Mosser Construction Inc: ODOT bid record
Mosser Construction Inc submitted 35 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 29 OCT 2026, and was the low bidder on 3 of them (9%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $10,768,212
- Latest bid
- 29 OCT 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 17 | 1 | 6% |
| 2021 | 8 | 1 | 13% |
| 2022 | 2 | 0 | 0% |
| 2023 | 3 | 1 | 33% |
| 2024 | 2 | 0 | 0% |
| 2026 | 3 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| SAN | 5 | 1 | 20% |
| HUR | 4 | 0 | 0% |
| LUC | 4 | 0 | 0% |
| WYA | 3 | 0 | 0% |
| MAR | 2 | 0 | 0% |
| MED | 2 | 0 | 0% |
| ASD | 2 | 0 | 0% |
| HAN | 2 | 0 | 0% |
| CRA | 2 | 0 | 0% |
| OTT | 2 | 0 | 0% |
| RIC | 2 | 1 | 50% |
| WOO | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 35 | 35 (100%) | $1.00 | $1.00 |
| Water | 659E35000 | MGAL | 34 | 23 (68%) | $1.00 | $1.00 |
| Commercial fertilizer | 659E20000 | TON | 33 | 15 (45%) | $600.00 | $850.00 |
| Guardrail, type MGS | 606E15050 | FT | 18 | 14 (78%) | $18.15 | $22.73 |
| Embankment | 203E20000 | CY | 31 | 13 (42%) | $12.00 | $25.00 |
| Repair seeding and mulching | 659E14000 | SY | 29 | 13 (45%) | $1.00 | $1.25 |
| Lime | 659E31000 | ACRE | 25 | 13 (52%) | $30.00 | $150.00 |
| Guardrail removed | 202E38000 | FT | 29 | 12 (41%) | $2.00 | $2.50 |
| Inter-seeding | 659E15000 | SY | 24 | 10 (42%) | $0.65 | $1.00 |
| Tack coat | 407E10000 | GAL | 21 | 10 (48%) | $2.50 | $3.25 |
| MGS bridge terminal assembly, type 1 | 606E35002 | EACH | 18 | 10 (56%) | $2,135.00 | $2,400.00 |
| Ground mounted support, no. 3 post | 630E03100 | FT | 17 | 10 (59%) | $14.00 | $15.20 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Miller Bros Const Inc | 20 | 13 of 20 |
| R & I Construction Inc | 17 | 11 of 17 |
| Vernon Nagel Inc | 16 | 9 of 16 |
| Shelly & Sands Inc | 13 | 5 of 13 |
| Great Lakes Demolition Company | 13 | 8 of 13 |
| Rietschlin Construction Inc | 11 | 3 of 11 |
| Eagle Bridge Co | 8 | 7 of 8 |
| Complete General Construction Company | 7 | 3 of 7 |
| Ruhlin Company | 6 | 2 of 6 |
| Eclipse Co LLC | 6 | 1 of 6 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 29 OCT 2026 | 260475 | WOO | WOO-IR 75-13.83 Deck Replacement (BRIDGE REPAIR) | 3 of 3 | $3,499,851 | +26% |
| 29 OCT 2026 | 260476 | WOO | WOO-SR 281-11.91 Structure Repl (BRIDGE REPLACEMENT (1 BRIDGE)) | 7 of 7 | $1,190,641 | +25% |
| 12 MAR 2026 | 268001 | WYA | WYA-US 30 Rest Areas TP (PARKING AREAS) | 6 of 10 | $3,598,720 | +6.0% |
| 23 MAY 2024 | 240309 | OTT | OTT-SR 51-03.85 (BRIDGE REPLACEMENT (1 BRIDGE)) | 6 of 6 | $1,538,928 | +35% |
| 25 JAN 2024 | 240079 | WYA | WYA-US 23-Rest Areas (MINOR RECONSTRUCTION) | 3 of 6 | $5,578,892 | +7.0% |
| 28 SEP 2023 | 230479 | RIC | RIC-SR 96-16.58 (BRIDGE REPLACEMENT (1 BRIDGE)) | 2 of 8 | $2,520,507 | +7.0% |
| 11 MAY 2023 | 230298 | RIC | RIC-SR 603-13.57 (BRIDGE REPLACEMENT (1 BRIDGE)) | 1 of 2 | $1,057,700 | Low, 2.0% under the second |
| 09 FEB 2023 | 230101 | OTT | OTT-SR 105-10.55 (BRIDGE REPLACEMENT (1 BRIDGE)) | 3 of 3 | $1,902,138 | +12% |
| 17 NOV 2022 | 220584 | LUC | LUC-SR 120-11.32 (BRIDGE REPLACEMENT (1 BRIDGE)) | 3 of 3 | $7,752,302 | +17% |
| 29 SEP 2022 | 220522 | HUR | HUR-SR 547-07.25 (BRIDGE REPLACEMENT (1 BRIDGE)) | 2 of 5 | $1,134,433 | +22% |
| 28 OCT 2021 | 210578 | LUC | LUC-IR 475-03.82 Brdg Redeck (BRIDGE REPAIR) | 4 of 4 | $2,207,542 | +22% |
| 14 OCT 2021 | 210550 | SAN | SAN-SR 19-15.31/17.15 Rehab (BRIDGE REPAIR) | 5 of 5 | $1,876,991 | +26% |
| 12 AUG 2021 | 210462 | LUC | LUC-SR 2-31.75 Bridge Repl (BRIDGE REPLACEMENT (1 BRIDGE)) | 2 of 3 | $1,210,160 | +5.0% |
| 27 MAY 2021 | 210336 | CRA | CRA-SR 100-22.23 (BRIDGE REPAIR) | 2 of 9 | $779,540 | +4.0% |
| 15 APR 2021 | 210243 | SEN | SEN-SR 19/SR 101-09.96/11.82/10.15 Stru (PART 1 AND PART 2) (CULVERT REPLACEMENT) | 3 of 8 | $855,712 | +2.0% |
| 01 APR 2021 | 210211 | SAN | SAN-US 6-23.58 Str Rplmnt (BRIDGE REPLACEMENT (1 BRIDGE)) | 3 of 6 | $653,394 | +20% |
| 14 JAN 2021 | 200569 | LOR | LOR-IR 90-17.85 (BRIDGE REPLACEMENT (2 BRIDGES)) | 1 of 9 | $9,154,904 | Low, 3.0% under the second |
| 14 JAN 2021 | 210003 | ASD | ASD-SR 302-09.34 (BRIDGE REPLACEMENT (1 BRIDGE)) | 8 of 12 | $802,377 | +13% |
| 03 DEC 2020 | 200578 | SAN | SAN-US 6-15.30 Slope Repair (SLIDE REPAIR) | 7 of 11 | $1,657,197 | +10% |
| 19 NOV 2020 | 200549 | MED | MED-US 42-02.47 (BRIDGE REPLACEMENT (1 BRIDGE)) | 6 of 13 | $946,592 | +13% |
| 05 NOV 2020 | 200517 | HAN | HAN-SR 698-04.73/05.76 (BRIDGE REPLACEMENT (2 BRIDGES)) | 9 of 9 | $1,830,412 | +17% |
| 05 NOV 2020 | 200522 | LUC | LUC-US 24-13.12 (BRIDGE REPAIR) | 3 of 5 | $1,858,276 | +8.0% |
| 05 NOV 2020 | 200526 | SAN | SAN-SR 19-00.24 Bridge Repl. (CULVERT REPLACEMENT) | 2 of 9 | $691,358 | +1.0% |
| 15 OCT 2020 | 200476 | MAR | MAR-US 23-01.85/02.04 (BRIDGE REPAIR) | 8 of 9 | $6,558,947 | +16% |
| 30 JUL 2020 | 203005 | WYA | WYA-SR 199 8.85 (BRIDGE REPLACEMENT (1 BRIDGE)) | 3 of 8 | $836,166 | +10% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.