE REPAIR) | 3 of 5 | $1,391,388 | +10% |
| 25 SEP 2025 | 250445 | WOO | WOO-MR 746-00.05 Pemberville Brdg (BRIDGE REPLACEMENT (1 BRIDGE)) | 1 of 7 | $1,515,460 | Low, 5.0% under the second |
| 11 SEP 2025 | 250399 | WOO | WOO-SR 64/SR 65-05.78/06.18/23.39 Br Rpl (BRIDGE REPLACEMENT (3 BRIDGES)) | 2 of 3 | $3,971,389 | +8.0% |
| 14 AUG 2025 | 250378 | FUL | FUL-SR 109-16.98 Bridge Replace (BRIDGE REPLACEMENT (1 BRIDGE)) | 3 of 4 | $1,144,141 | +6.0% |
| 27 MAR 2025 | 250079 | HEN | HEN-US 24-00.43 CR-17D Interchng (INTERCHANGE) | 1 of 3 | $12,310,624 | Low, 0.0% under the second |
| 27 FEB 2025 | 250117 | DEF | DEF-US 24-11.35(Independence Rd) (INTERCHANGE) | 1 of 3 | $5,336,584 | Low, 3.0% under the second |
| 13 FEB 2025 | 258001 | MRW | MRW-SR 529-02.46 (BRIDGE REPAIR) | 1 of 5 | $167,959 | Low, 1.0% under the second |
| 30 JAN 2025 | 250050 | HAN | HAN-SR 15/CR 193 (MINOR RECONSTRUCTION) | 2 of 5 | $4,693,870 | +1.0% |
| 16 JAN 2025 | 240576 | DEL | DEL-SR 521-10.32 and Various (BRIDGE REPLACEMENT (2 BRIDGES)) | 5 of 7 | $2,956,743 | +15% |
| 01 MAR 2024 | 240080 | HAN | HAN-IR 75/CR 99-Interchange Rehab. (INTERCHANGE) | 2 of 3 | $32,564,362 | +6.0% |
| 17 NOV 2023 | 233006 | WOO | WOO-IR 75-29.93 Bridge Rehab (MINOR RECONSTRUCTION) | 2 of 3 | $8,913,331 | +24% |
| 09 NOV 2023 | 230554 | WOO | WOO-IR 475-00.39 Slide Repair (SLIDE REPAIR) | 1 of 5 | $269,228 | Low, 22% under the second |
| 12 MAY 2022 | 220256 | LUC | LUC-IR 475-01.85 @20A Interchnge (PART 1, PART 2, PART 3) (MAJOR RECONSTRUCTION) | 3 of 3 | $104,291,489 | +2.0% |
| 27 JAN 2022 | 220065 | WOO | WOO-SR 25-00.75 Reconstruction (MAJOR RECONSTRUCTION) | 5 of 6 | $25,027,167 | +15% |
| 17 JUN 2021 | 210365 | FRA | FRA-SR 315-07.13 Noise Wall Part 1&2 (NOISE WALLS) | 5 of 7 | $3,928,870 | +16% |
| 29 APR 2021 | 210274 | MOE | MOE-SR 537-03.40 (RELOCATION) | 3 of 8 | $10,471,541 | +11% |
| 25 FEB 2021 | 210141 | WOO | WOO-IR 75-13.32/15.34 Bridge Rehab. (BRIDGE REPAIR) | 1 of 3 | $2,718,810 | Low, 3.0% under the second |
| 05 NOV 2020 | 200522 | LUC | LUC-US 24-13.12 (BRIDGE REPAIR) | 4 of 5 | $2,014,339 | +17% |
| 05 NOV 2020 | 200526 | SAN | SAN-SR 19-00.24 Bridge Repl. (CULVERT REPLACEMENT) | 6 of 9 | $833,677 | +21% |
| 17 SEP 2020 | 200455 | LUC | LUC-IR 475/US 23-09.54/09.63 Noisewall (NOISE WALLS) | 6 of 6 | $8,479,716 | +28% |
| 30 JUL 2020 | 203005 | WYA | WYA-SR 199 8.85 (BRIDGE REPLACEMENT (1 BRIDGE)) | 8 of 8 | $971,010 | +28% |
| 18 JUN 2020 | 200352 | LUC | LUC-SR 2-21.23 Brdg Repair (BRIDGE REPAIR) | 1 of 3 | $685,805 | Low, 16% under the second |
| 04 JUN 2020 | 200331 | WOO | WOO-IR 75-07.07 Slide Repair (SLIDE REPAIR) | 2 of 3 | $1,083,979 | +14% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.