R G Zachrich Construction Inc: ODOT bid record
R G Zachrich Construction Inc submitted 23 bids on Ohio DOT contracts in the data, from 27 FEB 2020 to 29 OCT 2026, and was the low bidder on 6 of them (26%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $4,532,725
- Latest bid
- 29 OCT 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 5 | 3 | 60% |
| 2021 | 4 | 0 | 0% |
| 2022 | 3 | 0 | 0% |
| 2023 | 2 | 1 | 50% |
| 2024 | 5 | 1 | 20% |
| 2025 | 2 | 0 | 0% |
| 2026 | 2 | 1 | 50% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| WYA | 3 | 1 | 33% |
| HEN | 2 | 1 | 50% |
| VAN | 2 | 1 | 50% |
| MER | 2 | 0 | 0% |
| DEF | 2 | 0 | 0% |
| WOO | 2 | 0 | 0% |
| PUT | 1 | 0 | 0% |
| SAN | 1 | 0 | 0% |
| MAR | 1 | 0 | 0% |
| ALL | 1 | 0 | 0% |
| WIL | 1 | 1 | 100% |
| OTT | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 21 | 21 (100%) | $1.00 | $1.00 |
| Water | 659E35000 | MGAL | 20 | 13 (65%) | $1.00 | $1.00 |
| Aggregate base | 304E20000 | CY | 20 | 9 (45%) | $72.00 | $90.00 |
| Asphalt concrete surface course, type 1, (448), PG64-22 | 441E50000 | CY | 15 | 9 (60%) | $300.00 | $300.00 |
| Tack coat | 407E10000 | GAL | 14 | 9 (64%) | $1.00 | $3.25 |
| Asphalt concrete base, PG64-22 | 301E46000 | CY | 8 | 7 (88%) | $210.00 | $235.00 |
| Type A installation | 526E90010 | FT | 8 | 7 (88%) | $103.30 | $190.00 |
| Excavation | 203E10000 | CY | 22 | 6 (27%) | $20.00 | $27.00 |
| Seeding and mulching | 659E10000 | SY | 21 | 6 (29%) | $3.50 | $2.60 |
| Non-tracking tack coat | 407E20000 | GAL | 17 | 6 (35%) | $4.00 | $3.25 |
| 6" perforated corrugated plastic pipe | 518E40000 | FT | 15 | 6 (40%) | $10.00 | $10.03 |
| Compacted aggregate | 617E10100 | CY | 11 | 6 (55%) | $60.00 | $100.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Miller Bros Const Inc | 16 | 8 of 16 |
| Vernon Nagel Inc | 14 | 8 of 14 |
| Eagle Bridge Co | 13 | 7 of 13 |
| R & I Construction Inc | 11 | 5 of 11 |
| Complete General Construction Company | 6 | 1 of 6 |
| Great Lakes Demolition Company | 5 | 4 of 5 |
| Mosser Construction Inc | 4 | 2 of 4 |
| Rietschlin Construction Inc | 3 | 3 of 3 |
| E S Wagner Company | 3 | 2 of 3 |
| Brumbaugh Construction Inc | 3 | 3 of 3 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 29 OCT 2026 | 260476 | WOO | WOO-SR 281-11.91 Structure Repl (BRIDGE REPLACEMENT (1 BRIDGE)) | 6 of 7 | $1,183,723 | +24% |
| 19 FEB 2026 | 260092 | PAU | PAU-TR 33-04.75 (BRIDGE REPLACEMENT (1 BRIDGE)) | 1 of 3 | $1,136,845 | Low, 3.0% under the second |
| 25 SEP 2025 | 250445 | WOO | WOO-MR 746-00.05 Pemberville Brdg (BRIDGE REPLACEMENT (1 BRIDGE)) | 4 of 7 | $1,652,849 | +9.0% |
| 14 AUG 2025 | 250378 | FUL | FUL-SR 109-16.98 Bridge Replace (BRIDGE REPLACEMENT (1 BRIDGE)) | 4 of 4 | $1,208,647 | +12% |
| 14 NOV 2024 | 240540 | LOG | LOG-SR 273-00.02 (BRIDGE REPLACEMENT (1 BRIDGE)) | 2 of 3 | $1,176,757 | +6.0% |
| 26 SEP 2024 | 240442 | HAR | HAR-SR 81-06.36 (BRIDGE REPLACEMENT (1 BRIDGE)) | 1 of 5 | $1,188,994 | Low, 3.0% under the second |
| 25 JUL 2024 | 240382 | WYA | WYA-US 23-06.63 (INTERSECTION) | 6 of 6 | $463,934 | +65% |
| 23 MAY 2024 | 240309 | OTT | OTT-SR 51-03.85 (BRIDGE REPLACEMENT (1 BRIDGE)) | 3 of 6 | $1,333,527 | +17% |
| 11 JAN 2024 | 240021 | MER | MER-SR 29-07.80 (BRIDGE REPLACEMENT (1 BRIDGE)) | 4 of 5 | $1,615,274 | +23% |
| 28 SEP 2023 | 230482 | WIL | WIL-SR 34-15.50 Reline (CULVERT REPLACEMENT) | 1 of 2 | $533,014 | Low, 2.0% under the second |
| 14 SEP 2023 | 230442 | ALL | ALL-SR 115-01.11 (SLIDE REPAIR) | 2 of 6 | $698,104 | +16% |
| 15 SEP 2022 | 220506 | MAR | MAR-SR 423-02.14 (CULVERT REPLACEMENT) | 5 of 8 | $821,521 | +48% |
| 27 JAN 2022 | 220048 | DEF | DEF-US 127-05.56 (BRIDGE REPAIR) | 2 of 3 | $231,677 | +12% |
| 13 JAN 2022 | 220012 | HEN | HEN-US 6-16.37 Slide Repair (SLIDE REPAIR) | 3 of 4 | $493,123 | +14% |
| 16 DEC 2021 | 210669 | VAN | VAN-SR 49-05.24 (BRIDGE REPLACEMENT (1 BRIDGE)) | 4 of 7 | $1,015,322 | +9.0% |
| 01 APR 2021 | 210211 | SAN | SAN-US 6-23.58 Str Rplmnt (BRIDGE REPLACEMENT (1 BRIDGE)) | 6 of 6 | $792,891 | +45% |
| 28 JAN 2021 | 210052 | DEF | DEF-SR 66-04.37 (SLIDE REPAIR) | 2 of 5 | $558,562 | +9.0% |
| 14 JAN 2021 | 210028 | MER | MER-SR 716-05.02 (BRIDGE REPAIR) | 6 of 9 | $390,298 | +14% |
| 17 DEC 2020 | 200581 | VAN | VAN-Market Street Bridge (BRIDGE REPAIR) | 1 of 5 | $712,779 | Low, 2.0% under the second |
| 17 DEC 2020 | 200604 | PUT | PUT-SR 115-09.89 (BRIDGE REPLACEMENT (1 BRIDGE)) | 2 of 6 | $819,617 | +4.0% |
| 30 JUL 2020 | 203005 | WYA | WYA-SR 199 8.85 (BRIDGE REPLACEMENT (1 BRIDGE)) | 7 of 8 | $933,074 | +23% |
| 12 MAR 2020 | 200101 | HEN | HEN-Elm St Brdg Replace (BRIDGE REPLACEMENT (1 BRIDGE)) | 1 of 3 | $494,960 | Low, 8.0% under the second |
| 27 FEB 2020 | 200117 | WYA | WYA-Ogg Street Bridge (BRIDGE REPLACEMENT (1 BRIDGE)) | 1 of 5 | $466,132 | Low, 0.0% under the second |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.