E S Wagner Company: ODOT bid record

E S Wagner Company submitted 23 bids on Ohio DOT contracts in the data, from 04 JUN 2020 to 12 NOV 2026, and was the low bidder on 7 of them (30%). When it was not low, its total sat a median +15% above the low bid.

Owner
Ohio DOT
Low bid volume
$23,004,469
Latest bid
12 NOV 2026
Data through
12 NOV 2026
23Bids
7Low bids
30Win rate, percent
+15%Median gap to the low bid when not low, 16 bids

By year

YearBidsLow bidsWin rate
20206117%
20213133%
2022200%
20232150%
2024100%
20258450%
2026100%
E S Wagner Company, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
WOO7343%
LUC4125%
HAN200%
FUL200%
WYA100%
SAN100%
MOE100%
FRA100%
DEL100%
MRW11100%
DEF11100%
HEN11100%
E S Wagner Company, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH2323 (100%)$1.00$1.00
Seeding and mulching659E10000SY2014 (70%)$1.17$2.60
Commercial fertilizer659E20000TON2013 (65%)$600.00$850.00
Water659E35000MGAL1912 (63%)$1.00$1.00
Non-tracking tack coat407E20000GAL1712 (71%)$2.31$3.25
Anchor assembly, MGS type T606E26550EACH1412 (86%)$1,332.50$1,260.00
Inter-seeding659E15000SY1511 (73%)$0.50$1.00
Removal of ground mounted post support and disposal630E86002EACH139 (69%)$20.00$23.50
Removal of ground mounted sign and disposal630E84900EACH139 (69%)$15.00$20.00
MGS bridge terminal assembly, type 1606E35002EACH119 (82%)$2,382.18$2,400.00
Anchor assembly removed, type E202E42010EACH119 (82%)$145.00$165.00
Embankment203E20000CY198 (42%)$13.00$25.00
E S Wagner Company, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

E S Wagner Company, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
12 NOV 2026260459FULFUL-US 20A-19.20 Slide Repair (SLIDE REPAIR)3 of 5$1,391,388+10%
25 SEP 2025250445WOOWOO-MR 746-00.05 Pemberville Brdg (BRIDGE REPLACEMENT (1 BRIDGE))1 of 7$1,515,460Low, 5.0% under the second
11 SEP 2025250399WOOWOO-SR 64/SR 65-05.78/06.18/23.39 Br Rpl (BRIDGE REPLACEMENT (3 BRIDGES))2 of 3$3,971,389+8.0%
14 AUG 2025250378FULFUL-SR 109-16.98 Bridge Replace (BRIDGE REPLACEMENT (1 BRIDGE))3 of 4$1,144,141+6.0%
27 MAR 2025250079HENHEN-US 24-00.43 CR-17D Interchng (INTERCHANGE)1 of 3$12,310,624Low, 0.0% under the second
27 FEB 2025250117DEFDEF-US 24-11.35(Independence Rd) (INTERCHANGE)1 of 3$5,336,584Low, 3.0% under the second
13 FEB 2025258001MRWMRW-SR 529-02.46 (BRIDGE REPAIR)1 of 5$167,959Low, 1.0% under the second
30 JAN 2025250050HANHAN-SR 15/CR 193 (MINOR RECONSTRUCTION)2 of 5$4,693,870+1.0%
16 JAN 2025240576DELDEL-SR 521-10.32 and Various (BRIDGE REPLACEMENT (2 BRIDGES))5 of 7$2,956,743+15%
01 MAR 2024240080HANHAN-IR 75/CR 99-Interchange Rehab. (INTERCHANGE)2 of 3$32,564,362+6.0%
17 NOV 2023233006WOOWOO-IR 75-29.93 Bridge Rehab (MINOR RECONSTRUCTION)2 of 3$8,913,331+24%
09 NOV 2023230554WOOWOO-IR 475-00.39 Slide Repair (SLIDE REPAIR)1 of 5$269,228Low, 22% under the second
12 MAY 2022220256LUCLUC-IR 475-01.85 @20A Interchnge (PART 1, PART 2, PART 3) (MAJOR RECONSTRUCTION)3 of 3$104,291,489+2.0%
27 JAN 2022220065WOOWOO-SR 25-00.75 Reconstruction (MAJOR RECONSTRUCTION)5 of 6$25,027,167+15%
17 JUN 2021210365FRAFRA-SR 315-07.13 Noise Wall Part 1&2 (NOISE WALLS)5 of 7$3,928,870+16%
29 APR 2021210274MOEMOE-SR 537-03.40 (RELOCATION)3 of 8$10,471,541+11%
25 FEB 2021210141WOOWOO-IR 75-13.32/15.34 Bridge Rehab. (BRIDGE REPAIR)1 of 3$2,718,810Low, 3.0% under the second
05 NOV 2020200522LUCLUC-US 24-13.12 (BRIDGE REPAIR)4 of 5$2,014,339+17%
05 NOV 2020200526SANSAN-SR 19-00.24 Bridge Repl. (CULVERT REPLACEMENT)6 of 9$833,677+21%
17 SEP 2020200455LUCLUC-IR 475/US 23-09.54/09.63 Noisewall (NOISE WALLS)6 of 6$8,479,716+28%
30 JUL 2020203005WYAWYA-SR 199 8.85 (BRIDGE REPLACEMENT (1 BRIDGE))8 of 8$971,010+28%
18 JUN 2020200352LUCLUC-SR 2-21.23 Brdg Repair (BRIDGE REPAIR)1 of 3$685,805Low, 16% under the second
04 JUN 2020200331WOOWOO-IR 75-07.07 Slide Repair (SLIDE REPAIR)2 of 3$1,083,979+14%
E S Wagner Company: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy