ODOT letting results, May 11, 2023
45 contracts let by Ohio DOT on May 11, 2023, $121,543,560 in low bids, a median of 3 bidders per contract. On the 45 with an engineer's estimate, the low bid came in under it 22 times; median low bid 0.0% against the estimate.
- Owner
- Ohio DOT
- Contracts
- 45
- Low bids, total
- $121,543,560
- Data through
- 12 NOV 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 230245 | FRA-IR 270-51.50/FRA-US 23-4.19 (PART 1 AND PART 2) (INTERCHANGE) | FRA | 2 | Shelly & Sands Inc | $31,839,651 | $33,585,033 | +5.0% | +8.0% | ODOT |
| 230244 | TRU-SR 46/SR 82 DDI (INTERCHANGE) | TRU | 2 of 3 | $20,442,000 | $20,769,810 | +2.0% | +9.0% | ODOT | |
| 230243 | BRO-US 32-04.16 (INTERCHANGE) | BRO | 2 of 3 | John R Jurgensen Company | $17,950,936 | $20,136,933 | +12% | +4.0% | ODOT |
| 238003 | ATB-SR 531-13.50/15.85 (SLIDE REPAIR) | ATB | 7 | Marucci & Gaffney Excavating Co | $4,954,375 | $5,162,256 | +4.0% | -19% | ODOT |
| 230271 | SUM-IR 77/SR 21-22.25/VAR (FOUR LANE RESURFACING) | SUM | 3 | Shelly Company | $3,678,332 | $3,698,839 | +1.0% | +7.0% | ODOT |
| 230288 | D06-BP-FY23 (BRIDGE PAINTING) | District 6 | 6 | 360 Construction Company Inc | $3,136,735 | $3,528,515 | +12% | -20% | ODOT |
| 230283 | COS-SR 83-00.00 (TWO LANE RESURFACING) | COS | 2 | Shelly Company | $3,096,685 | $3,344,075 | +8.0% | +2.0% | ODOT |
| 230286 | CUY-US 6-23.30 (FOUR LANE RESURFACING) | CUY | 3 | Perk Company Inc | $2,918,594 | $3,228,095 | +11% | +27% | ODOT |
| 230289 | HAM-US 27-11.09 Sidewalks (SIDEWALK) | HAM | 2 | Prus Construction Company | $2,652,295 | $2,752,934 | +4.0% | +13% | ODOT |
| 230293 | LIC-SR 16/SR 79-VAR (BRIDGE REPAIR) | LIC | 2 | BCC Ohio Inc | $2,325,889 | $3,914,512 | +68% | -8.0% | ODOT |
| 230300 | STA-SR 172-25.53 (TWO LANE RESURFACING) | STA | 2 | Shelly Company | $2,127,029 | $2,628,003 | +24% | -6.0% | ODOT |
| 230308 | D05-/D06 ITS Expansion FY23 (SIGNALIZATION) | District 5 | 3 | Miller Cable Company | $2,046,500 | $2,068,176 | +1.0% | +11% | ODOT |
| 230306 | D04-SP FY2023 (East) (SPOT PATCHING / PAVEMENT REPAIR) | District 4 | 3 | Shelly Company | $1,629,255 | $1,828,000 | +12% | +1.0% | ODOT |
| 230291 | HEN-SR 108-17.40 Roundabout (INTERSECTION) | HEN | 3 | Vernon Nagel Inc | $1,524,056 | $1,597,882 | +5.0% | -11% | ODOT |
| 230290 | HAN-SR 103-00.00 (SIDEWALK) | HAN | 1 | Helms and Sons Excavating | $1,425,359 | -5.0% | ODOT | ||
| 230301 | TUS-New Phila Paving Phase 1 (TWO LANE RESURFACING) | TUS | 2 | Shelly Company | $1,289,241 | $1,394,493 | +8.0% | +7.0% | ODOT |
| 230312 | D09-GR-FY2023 (GUARDRAIL REBUILDING) | District 9 | 3 | PDK Construction Inc | $1,178,441 | $1,345,595 | +14% | -3.0% | ODOT |
| 230298 | RIC-SR 603-13.57 (BRIDGE REPLACEMENT (1 BRIDGE)) | RIC | 2 | Mosser Construction Inc | $1,057,700 | $1,076,453 | +2.0% | -13% | ODOT |
| 230297 | NOB-SR 146-16.35 (SLIDE REPAIR) | NOB | 3 | Alan Stone Co Inc | $1,039,630 | $1,091,483 | +5.0% | -6.0% | ODOT |
| 230307 | D05-PM FY2023 (C) R-WR (PAVEMENT MARKING) | District 5 | 2 | Griffin Pavement Striping LLC | $933,521 | $1,259,485 | +35% | +46% | ODOT |
| 230284 | CUY-LG FY2023 (LIGHTING) | CUY | 3 | Miller Cable Company | $865,500 | $928,534 | +7.0% | -1.0% | ODOT |
| 230285 | CUY-SR 82-09.12 (TWO LANE RESURFACING) | CUY | 4 | Ronyak Paving Inc | $860,895 | $988,000 | +15% | -6.0% | ODOT |
| 230315 | KNO-SR 3-19.76 (GUARDRAIL REBUILDING) | KNO | 4 | Lake Erie Construction Company | $856,420 | $861,741 | +1.0% | -5.0% | ODOT |
| 230313 | FRA-SR 665-SP FY23 General (SPOT PATCHING / PAVEMENT REPAIR) | FRA | 2 | Kokosing Construction Company Inc | $813,294 | $834,696 | +3.0% | 0.0% | ODOT |
| 230294 | MEG-Pomeroy Path Phase 4 (BIKEWAYS) | MEG | 1 | Shelly Company | $799,846 | +48% | ODOT | ||
| 230320 | VIN-SR 356-01.34 (SLIDE REPAIR) | VIN | 4 | Ohio-West Virginia Excavating Co | $799,407 | $849,812 | +6.0% | -12% | ODOT |
| 230303 | WAS-SR 821-08.69 (SLIDE REPAIR) | WAS | 3 | Alan Stone Co Inc | $799,006 | $834,056 | +4.0% | -13% | ODOT |
| 230311 | D08-ITS Maint FY 2023 (SIGNALIZATION) | District 8 | 1 | Bansal Construction Inc | $791,646 | -16% | ODOT | ||
| 230292 | LAK-Metroparks Lakefront Path (BIKEWAYS) | LAK | 2 | S E T Inc | $709,314 | $722,837 | +2.0% | -7.0% | ODOT |
| 230309 | D06-ITS Maintenance FY 23 (SIGNALIZATION) | District 6 | 2 | Complete General Construction Company | $665,036 | $906,313 | +36% | +16% | ODOT |
| 230319 | ROS-US 23-13.06 (LIGHTING) | ROS | 2 | Miller Cable Company | $646,500 | $787,060 | +22% | -11% | ODOT |
| 230314 | JEF-SR 151-12.45 (INTERSECTION) | JEF | 4 | Shelly & Sands Inc | $580,616 | $636,977 | +10% | -5.0% | ODOT |
| 233002 | MOE-TR 183-00.13 (BRIDGE REPLACEMENT (1 BRIDGE)) | MOE | 3 | Buds Inc | $548,885 | $617,000 | +12% | +34% | ODOT |
| 230302 | VIN-CR 7-03.00 (BRIDGE REPLACEMENT (1 BRIDGE)) | VIN | 2 | D G M Inc | $547,516 | $711,617 | +30% | +5.0% | ODOT |
| 230317 | MOE-SR 255-16.38 (SLIDE REPAIR) | MOE | 5 | Alan Stone Co Inc | $529,275 | $541,172 | +2.0% | -8.0% | ODOT |
| 230310 | D06-RPM FY23 (RAISED PAVEMENT MARKERS) | District 6 | 2 | A & A Safety Inc | $518,781 | $539,493 | +4.0% | +15% | ODOT |
| 230318 | MOE-SR 78-08.63 (MISCELLANEOUS) | MOE | 4 | Shelly & Sands Inc | $499,643 | $524,950 | +5.0% | +10% | ODOT |
| 230287 | D03-GR FY2023 NHS (GUARDRAIL REBUILDING) | District 3 | 1 | Lake Erie Construction Company | $498,625 | +22% | ODOT | ||
| 233003 | MOE-TR 2001-00.13 (BRIDGE REPLACEMENT (1 BRIDGE)) | MOE | 4 | Buds Inc | $488,989 | $581,300 | +19% | +5.0% | ODOT |
| 234016 | ATH-SR 13-00.46 (SLIDE REPAIR) | ATH | 1 | Alan Stone Co Inc | $429,870 | -11% | ODOT | ||
| 230305 | D03-LG TSG RM FY2023 (SIGNALIZATION) | District 3 | 1 | Perram Electric Inc | $319,179 | +14% | ODOT | ||
| 230304 | WYA-SR 67-24.06 (CULVERT REPLACEMENT) | WYA | 3 | D2 Excavating LLC | $294,140 | $370,224 | +26% | -17% | ODOT |
| 230295 | MOT-Webster St Ramp Connector (BIKEWAYS) | MOT | 4 | Outdoor Enterprise LLC | $249,565 | $258,663 | +4.0% | +12% | ODOT |
| 230316 | LAW-Dean State Forest Resurface (TWO LANE RESURFACING) | LAW | 2 | LR Chapman Paving Inc | $100,062 | $146,388 | +46% | -6.0% | ODOT |
| 230296 | MOT-Trotwood SRTS-Infras-FY23 (SIDEWALK) | MOT | 3 | L J Deweese Co Inc | $85,326 | $92,320 | +8.0% | +20% | ODOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out.